Loading...
Agenda Item 4APUBLIC WORKS and UTILITY DEPARTMENTS PROJECT STATUS REPORT (D) = DESIGN ENGINEER, (CE &I) = CONSTRUCTION ENGINEER & INSPECTION, (C) = CONTRACTOR, (VE) = VALUE ENGINEERING PROJECT DESCRIPTION PROJECT NO. AND INFORMATION STATUS ON 1/11/13 1 TMDL Wastewater Project (D) = J. Collins Engineering Assoc. Substantial completion inspection held on 11/19/12. Forcemain Construction =100% (VE) = ATM Contractor finishing punch list items. WWTP41 Construction =100% (C) = TB Landmark (Forcemain) Sludge & Odor Control = 100% WPC Industrial Contractors (W)VTP and Sludge & Odor Control) (CE &I) = J. Collins Engineering Assoc. 2 FY 12 Water Main Project (D) = Bowen Civil Engineers Bids received 5/2/12. Commission awarded entire project to Design = 100% (Survey) = L.D. Bradley Gruhn May, contingent upon approving Budget Modification Construction = 95% (C) = Gruhn May Ordinance, approved 6/25/12. Preconstruction meeting held (CE &I) = Public Utilities 7/9/12. Completed replacement of water main on 12`h St. from Ocean Blvd. to Beach Ave., 15'h St., and Ocean Blvd. from 14'' to 16'h St. 3 FY 13 Sewer Rehabilitation Project (D) = Public Utilities Contracts awarded by Commission on 11/13/12. Design =100% (I) = Insituform, CCI, Gruhn May Construction underway. Construction = 60% (CE &I) = Public Utilities/PW 4 Water Main Replacements on (D) = Bowen Civil Engineers Survey and design underway. Pine St. and Wonderwood Rd. (C) (CE &n = Public Works/Public Utilities �a c -c cc N� o� w Y BUILDING DEPT. MONTHLY ACTIVITY REPORT COMPARISON REPORT REPORT FOR THE MONTH OF DECEMBER 2012 COMPARISION 2011 - 2012 PERMIT TYPE NUMBER OF PERMITS TOTAL INSPECTIONS YTD 2011 YTD 2012 YTD 2011 YTD 2012 YTD 2011 YTD 2012 SINGLE FAMILY 34 27 $ 3,726,000.00 $ 8,277,045.00 DUPLEX 0 0 $ REMODEL/ADDITIONS 464 278 $ 8,071,534.00 $ 4,932,682.00 COMMERCIAL NEW 3 0 $ 823,000.00 OTHER 1530 2494 $ 3,781,845.00 $ 9,356,778.00 TOTAL 2031 2799 $ 16,402,379.00 $ 22,566,505.00 4006 4751 FOR THE MONTH OF DECEMBER 2012 PERMITS ISSUED NO.PERMITS 3 PERMIT COST $ 1,290.00 CONSTRUCTION VALUE $ 415,000.00 INSPECTIONS PERFORMED BUILDING 118 SINGLE FAMILY NEW DUPLEX MULTI FAM ELECTRICAL 78 RESIDENTIAL ADDITIONS 2 $ 285.00 $ 28,000.00 PLUMBING 35 COMMERCIAL NEW MECHANICAL 38 COMERCIAL ADDITIONS 2 $ 187.50 $ 15,000.00 MISC. 8 COMMERCIAL ALTERATIONS 2 $ 352.50 $ 36,485.00 PERMITS MISC 20 $ 1,610.00 TOTAL 277 ELECTRICAL 66 $ 5,881.20 $ 107,960.00 MECHANICAL GAS 5 $ 470.00 MECHANICAL HVAC 26 $ 2,758.00 PLUMBING 1 17 Is 1,684.00 ROOFING 16 $ 1,445.00 $ 123,545.00 WINDOW /DOOR 13 $ 860.00 $ 45,818.00 DEMOLITION 1 $ 100.00 REINSPECTION FEES Proiects to Note FOUNDATION OCCUPANCY INSPECTIONS 2 $ 200.00 New SFR 1345 Ocean Blvd PENALTY FEES 9 $ 949.00 $ 14,005.00 New SFR 650 Orchid St SIGNS New SFR 660 Orchid St y FENCES 4 $ 140.00 z DRIVEWAYS 2 $ 105.00 t WELL 1 $ 79.00 SIDING 6 $ 442.50 $ 28,290.00 IQ oc t SWIMMING POOL 2 $ 322.50 $ 33,000.00 0 TOTAL 199 $ 19,161.20 $ 847,103.00 W