1
TMDL Wastewater Project
(D) = J. Collins Engineering Assoc.
Substantial completion inspection held on 11/19/12.
Forcemain Construction =100%
(VE) = ATM
Contractor finishing punch list items.
WWTP41 Construction =100%
(C) = TB Landmark (Forcemain)
Sludge & Odor Control = 100%
WPC Industrial Contractors (W)VTP and
Sludge & Odor Control)
(CE &I) = J. Collins Engineering Assoc.
2
FY 12 Water Main Project
(D) = Bowen Civil Engineers
Bids received 5/2/12. Commission awarded entire project to
Design = 100%
(Survey) = L.D. Bradley
Gruhn May, contingent upon approving Budget Modification
Construction = 95%
(C) = Gruhn May
Ordinance, approved 6/25/12. Preconstruction meeting held
(CE &I) = Public Utilities
7/9/12. Completed replacement of water main on 12`h St.
from Ocean Blvd. to Beach Ave., 15'h St., and Ocean Blvd.
from 14'' to 16'h St.
3
FY 13 Sewer Rehabilitation Project
(D) = Public Utilities
Contracts awarded by Commission on 11/13/12.
Design =100%
(I) = Insituform, CCI, Gruhn May
Construction underway.
Construction = 60%
(CE &I) = Public Utilities/PW
4
Water Main Replacements on
(D) = Bowen Civil Engineers
Survey and design underway.
Pine St. and Wonderwood Rd.
(C)
(CE &n = Public Works/Public
Utilities
�a
c
-c
cc
N�
o�
w Y
BUILDING DEPT. MONTHLY ACTIVITY REPORT
COMPARISON REPORT
REPORT FOR THE MONTH OF DECEMBER 2012
COMPARISION 2011 - 2012
PERMIT TYPE NUMBER OF PERMITS TOTAL INSPECTIONS
YTD 2011 YTD 2012 YTD 2011 YTD 2012 YTD 2011 YTD 2012
SINGLE FAMILY 34 27 $ 3,726,000.00 $ 8,277,045.00
DUPLEX
0
0
$
REMODEL/ADDITIONS
464
278
$ 8,071,534.00
$ 4,932,682.00
COMMERCIAL NEW
3
0
$ 823,000.00
OTHER
1530
2494
$ 3,781,845.00
$ 9,356,778.00
TOTAL
2031
2799
$ 16,402,379.00
$ 22,566,505.00
4006
4751
FOR THE MONTH OF DECEMBER 2012
PERMITS ISSUED
NO.PERMITS
3
PERMIT COST
$ 1,290.00
CONSTRUCTION VALUE
$ 415,000.00
INSPECTIONS PERFORMED
BUILDING 118
SINGLE FAMILY
NEW DUPLEX MULTI FAM
ELECTRICAL
78
RESIDENTIAL ADDITIONS
2
$ 285.00
$ 28,000.00
PLUMBING
35
COMMERCIAL NEW
MECHANICAL
38
COMERCIAL ADDITIONS
2
$ 187.50
$ 15,000.00
MISC.
8
COMMERCIAL ALTERATIONS
2
$ 352.50
$ 36,485.00
PERMITS MISC
20
$ 1,610.00
TOTAL
277
ELECTRICAL
66
$ 5,881.20
$ 107,960.00
MECHANICAL GAS
5
$ 470.00
MECHANICAL HVAC
26
$ 2,758.00
PLUMBING
1 17
Is 1,684.00
ROOFING
16
$ 1,445.00
$ 123,545.00
WINDOW /DOOR
13
$ 860.00
$ 45,818.00
DEMOLITION
1
$ 100.00
REINSPECTION FEES
Proiects to Note
FOUNDATION
OCCUPANCY INSPECTIONS
2
$ 200.00
New SFR 1345 Ocean Blvd
PENALTY FEES
9
$ 949.00
$ 14,005.00
New SFR 650 Orchid St
SIGNS
New SFR 660 Orchid St
y
FENCES
4
$ 140.00
z
DRIVEWAYS
2
$ 105.00
t
WELL
1
$ 79.00
SIDING
6
$ 442.50
$ 28,290.00
IQ
oc t
SWIMMING POOL
2
$ 322.50
$ 33,000.00
0
TOTAL
199
$ 19,161.20
$ 847,103.00
W