1909 Selva Marina DR (vault) (2) Date 1I./=,L.. 19
#ii�/7 _..FN$....._
CITY OF ATLANTIC BEACH
Valuation $
FLORIDA
Hoke # ....._.._.__.._._...__.._.
APPLICATION FOR BUILDING PERM7
Application is hereby made for the approval of the detailed statement of the plans and specifications herewith submitted for the
building or other structure described. This application is made in compliance and conformity with the Building Ordinance of
the City of Atlantic Beach, Florida, and all provisions of the Laws of the State of Florida, all ordinances of the City of Atlantic
Beach and all rules and regulations of the Building Department of the City of Atlantic Beach, shall be complied with, whether
herein specified or not.
The Contractor or Owner-Builder who has been issued a Building Permit is automatically responsible to ascertain that all sub-
contractors engaged by him are duly licensed in the City of Atlantic Beach,Florida. To prevent delay or embarrasment regard-
ing intermediate or final inspections it is suggested that a list of sub-contractors be submitted to this office so that licenses can
be verified.
Date is ._, ,2
Owner --6-y9!_ f1.1 /Wt. Address-.- t1.
,�C•f3r�... g4,1►�'-(-••--,*-6 Telephone No.�*f—§y' •Z-
Architect Avi
l �/4•/ti� ,••CGt•/-g Addresa ��,.Ff- �.-• �;y-L..,aZtt1e7:�Telepne No.. ,�s..
Contractor Builder ;.y* ,iv' f Address.2.f. � 7 Telephone No..Z 9-f.,. z.Y-.
Lot No...:;2;.! 11 N{� Block No..fv__C Sub Division---SE7 ,.V,9
IC:,�.-1�,4 F-c* F-• �-:.Street Side Between and Ste.
Valuation - .arc_-,�_sa.........�For what purpose will building be used Type of construction
Dimensions of Building Dimensions of Lot Size of Footings
Size of Piers Size of Sills Greatest Sill Span in ft. Type Roof
How will Building be Heated? Will Building be on Solid or Filled Ground?
Size of Ceiling Joists , Distance on Centers , Greatest Span.
Size of Floor Joists , Distance on Centers , Greatest Spa
Size of Rafters , Distance on Ce }e A.P.P.R.O.V.Z..0 , Greatest Span Pe
CITY OF ATLANTIC BEACH
D U I L O I N G OFFICE This rectangle is to represent the lot.
Locate the building or buildings in the
r„V j 4 4 �, j�8 right position. Give distance feet from
all lot-lines and existing buildings.
REAR LOT LINE
Two copier of plans and specifications shall fah,
be submitted with application. L46111\
Inspections required.
1. When steel is in place and ready to pour footing.
2. When steel is in place and ready to pour columns and/or lintel.
3. When steel is in place and ready to pour beam.
4. When framing is completed.
5. When rough plumbing is completed,and ready to cover up.
6. When septic tank drain field or sewer is laid but before it is covered. W W
7. Electrical inspection by City of Jacksonville.
8. Final inspection.
Note: In case of any rejection,re-inspection MUST be called for after
corrections are made.
FRONT OF LOT
In consideration of permit given for doing the work as described in the above statement, we hereby agree to perform said
work in accordance with the attached plans and specifications, which are a part hereof, and in accordance,with the building
regulations of the City of tlantic Beach.
Signature of Builder... .::. 4-r .....4..,^'.:.. Address...2.tl 0440 6. .51f ,V,cfi.R,v
Signature of Owe f 9 Z Y. ;�1 �"=+�•t l/yr rat' Address. fr Fs errt ', %.r...
t
CITY OF ATLANTIC BEACH
716 OCEAN BOULEVARD
ATLANTIC BEACH, FLORIDA
ADDENDUM_TO BUILDING PLAN
1. Building location: L.i.. UNir (0e 5e-4. V4 !44%i,/►44--- 004441 4 f. `0
2. The attached plan for the above building Is approved subject to meting the following
applicable construction requirements:
a. Footings shall be continuous monolithic concrete under exterior walls, reinforced with
two 5/8" deformed reinforcing rods for one-story buildings and these 5/S" deformed
reinforcing rods for two-story buildings. Reinforcing rods shall be placed in the
lower one-third of the footings, properly placed and fastened on metal sa les
with wire. Footings shall be six inches wider: on each side than the wall above,
shall be at least eight inches thick and shall rest on firm soil at least twelve
inches below undisturbed soil.
