Loading...
1600 Sherry Dr (vault) FOR OFFICE USE ONLY �o­­%3---------195Y Date-----9�1....... 0 .0 Permit #'X3 ...Fee$---46- IWN OF ATLANTIC BEACH Valuation $---Id-4,60 J0---10---11�1---------------- (W FLORIDA House #-.--------------------------------------------------------- -----------X&-Ib---0----- 7---------- APPLICATION FOR BUILDING PERMIT ---------------------------------------------------------------------------- ---------------------------------------------------------------------------- Application is hereby made for the -approval of the detailed statement of the plans and specifications herewith submitted for the building or other structure described. This application is made in compliance and conformity with the Building Ordinance of the Town of Atlantic Beach, Florida, and all provisions of the Laws of the State of Florida, all ordinances of the Town of Atlantic Beach and all rules and regulations of the Building Department of the Town of Atlantic Beach, shall be complied with, whether herein specified or not. The Contractor or Owner-Builder who has been issued a Building Permit is automatically responsible to ascertain that all sub- contractors engaged by him are duly licensed in the Town of Atlantic Beach, Florida. To prevent delay or embarrasment regard- ing intermediate or final inspections it is suggested that a list of sub-contractors be submitted to this office so that licenses can_ be verified. -- 7 S Date...... ----------------------40------- 195- --- -----------------------Address----------------------------------------------------------Telephone No---------------------------- Architect-------------------------------------------------------------------------------------------.-Address------------------------------------------------------------Telephone No--------------------------- -'�v ---------------------------------------Telephone No------- ------------------ Contractor Builder........5, .17Y e-------------------------------------------Address--------------------- ----------------Sub Division------------------------------------------------------------------------------Zone----------------- Lot No,.69;.�Irf..41ah-----Block No--------------- -A;e2,o...JA.CP.ff. 'Dr—Street--------------------------Side Between-----------------------------------------------.-and------------------------------------------------------Sts- 00 Valuation $-----4256-2vr!re�-For what purpose will building be used------- ---- --- -------------------Type of construction------------------------------ Ir ' �� -...:;iA--b--------------- ------------Dimensions of Lot----------- ----------------------Size of Footings --X �w Dimensions of Building--- 4� 4m Size of Piers------------------------------------Size of Sills----- ------ -----------Greatest Sill Span in ft--------------------------Type Roof How will Building be Heated?--------- -----------------------------------------------.-Will Building be on Solid or Filled Ground?---------------------------------------- Size of Ceiling Joists------------------------------------...... Distance on Centers----------- ------- -------------------. Greatest Span----------------------------- Size of Floor Joists---­------ ----­----------------------.1 Distance on Centers------- --------------------------------- Greatest Span-------------­--------- ----------------- -0 P -- - ---------- Size of Rafters-----------Y-x---g---------------------- Distance on Centers- ----- ------------ -.--, Greatest Spa-------- --- This rectangle is to represent the lot. Locate the building or buildings in the right position. Give distance in feet from all lot-lines and existing buildings. REAR LOT LINE Two copies of plans and specifications shall be submitted with application. Inspections required. 1. When steel is in place and ready to pour footing. �4 Z Z 2. When steel is in place and ready to pour columns and/or lintel. 3. When steel is in place and ready to pour beam. E-4 E-4 4. When framing is completed. 5. When rough plumbing is completed,and ready to cover up. 6. When septic tank drain field is laid but before it is covered. U2 7. Electrical inspection by City of Jacksonville. 8. Final inspection. Note: In case of any rejection,re-inspection MUST be called for after corrections are made. FRONT OF LOT rforin said In consideration of permit given for doing the work as described in the above statement, we hereby agree to pe work in accordance with the attached plans and cifications, which are a part hereof, and in accordance with the building regulations of the Town of I nti B c .A�t ant/iAB s-------------------------------------------------------------------------- ------ ---- ---- - ----------- .... Signature of Builder......?—-- ----- - ---------- ddress - ------------------------------------------------------------- FOR OFFICE USE ONLY Date---- ------195-J Permit VooW --------___c3_Fee $------4/ 0 TOWN OF ATLANTIC BEACH Valuation ------- FLORIDAHouse #----------------------------------------------------------- ---------------- Azt-_ APPLICATION FOR BUILDING PERMIT --------------------------------------------------------------------------- --------------------------------------------------------------------------- Application is hereby-made for the approval of the detailed statement of the plans and specifications herewith submitted for the building or other structure described. This application is made in compliance and conformity with the Building Ordinance of the Town of Atlantic Beach, Florida, and all provisions of the Laws of the State of Florida, all ordinances of the Town of Atlantic Beach and all rules and regulations of the Building Department of the Town of Atlantic Beach, shall be complied with, whether herein specified or not. utomatically responsible to ascertain that all sub- The Contractor or Owner-Builder who has been issued a Building Permit is a contractors engaged by him are duly licensed in the Town of Atlantic Beach, Florida. To prevent delay or embarrasment regard- ing intermediate or final inspections it is suggested that a list of sub-contractors be submitted to this office so that licenses can be verified. "V De------ -------------------- 7 -------------------------------------------Telephone No----------------------------- (4tgre ... Telephone No----------------------------- Owner---------- -----------------7.: Archite -------------Address.