Loading...
1575 Sherry Dr (vault) Instructions to Builders and Contractors building or working in the Town of Atlantic Beach 1. No work on any building shall be started without obtaining the necessary permit. 2. No changes in the approved plan shall be made without the approval of the building inspector. 3. Inspections: The following inspections shall be called for: A. Foundation, when steel is in place. B. plumbing, rough. C. Lintle, when steel is in place. D. Framing, bel"ore any wall covering is placed. E. Electrical, City of Jacksonville . F. Septic tank or sewer, before covering. C. Plumbing, final. H. Final, when all work is complete . he ssary pection ,any concrete or uncoveredoatrthewregUesttof theeBuildings shall be removedved Inspector. 4. After the final inspection and upon submission of a drawing showing the size and location of completed building on lot to the Building Inspector a CertifbefoVe reosaidcupancy certificateliseissuedd. No building shall be occupied 5. Plumbing permit does not cover sewer connection permit . 6. All contractors and sub-contractors shall have occupational license issued mi Town CoontractorscshallBeach furnish certificatework of liability theTown Limits. insurance when obtaining license. 7. The penalty for violation of any provision of the Building Code Q_11 of Ordinance X186, shall oconviction forthereof exceedin�;punished days,Vore not exceeding x,500.0 imprisonment by both such fine and imprisonment . 8. Copies of The Southern Standard f wilding CCode and Ordinance #186 are available at the Town g. When a sidewalk exist� across classfront cond3t�.onubefor� finalsaid inapectionik shall be placed in fist is requested. I have read and been furnished a copy of the above instructions in connection with Building Permit No. Date Signed � Q FOR OFFICE USE ONLY Date.-/r-----/J-----------19a 00 Permit A;-7,- Fee$---if-/-/--------- ------------------------ TOWN OF ATLANTIC BEACH Valuation-$-/3.J—Z-2 V----'00 ------------------- �w FLORIDA House #------------------------ --- --------------------------- -Pete --------- APPLICATION FOR BUILDING PERMIT ---------------------------------------------------------------------------- Application is hereby made for the approval of the detailed statement of the plans and specifications herewith submitted for the building or other structure described. This application is made in compliance and conformity with the Building Ordinance of the Town of Atlantic Beach, Florida, and all provisions of the Laws of the State of Florida, all ordinances of the Town of Atlantic Beach and all rules and regulations of the Building Department of the Town of Atlantic Beach, shall be complied with, whether herein specified or not. The Contractor or Owner-Builder who has been issued a Building Permit is automatically responsible to ascertain that all sub- contractors engaged by him are duly licensed in the Town of Atlantic Beach, Florida. To prevent delay or embarrasment regard- ing intermediate or final inspections it is suggested that a list of sub-contractors be submitted to this office so that licenses can be verified. Date---- -----------------------------y 19------------ Xv--- ----------------- --- ---------------___-----_----------------Address------------------------------------------------------------Telephone No------------------- Architect------- -------------�­ --- - -----Address---------------- -----------------------------------Telephone No.--------------_------------ ---------- -------------------- ---- --------- Contractor Builder, Divi 1----- LOKI, ---�elephone No.1)(00-2fto!;Td? l--Q------------------------------Block No------ S----------------Sub S-on -----Zone----------------- L -----_/ _9-- ---------- -"k�A�� No. Side Between---------&I----------------------------------an6ffJ4J#0_4r----C�P-------------Sts. ------------------ Street------A --- -- ---- -j(-R S'Type of c'onstruction-.CC-Al-f---.?A.<-.-- -------For what purpose will building be used-flEs Va at2h Dimensions of Building_------ -_...___Dimensions of Lot--_.I% ----- _._1-7 ----------Size of Footings____keArIZ-0-------- fir. Size of Piers -Y-10--t"00----------Size of Sills.__-Z/)(00 -- -- ---------Greatest Sill Span in ... Z4� .......Type R,,f-F ------ How will Building be Heated?-Foev --1-----)9_-�_q_q-----------------.-Will Building be on Solid or Filled Ground?-._04).D-------------------- ------------------------ Size of Ceiling Joists___;0__X___(,............ -------- Distance on Centers--- ------------------­-------- Greatest Span.. I I ------------------------- Greatest Span---------------- 11 " of Floor Joists-----�iz­-(-,e----------------------Distance on Centers----- 16- 42.1 11 Size of Rafters-----------.2 46-----------------------Distance on Centers___..._/Z---..----------------------, Greatest Span------.f ---------------- This rectangle is to represent the lot. Locate the building or buildings in the right position. Give distance in feet from all lot-lines and existing buildings. REAR LOT LINE Two copies of plans and specifications shall be submitted with application. Inspections required. 1. When steel is in place and ready to pour footing. 2. When steel is in place and ready to pour columns and/or lintel. Z Z 3. When steel is in place and ready to pour beam. 4. When framing is completed. 0 5. When rough plumbing is completed,and ready to cover up. 6. When septic-tank drain field is laid but before it is covered. 7. Electrical inspection by City of Jacksonville. 8. Final inspection. Note: In case of any rejection,re-inspection MUST be called for after corrections are made. FRONT OF LOT (W In consideration of permit given for doing the work as described in the above statement, we hereby agree to perform said work in accordance with the attached plans and specifications, which are a part he f, and in accordance with the building regulations of the Town IvAtlantic Bea qkv;' Addre,4,/ ---------------------- k-i Signature of BuilderJe_., - ----- Signatureof Owner--- ----------------------------------------------------- Address.-..-----------------------------------------------------------------------------------------------