b. In hollow masonry unit construction, each unit cell shall be reinforced with at
least one No. 4 bar at all corners, poured and tamped with concrete; such
reinforcing shall be properly tied into the footing and spandrel beam.
c. All wood truss rafters (roof construction) , shall be securely fastened to the
exterior walls with approved hurricane anchors or clips.
d. Construction of nearby one-family dwellings, whi.eh are duplicates or intensely
similar, shall be avoided. Such similarity considers the external configuration
and appearance (i.e. , roof, outmr wall materials, window size and design, and
other like characteristics) of structures. in accord with the foregoing, similar
or duplicate homes shall not be constructed within close proximity of each
other, and shall be at least 500 feet apart if any one similar dwelling is
visible from any other similar dwelling.
e. The final conneoctfon between the house plumbing drain and the sewer service
connection (at the property line) most be inspected by the City before being
covered.
City Manager
The undersigned hereby certifies that he has read the above and understands that this
addendum takes precedence over any contrary details to the plans and specifications
and agrees to comply with the intent of this addendum.
.////74e /_fir_ ._..,_
Coast ractor/OVnez
--.- !a. 2'7
�. Date
-. .. :FORGO=123- -_ g
'=F;f��-- FLORIDA MODEL ENERGY EFFICIENCY `CODE
,t '
FOR BUILDING CONSTRUCTION
s-.;y BOB GRAHAM SECTION g GOVERNOR'S ENERGY OFFICE
"„4;� GOVERNOR. POINTS METHOD LEX HESTER,DRECTOR
Dttal
PREPARED BY:BRABHAM KUHNS DEBAY-CONSULTING ENGINEERS .
i
.
PROJECT NAME 1_0 r 2 a vAiir /41 a ,s-ez7�9 /49,o//,�h z)
__
AND NUMBER M
BUILDER E i��/f// .//yC
a, OWNER OWNER . .
, STATISTICAL DATA
ZONE: FLOOR AREA ROOF R-VALUE HEATING SYSTEM TYPE
•
2(gt sq.ft R- 3 d STRIP: ❑ HT.PUMPE GAS; ❑ OIL: ❑ SOLAR: ❑
t
EPI WALL AREA WALLR-VALUE HOT WATER SYSTEM TYPE
2.9&)sq.f t R- )9 ELECTRICa HT.REC.: n GAS: ❑ OIL: ❑ SOLAR: ❑
A/C SYSTEM GLASS AREA WALL CONSTRUCTION NUMBER OF UNITS PER STRUCTURE
EER- % 3 /1 sq.ft. CBS: ❑ FRAME: g SING.FAM. DUPLEX. ❑ TRIPLEX: ❑ OVER 3 : ❑
koi THIS DATA TO BE SENT TO THE GOVERNOR'S ENERGY OFFICE
TOTAL HOUSE POINTS`'
CERTIFIED BY
f. //Z . _.LJ�/.r/,,
EPI- f DATE
/
�7-isl-;�i17, �i,-„, �u:lq�Ti'4I -<.Iiti16.I AO I4 _�_.- - .. i
. FORM 900-123
� l'",-E FLORIDA MODEL ENERGY EFFICIENCY CODE
�''�� FOR BUILDING CONSTRUCTION
::::r
BOB GRAHAM SECTION 9 GOVERNOR'S ENERGY OFFICE
V -`� GOVERNOR POINTS METHOD LEX HESTER,DIRECTOR
PREPARED BY:BRABHAM KUHNS DEBAY-CONSULTING ENGINEERS J
l
PROJECT NAME L o r z C cJai, /o c S-ea9 /1g6ie/rl/, -C1
AND NUMBER ,9d Q ,ig /�J�,P,' ,,a 1 .�, r
. /2 ..`//2,v)1/5c--- Vhf-/9 c 4 /-/o.P,'d'4
BUILDER /(E//�/v/ //4_ ,l9//ff /9,,5,,),/
` OWNER , ,/f i
STATISTICAL DATA
ZONE: FLOOR AREA ROOF R-VALUE HEATING SYSTEM TYPE
2( ' sgft. R- 3 p STRIP: ❑ HT.PUMPX GAS. ❑ OIL: ❑ SOLAR: ❑
EPI WALL AREA WALL R-VALUE HOT WATER SYSTEM TYPE
2/a)sq.ft R- )1 ELECTRIC• HT. REC.: ❑ GAS: ❑ OIL: ❑ SOLAR' ❑
A/C SYSTEM GLASS AREA WALL CONSTRUCTION NUMBER OF UNITS PER STRUCTURE
EER- 2 3 /1 sq.ft. CBS: ❑ FRAME: kt SING.FAM. DUPLEX; ❑ TRIPLEX: ❑ OVER 3 : ❑
‘ THIS DATA TO BE SENT TO THE GOVERNORS ENERGY OFFICE i
n
TOTAL HOUSE POINTS CERTIFIED BY 1
EPI- /2 DATE L
`Fewer total points mean greater energy savings. La Z Q J
SOLAR WATER HEATER CALCULATION 1
NUMBER OF BEDROOMS IN HOUSE
h.