--------------------------------------------------------- c or Bjn*lder----J__ - -----------Address-----------------------------------------------------------Telephone No__---------------------- Contra t ---15-S rA, _;4-__' --I-- - __-/7-Sub Division------------------------------------------------------ --------------------Zone 'Y Lot Nc ts 16,00--- -----------Street---------------- -- -----Side Between----------------------------------------------------and------------------------------------------------ S 00 ed-_/9,1_0......'�Xlvo_Type of construction-A"0/211- ----- Valuation $__13 0----For what/urpose will building be us Size of Footings-__8-X 7_0 -- ------------- .....Dimensions of Lot Dimensions of Building.__O�Z/x ( 'y 1 0 P ----------------------------rype Raof&"/"�_ Size of Piers_X4_,X_T' 4_)(/e._Size of Sills------------------- ---- ------Greatest Sill Span in ft. How will Building be Heated?------"r.0 12 e---------------------------------....Will Building be on Solid or Filled Ground?------------/0--tv---------------- -5 Ts...........V_"_z-_-)_//------------- Greatest Span------'7-4--------------------------- Size of Ceiling Joists--, ----------------- Distance on Cente .... Size of Floor Joists-------------------- ---------------.- Distance on Centers----------- ------------------------------- Greatest Span------------------------------------------ Size of Rafters--------------------------------------- ---------, Distance on Centers ------------------------------- Greatest Span---------------- -------------------------- This rectangle is to represent the lot. Locate the building or buildings in the right position. Give distance in feet from ,all lot-lines and existing buildings. REAR LOT LINE Two copies of plans and specifications shall be submitted with application. Inspections required. 1. When steel is in place and ready to pour footing. 4 1 Z 2. When steel is in place and ready to pour columns and/or lintel. 3. When steel is in place and ready to pour beam. 0 4. When framing is completed. �4 5. When rough plumbing is completed,and ready to cover up. 6. When septic tank drain field is laid but before it is covered. 7. Electrical inspection by City of Jacksonville. 8. Final inspection. Note: In case of any rejection,re-inspection MUST be called for after corrections are made. FRONT OF LOT In consideratia. err iven fo doing t"ork as described in the above statement, we hereby agree to perform said f t* s, which are a part hereof, and in accordance with the building n Itph attach plans n ica ion work in accordance regulations of the T antic B ............... Address---------------------------------------------------------------------------------------------- Signature of Build ----- . ... ...... Signatureof owner- ----------------- ----------------------------------------------------- Address-----------------------­­---------------------------------------------------------------------- Instructions to Builders and Contractors building or working In the Town of Atlantic Beach 1. No work on any building shall be started without obtaining the necessary permit. 2. No changes in the approved plan shall be made without the approval of the building Inspector. 3. Inspections: The following inspections shall be called for: A. Foundation, when steel is In place . B. Plumbing, rough. C. Lintle, when steel Is in place. D. Framing, before any wall covering Is placed. E. Electrical, City of Jacksonville . F. Septic tank or sewer, before covering. 0. Plumbing, final. H. Final, when all work Is complete . Any concrete poured or work covered without the necessary inspection shall be removed or uncovered at the request of the Building Inspector. 4. After the final Inspection and upon submission of a drawing showing the size and location of completed building on lot to the building Inspector a Certificate of Occupancy shall be issued. No building shall be occupied before said certificate is issued. 5. Plumbing permit does not cover sewer connection permit . 6. All contractors and sub-contractors shall have occupational license issued by Town of Atlantic Beach before doing any work within the Town Limits. Contractors shall furnish certificate of liability insurance when obtaining license. 7. The penalty for violation of any provision of the Building Code cr of Ordinance #186, shall upon conviction thereof be punished by fine not exceeding $500-00 or Imprisonment for not exceeding 90 days, or by both such fine and imprisonment . 8. Copies of The Southern Standard Building Code and Ordinance #186 are available at the Town Hall for reference. 9. When a sidewalk exists across front of building lot, said sidewalk shall be placed in first class condition before final inspection is requested. I have read and been furnished a copy of the above instructions in connection with Building Permit No. Date Signed FISHERANDMARSHALL ARCHITECTS 8 0 0 L 0 M A X S T R E E T J A C K S 0 N V I L L E 4 , F L 0 R I D A May 21, 1958 To WHOM IT MAY CONCERN: submitted for We., the undersigned, do hereby swear that the plans approval to the City of Atlantic Beach, Florida, for the Pro Shop of the Selva Marina County Club conform to the requirements of the Southern Standard Building Code 1953-1954 Revision as to strength, stresses5 strains� loads and stability. qeILL17M H.-MARS MORG'-F Associated Atchitect Associated Architect Sworn to and subscribed before me this al5t-day of Notary Public State of Florida Notary Public-'JOA",� County,State of my Commission Expires J (j-q D A w WHK:rh MAY 2 2 1958 8 THE CITIY Or jk--LA',j- I il JU