Loading...
Permit Mech 1764 Live Oak Ln 2013 CITY OF ATLANTIC BEACH 800 SEMINOLE ROAD ATLANTIC BEACH, FL 32233 INSPECTION PHONE LINE 247-5814 Application Number . . . . . 13-00002211 Date 2/22/13 Property Address . . . . . . 1764 LIVE OAK LN Application type description MECHANICAL HVAC ONLY Property Zoning . . . . . . . TO BE UPDATED Application valuation . . . . 3900 ---------------------------------------------------------------------------- Application desc REPLACE CU/AHU ---------------------------------------------------------------------------- Owner Contractor ------------------------ ------------------------ STROHECKER LARRY G NORTHPORT CONSTRUCTION GROUP 1764 LIVE OAK LANE NORTHPORT HGT AND AIR ATLANTIC BEACH FL 32233 6653 POWERS AVE # 29 JACKSONVILLE FL 32217 (907) 731-8248 ---------------------------------------------------------------------------- Permit . . . . . . MECHANICAL HVAC PERMIT Additional desc . . REPLACE 1 CU 1 AHU Permit Fee . . . . 107 . 00 Plan Check Fee . 00 Issue Date . . . . Valuation . . . . 0 Expiration Date . . 8/21/13 ---------------------------------------------------------------------------- Other Fees . . . . . . . . . STATE MECH DCA SURCHARGE 2 . 00 STATE MECH DBPR SURCHARGE 2 . 00 ---------------------------------------------------------------------------- Fee summary Charged Paid Credited Due ----------------- ---------- ---------- ---------- ---------- Permit Fee Total 107 . 00 107 . 00 . 00 . 00 Plan Check Total . 00 . 00 . 00 . 00 Other Fee Total 4 . 00 4 . 00 . 00 . 00 Grand Total 111 . 00 111 . 00 . 00 . 00 PERMIT IS APPROVED ONLV IN ACCORDANCE WITH ALL CITV OF ATLANTIC BEACH ORDINANCES AND THE FLORIDA BUILDING CODES. MECHANICAL PERMIT APPLICATION CITY OF ATLANTIC BEACH 800 Seminole Rd Atlantic Beach, FL 32233 Ph(904) 247-5826 Fax (904) 247-5845 JOB ADDRESS: / 7 � I/ Vt5- 0 /9 k- L^1 9T1-9,1vr1C 6C11CH PERMIT # PROJECTVALUE $ 3 , 900 , vo ARI# 5399519 REQUIRED NEW AIR CONDITIONING & HEATING SYSTEM INSTALLATION Air Conditioning: Unit Quantity Tons Per Unit Heat: Unit Quantity BTU's Per Unit Seer Rating Duct Systems: Total CFM REQUIRED REPLACEMENT AIR CONDITIONING & HEATING SYSTEM INSTALLATION Air Conditioning: Unit Quantity i Tons Per Unit 1-/ Heat: Unit Quantity I BTU's Per Unit_Y_6 L-Oo Seer Rating__L� -C,C-6'k Duct Systems: Total CFM REQUIRED FIRE PREVENTION Fire Sprinkler System Quantity (Requires 3 sets of plans) Fire Standpipe Quantity (Requires 3 sets of plans) Underground Fire Main Value (Requires 3 sets of plans) Fire Hose Cabinets Quantity (Requires 3 sets of plans) Commercial Hoods Quantity (Requires 3 sets of plans) Fire Suppression Systems Quantity (Requires 3 sets of plans) FIRE PLACES MISCELLANEOUS: Prefabricated Fireplace Qty Automobile Lifts Gas Piping Outlets Boilers BTU's Elevators/Escalators ALL OTHER GAS PIPING Heat Exchanger Quantity of Outlets Pumps #Vented Wall Furnaces Refrigerator Condenser BTU's # Water Heaters Solar Collection Systems Tanks (gallons) Wells OTHER: Permit becomes void if work does not commence within a six month period or work is suspended or abandoned for six months.I hereby certify that I have read this application and know the same to be true and correct. All provisions of laws and ordinances governing this work will be complied with whether specified or not. The permit does not give authority to violate the provisions of any other state or local law regulation construction or the performance of construction. Property Owners Name !