HOT WATER TANK CAPACITY
TANK CAPACITY PER BEDROOM(=tank capacity:number of bedrooms)
DCR OF COLLECTOR (daily collection rate in Btu's at I22°F,from Mfr.data) .. ,., t , _ .;:"
DCR PER BEDROOM (=DCR-number of bedrooms) _ � �
HOT WATER POINTS (from table9c)
`Attach copy of collector rating certificate. Collector must be mounted within 30° of south. 1
HEAT RECOVERY UNIT CALCULATION
NUMBER OF BEDROOMS IN HOUSE 4M I
HOT WATER TANK CAPACITY '"
TANK CAPACITY PER BEDROOM (=tank capacity = number of bedrooms) a `:' :7:.; ;.;.,
HRU CERTIFIED RATING (In Btuh per ton) *,,,i : ��9
BACK-UP SYSTEM (electric or gas)
1
HOT WATER POINTS ( from table 9c)
Attach copy of HRU's rating certificate indicating output in Btuh/ton when operating with proposed A/C system.
FLORIDA MODEL ENERGY EFFICIENCY CODE
FOR BUILDING CONSTRUCTION
HOUSE POINTS CALCULATION
FORM 900-123 ZONES -123
WINTER GROSS 1 SUMMER GROSS
WINTER _SUMMER
COMPONENT AREA WPM = POINTS COMPONENT AREA SPM -POINTS
emni._ W RO-2.9 31 . 4 w RO-2.9 16.2 N.
F-
w R3-3.9 18. 3 W R3-3.9 10.9
(n Z 9 R4-5.9 15. 6 U) Z of R4-5.9 9.9
J o m R6aUP 13. 1 J 0 m R6aUP 9.2
J Y� RO-10,9 26. 1 Q
Q Y cc RO-10.9 20.0
2vw RII-18.9 7. 8 gUw RII-I8.9 9.2
xmw RI9SUP 2'00 4. 9 / 7 o xmw RI9&UP 2 /G® I 5•6 13,/yd
1Lco> ti.co> i
SOLID WOOD Y 247. 7 /Q4c3 u) SOLID WOOD 12, 36. 4 /,'L4/
X INSULATED R5 235. 5 IO INSULATED R5 14.5
0 STORM DOOR 124. 4 0 STORM DOOR 29.0 •
0 STORM DOOR R5 117. 1 CI STORM DOOR R5 11.6
U RO-I0.9 63.4 v RO-I0.9i 32. 9 \
1- RII-18.9 8. 3 17- RII-18,9 8.8
cr RI9-21.9 5.0 cc R19-21.9 5. 5
o Z R22-29,9 4. 1 C7 z R22-29,9 5.0
_Z D R30aUP 2$$' 3. 3 $ Sy� Z ° R30aUP 2f9 3.7 X1. '79
-J >- _ R 0-5,9 63. 4 _J J R 0-5.9 3219
m
W R6-7.9 14.2 W 2 - R6-7.9 14 .9
V a Q R8-9.9 10. 9 0 a R8-9.9 11. 3
w RIO-11,9 _ 9.2 _ o R10-11.9 9.5
z z RI2-18.9 6. 7 0 Z RI2-I8.9 7.0
N RI9&UP ..- 5.0 c5 RI9aUP 5. 5 J
e w O° RO-6.9 29.2 o R 0-6.9 43.7 1
a 3 R7-10.9 9.6 3 R7-10.9 5.5
RII-18.9 7. 0 a a. RII-18.9 3.7
CC ■ RI9aUP 4. 5 1C R19aUP 2.2
0 oz w 1 RO-2.9 c'e 36.6 ql/7$1 0 O w R0-2.9 46.5
--I Z w R3-5.9 18.3 -J Z
' w R3-5.9 11.6
D v R6-I0.9 11.6' W D v R6-10.9 6.2
C oZ RII-18.9 7. 3 j RII-18.9 3.8
` o U R19 a UP 4. 9 U R19 a UP 2. 2
r
m-o _EDGE INSULATION PERIMETER' W-54-1-64'"*------ 7 -7
Q �.w R0.- 2.9 , 300 92. 7 27e/6
;J " � . R3 - 5.9 69.5
z
�� 4 R6a Us 46. 4
SINGLE DOUBLE 1
OR. AREA SINGLE DOUBLE WO F G W P OR. AREA CLR. TIN. CLR.'TIN.
