Agenda Item 4A PUBLIC WORKS and UTILITY DEPARTMENTS PROJECT STATUS REPORT (D)=DESIGN ENGINEER,(CE&I)=CONSTRUCTION ENGINEER&INSPECTION,(C)=CONTRACTOR,(VE)=VALUE ENGINEERING PROJECT DESCRIPTION PROJECT NO.AND INFORMATION STATUS ON 11/19/12 1 TMDL Wastewater Project (D)=J. Collins Engineering Assoc. Substantial completion inspection held on 11/19/12. Forcemain Construction = 100% (VE)=ATM Contractor finishing punch list items. WWTP#1 Construction =100% (C)=TB Landmark(Forcemain) Sludge & Odor Control =100% WPC Industrial Contractors(WWTP and Sludge&Odor Control) (CE&I)=J. Collins Engineering Assoc. 2 FY 12 Water Main Project (D)=Bowen Civil Engineers Bids received 5/2/12. Commission awarded entire project to Design = 100% (Survey)=L.D. Bradley Gruhn May, contingent upon approving Budget Modification Construction =90% (C)=Gruhn May Ordinance,approved 6/25/12. Preconstruction meeting held (CE&I)=Public Utilities 7/9/12. Completed replacement of water main on 12th St. from Ocean Blvd. to Beach Ave., 15th St.,and Ocean Blvd. from 14th to 16th St. Contractor replacing services. 3 FY 13 Sewer Rehabilitation (D)=Public Utilities Contracts awarded by Commission on 11/13/12. Project (C)=Insituform, CCI, Gruhn May Design=100% (CE&I)=Public Utilities/PW Construction = 0% 4 Donner Park Community Development Grant Projects a. New lighting for basketball (C)=Limbaugh Electric Complete courts b. Security lighting for Donner (C)=Limbaugh Electric Complete Community Center c. Grade and sod baseball field Complete C z d. Top Grade southern end Complete - of soccer field p N � (D)=ATM o e. Add paved parking (C)=ACD Marine d/b/a Complete N a A&E General Contractors