Loading...
Soils 366 10th St 2012 CY L E G A C Y 6424A EACH BOULEVARD C ENGINEERING INC JACKSONVILLE, FL 32216 Project No.: 904-721-1100 OFFICE 904-722-1100 FAX Report No.: Geotechnic I 1&Materials Engineering and Testing Page of I Lab No.: Report of In-Place Density (Asphalt or Soil) Tests or Coring for Thickness(--circle one--) Project: I Contractor: -i t_ N Method: Reported To: l Location by: 7777-- Location- + Course: Material: 1 "`'- Spec. Requirements: Date Tested: ". i 71 T Pass/ Location Elev/ Base/LR/ Dry Max. %of Moist Fail/ Depth/ Asphalt Density Dry Max % Retest Lift Thickness Density* Den *Source of Proctor(Project Number) P-Test Meets Specification Requirements F-Test Fails To Meet Specification Requirements R- Retest To Be Completed In Field Employee Name 4 ❑-Standby Time from to Total: Billing Comments 0-Job Time from ,` to Total: _ Trip Charge(Job Canceled) d-Travel Time from i to Total: (To job) _Out of Town Mobilization ❑-Travel Time from�—to Total: (From Job) City Total Hours: white copy-o ce use yellow copy-personal use pink cony-client use (DITce use