SO F G S P
N act 157. 4 120.8 /,/o j1-03 N ;y 146 123 120 101 7,6D 5yeO
NE 157. 4 12 0. 8 NE 221 186 190 159
E 9e 157. 4 120. 8 , ,y _/0 763 E 9d 289 242 251 209 , f 2/Z 3 c
SE 157. 4 120. 8 SE 261 219 226 189
S_/2 ,15714 120.8 , 76 //3Pii- S ii y 190 160 160 134 4/ /eery
U) SW 157. 4 120. 8 SW 261 219 226 189
W /'/ 157. 4 120.8 .of i /rf Q W /7/ 289 242 251 209 I V e 3??
< NW 15784 12068 NW 221 186 190 159
J J 89 408 432 360
C9 H 4 H 46, 4 -
79. 3
` H= HORIZONTAL GLASS (SKYLIGHT;) FOR TINTED GLASS S.C.$ 083 SEE SEC.902.2(d),
OTA
T L GROSS WINTER POINTS / /3 TOTAL GROSS SUMMER POINTS /074‘3
I I
ACV' 4,8100-
f-- 6 I"FIBERGLASS ) 2) '/ 1. 1 5 72 y
t' H o W I" FIBERGLASS /07CG3 1. 15 /2,31/k
or' 2- 1.5° FIBERGLASS 1.12 j 1.5��FIBERGLASS 1.12 0
DUCT IN COND. SP 1.00 0 E DUCT IN COND. SP _ 1.00
I I
HSM from table 9A 2[e0 -zx , 38 & S I CSM from table 9B X23,/ X , /.9 ./
AVOW AlligtW
FLOOR AREA (DIVIDE) n‘7 = Zf 3 3 FLOOR AREA (DIVIDE) / (/'/( +2.r." -
-RCP- 44711-
WINTER POINTS (WP) 33 SUMMER POINTS (SP)
CREDIT POINTS
from table 9 D CEILING FANS MULTIZONE A/C VENTILATION OTHER TOTAL CP
NOT MORE THAN 10 TOTAL CREDIT POINTS.
PENALTY POINTS wail IN COND SPACE INOPERABLE WINDOWS OTHER TOTAL PP from table 9E _
/FORM 900-I23 TOTALS ZONES-I23'
WINTER POINTS SUMMER POINTSIIICOTWATER POINT CREDIT POINTS PENALTY POINTS '
77 EPI
3 3 ; ( � I `__ I I
FEWER TOTAL POINTS ARE ENCOURAGED FOR MAXIMUM ENERGY SAVINGS NOT TO EXCEED 100 f
,------------ ,
, v , cr
'rr CITY OF � _61 •d_ 7-8Y6
/Was ear-14-61
Official �3/
Office of Bu INSPECTION �5 3,
REQUEST FOR Permit No.
CA•M._l District No. /•,
Date _P M
Time / s.O .-- Locality
Received ' i i /c-
lob Address Contractor HEATING
PLUMBING ❑
ELECTRICAL ........❑ Rough ....❑
Owner's PLASTERING .Rough a Final Heater ❑
0 Name ❑ Rough Wring F nal Water
BUILDING ire .....'.. ..0 Finish Wiring •..0 Sewers ........❑
Foundation ar 0 Fixtures Gas
Chimney Scratch •... 0 Motors 00 Gasspool [[��77/
Brown ........
..0 TemP Pole Ce Cesspool
Framing '' ection.❑ Water ''' A.M.
Final Finish 0 Final Insp P.M.
Footing Wallboard INSP C ION Fri.
Slab READY FOR Thurs.
Lintel Beam - / ed. M.Tues. P.M.
Mon. �� r
I
Ail
Inspection Made /�
MOO Inspector 2 , Li:
r
(4"1P)s CITy OF
c,......._ id
Office
of Oding Official s...---""---"""------s...---""---"""------".//
".,,,/,_5--„ ,REQUEST FR INSPECTION --- //Cate ■
Time
Received
A.M.
) • Permit No. / .
Ste i
Job Address S fL�� District No.
Owner's
r
Name ,_, -
BUILDING ..- Locality
Chimney ❑ PLASTERING Contractor
❑ wire ELECTRICAL f'•Framing :. .... P•
Footing”"
❑ Scratch Rough Wiring PLUMBING
Slab ��� •�❑ Brown � •�❑ Fixtures Wiring �'� Rough• ❑ Finish ❑ Final HEATING
Lintel Beam.. .... ...❑ Motors ...❑ Sewers ., . ..❑ Rough
...O Wallboard .. ❑ Temp-Pole.... ❑ s ers ❑ Final ❑
Mon. ' '❑ Final Inspection. esspool• ••.0 Water Heater
•Tues. READY F : °p_out :::�
OR INSPECTIpNater :: :8
Inspection Made ed.
Inspector Thurs.
_ Fri. A.M.
A.M.
- f P.M. P.M.
%/
Jr
4
CCITY OF
J
411caffic /.'each_42lati 4
Office of Building Official
Date — //_ EQUEST FOR INSPECTION
Time �t�/V
Received_ Permit No.
/ District No. yVi�
Job Address e , ,/� i� i
Owner's s O �°'
^ Locality
BUILDING PLASTERING Contractor s/.e
Foundation ELECTRICAL �A ��t/
Foundation .•..❑ Wire PLUMBING
Framing ,,::'''❑ Lath ;:;.0 Rough Wiring HEATING
. o
Final ,,. '- ❑ Scratch '.0 Finish Wiring :.0 Rough NG
.❑ Scratch ..0 Fixtures '.❑ Final 0 Rough
Footing .... ........❑ Motors '.0 Sewers . ❑ Final
Slab .''''..❑ Finish ... G s .O Water Heater
Lintel Beam .. 0 Wallboard .._ '' Temp-Pole 0 Final Inspection etepool .,.
' Top-out 0
Mon. READY FOR INSPECTION
..::: ;;;�
Tues. '
/_ ed.
Inspection Made A.M.
Fri.
Inspector A.M. P.M.
P.M.
1
n , � iv / 1 /
Jv" e
i
/02.'o o PYei9,sW- . , .
`44.. CITY OF ....i
411.40die L eac1i-41ivcica
Office of Building Official
R EQUEST FOR INSPECTION L�
Date // �3 .p/ Permit No. < GP‘5
Time /o2.�S ,/P
Received M
M J District No. Uv/Q
/96, 9 ..re/v.; /J7.g,e►,y,4 2.�
Job Address Locality
Owner's •
Na me / P / Contractor /12`G/7/44/
L -� C
1
BUILDING PLASTERING ELECTRICAL PLUMBING HEATING
Foundation ..❑ Wire •Chimney ❑ Lath ❑ Rough Wiring ..❑ Rough ❑ Rough ❑
Framing ❑ Scratch ❑ Finish Wiring ..❑ Final ❑ Water ❑
❑ Motors ❑ Sewers ❑❑ Water Heater ..❑
Final ❑ own ❑ Motors ❑ Gas
Footing •••"Finish ❑ Temp-Pole ❑ Cesspool ❑
Slab ❑ Wallboard ❑ Final Inspection.❑ Top-out ❑
Lintel Beam ...❑ Water ❑
READY FOR INSPECTION A.M.
Mon. Tues. We.. - u• Fri. P.M.
i
A.M.
Inspection Made .� . M
'ir if) I
Inspector
>1....
� c04 1 / ' ,04ss, 6
7 /°
CCITY OF CV
,qI 44ic !eacII-410/ricia
Office of Building Official
_REQUEST FOR INSPECTION
���
/a../y ki Permit No.
Date , . U I f(
Time rQ 3E) District No. �4v
Received
/9 o9 cc/ei /72 ,,,,/,v.s-
Locality
Job Address ,�j
Owner's Contractor 424i�/ �4'f
Name HEATING
BUILDING PLASTERING ELECTRICAL PLUMBING Rough ❑
Rough Wiring ..❑ Rough
Chimney ....❑ Wire ❑ Final ❑ Final ❑
Framing ❑ Lath ❑ Finish x r Wiring ❑ Sewers ❑ Water Heater ..❑
Framing ❑ Brown ❑ Motors ❑ Gas ❑
Final ❑ Brown ❑ Motors ❑ Cesspool ❑
Footing ❑ Finish ❑ Temp-Pole ❑ Top-out ❑
Slab b W
❑ Wallboard ❑ Final Inspection.E1 Water ❑
Lintel Beam ...❑ A.M.
READY FOR INSPECTION P M
Mon. Wed
hurs. Fri.
J A.M.
Inspection Made Amami mar M V,
Inspector T► / 'rte
Pie iak CITY OF t. ,--(2_,...S
j. 411cadie Beadt-qlwricia
Office of Building Official
REQUEST FOR INSPECTION ys3
/�, C Permit No. /
Date
Time y�OS� ;) District No.. AV
Received / ' ' e �n A/g//4
/� /!�'/� Locality
Job Address
Owner's f l Contractor
A t aim
Name Al PLUMBING HEATING
PLASTERING ELECTRICAL
BUILDING Rough ❑
Rough Wiring ..❑ Rough ❑ Final ❑
Foundation Lath ❑0 Finish Wiring ..❑ Final ❑ Water Heater ..❑
Chimney ❑ Fixtures ❑ Sewers 0 Framing ❑ Brown ❑ Motors ❑ Gas
Final 0 Brown ❑ Temp-Pole ❑ Cesspool ❑
Footing Wallboard ❑ Final Inspection.❑ Top-out ❑
Slab ❑ Wallboard ❑ Water ❑
Lintel Beam ...❑ A.M.
READY FOR INSPECTION, Fri. P.M.
Wed. _.hurs.
Mon. Tues.
— IP A.M.
P.M.
iv
Inspection Made .4' _ f Inspector / r /
CITY OF •
716 OCEAN BOULEVARD—DRAWER 25 •
(IOW ATLANTIC BEACH`FLORIDA 32233
.11*,"ice$-4∎-4!'. svtg.t..':'e7!'h F.'$: ',..-4"16X.'
0 03/3 -7/
BUILDING PERMIT NO.# f1,5/c ELECTRICAL PERMIT NO.#f3/y-/1eS
/t
PLUMBING PERMIT NO.# 4/Y-.r5 ktl� u/� x
s eG'
ied. K
1
•
JOB ADDRESS /9e 9 ,,..S-'e%L9 n2i0A0i,em
CONTRACTOR / eyI/ A.'/ ...1NC°•
OWNER - ,7P(�yA.V/. , it'e
DATE REMARKS INSPECTOR
•
FOUNDATION 107 -/7'g/ j- . / 14i-""
FOOTING /1-e.2 3-S/ 4:).,•.... ,...4_44t1id_c7w,•2.4
SLAB
PLUMBING (R) ,/v-/6-- a/ diC '
TOP-OUT /-.2g---8-2- d/C .� -A
SEWER
//-/J-J-/ p/C. F ��,1,,
TEMPORARY POLE //- 9'- g/ Dl ?�,C. .>?7/,-e
LINTEL/BEAM
COLUMN
E LECTRICAL (R) /- 2e--k-a- Dom /Ltd �.
,/L
PLUMBING (F) _ .
FRAMING '/) (F ? J D`'vr.°L, ` C77`
-.PR--
ELECTRICAL (F)
GRADES SHOT
CLEARING LOT
OTHER
FINAL INSPECTION
WILLIAM S. HOWELL _ JAMES E. MHOON ALAN C. JENSEN L. W. MINTON. JR_ CATHEF.INE G. VAN t.ESS
Mayor-Commissioner Commissioner Commissioner Commissioner C:.--r.r- !stoner
BILL M. DAVIS OLIVER C BALL' MRS. ADELAIDE R. TUCKER CARL STUCKI .1
C;ty Ayer City -.torney City Cle•k-Trez�Jic-_Co-r p;•n;ier Ct e• Y -'ice ^• - _: �s
at-ic Firs