�,7'/Z 0 H C- C k 6 k A /2 R PhoneNumber /v,ig rAf rog r coovs Te vc F� v 6jec; vp Mechanical Company 0 6 A. ve/z rY ?o/Z r HC-47-lAo 4 1-y,6 4/4 Office Phone ?!,/- 92 YXFax Co. Address: 139'� CV6P-LCC /Z 6 City -S-,'?CKW- PIQC State r-e zip 3 22 /9 License Holder(Print): -71�'542atyctA/ U( State Certification/Registration# 0-1A 0-19-50 0 39 Notarized Signature of Licens;Hold'er et dayof 2 0 Be ALUIR HADZIC < MY COMMISSION 0 EE867056 Signature of Notary Public EXPIRES Jwxm"22,2017 Awftftwyo —* .am Load Short Form Job: 1764 Live Oak Lane Date: 02120/2012 Entire House By: David C Brown ConsultAir, LLC Jacksonville,Fl 32207 Phone:(904)402-1463 Fax:(904)800-1222 Web:www.LoadCalculations.com Project Information For: NorthPort Heating and Air 1764 Live Oak Lane,Atlantic Beach, FIL 32233 Design Information Htg Cig Infiltration Outside db(*F) 39 92 Method Simplified Ins ide db('F) 68 75 Construction quality Average Design TD(*F) 29 17 Fireplaces 1 (Semi-loose) Daily range - L Inside humidity(%) 50 50 Moisture difference(gr/lb) 23 55 HEATING EQUIPMENT COOLING EQUIPMENT Make Nordyne Make Nordyne Trade Trade Model JT4BD-048K Cond JT4BD-048K AHRI ref 5389518 Coil B6BM-X48K-C AHRI ref 5389518 Efficiency 8 HSPF Efficiency 11.0 EER, 13 SEER Heating input Sensible cooling 32550 Btuh Heating output 46000 Btuh @ 47-F Latent cooling 13950 Btuh Temperature rise 27 *F Total cooling 46500 Btu h Actual air flow 1550 cfm Actual air flow 1550 cfm Air flow factor 0.042 cfm/Btuh Air flow factor 0.050 cfm/Btuh Static pressure 0.50 in H20 Static pressure 0.50 in H20 Space thermostat Load sensible heat ratio 0.89 ROOM NAME Area Htg load Cig load Htg AVF CIg AVF W) (Btuh) (Btuh) (cfm) (cfm) Room3 2323 37339 31279 1550 1550 Entire House d 2323 37339 31279 1550 1550 Other equip loads 0 1707 Equip. @ 0.97 RSM 32029 Latent cooling 4240 TOTALS 1 2323 1 37339 1 36269 1550 1550 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2013-Feb-21 12:38 45 + wrightsoft' Right-Suitell)Universal 2012 12.1.05 RSU1 5431 Page 1 C:\Users\ConsultAir\Desktop\l 764 Live Oak Lane.rup Calc=MJ8 Front Door faces: E Job: 1764 Live Oak Lane Building Analysis Date: 0212012012 Entire House By: David C Brown ConsultAir, LLC Jacksonville,Fl 32207 Phone:(904)402-1463 Fax:(904)800-1222 Web:www.LoadCalculations.com ------------------- Project Information For: NorthPort Heating and Air 1764 Live Oak Lane,Atlantic Beach, FL 32233 Design Con tions Location: Indoor: Heating Cooling Mayport Ns, FL, US Indoor temperature(T) 68 75 Elevation: 13 ft Design TD (T) 29 17 Latitude: 30*N Relative humidity 50 50 Outdoor: Heating Cooling Moisture difference(gr/lb) 23.4 55.4 Dry bulb(T) 39 92 Infiltration: Daily range(T) - 15 ( L Method Simplified Wetbulb(*F) - 78 Construction quality Average Wind speed(mph) 15.0 7.5 Fireplaces 1 (Semi-loose) Component Btu h/ft2 Btuh %of load Walls 7.3 14294 38.3 Glazing 16.9 3616 9.7 Doors 11.5 704 1.9 Ceilings 0.9 1516 4.1 Floors 3.6 8384 22.5 Infiltration 2.4 4076 10.9 Ducts 4749 12.7 Piping 0 0 'F­ Humidification 0 0 Ventilation 0 0 0.1.40 Adjustments 0 Total 37339, 100.0 Component Btu h/ft2 Btuh %of load Walls 5.4 10496 31.8 Glazing 34.6 7398 22.4 Doors 12.1 745 2.3 Ceilings 1.7 2815 8.5 Floors 0 0 0 Infiltration 0.6 932 2.8 Ducts 6774 20.5 Ventilation 0 0 Internal gains 2120 6.4 Blower 1707 5.2 Adjustments 0 Total 32986 100.0 Latent Cooling Load 4240 Btuh Overall U-\ralue=0.158 Btuh/ft2-'F Data entries checked. 2013-Feb-21 12:38:45 + wrights*ft' Right-Suite(D universal 2012 12.1.05 RSU15431 Page 1 CAUsersXConsultAir\Desktop\1 764 Live Oak Lane.rup Calc=MJ8 Front Door faces: E Component Constructions Job: 1764 Live Oak Lane Date: 02/20/2012 Entire House By: David C Brown ConsultAir, LLC Jacksonville,Fl 32207 Phone:(904)402-1463 Fax:(904)800-1222 Web:www.LoadCalculations.com Project Information For: NorthPort Heating and Air 1764 Live Oak Lane,Atlantic Beach, FL 32233 Design Conditions Location: Indoor: Heating Cooling Mayport Ns, FL, US Indoor temperature(T) 68 75 Elevation: 13 ft Design TD (T) 29 17 Latitude: 30*N Relative humidity(%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/lb) 23.4 55.4 Dry bulb(T) 39 92 Infiltration: Daily range(*F) - 15 L Method Simplified VVet bu I b(*F) - 78 Construction quality Average Wind speed(mph) 15.0 7.5 Fireplaces 1 (Semi-loose) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain f[2 Btu)ff-*F ft`-*F/Btuh BtLh/fj2 Btuh Bbhm Btuh Walls 12A-Obw:Firm wall,brk 4"ext,ZW"wood frm n 393 0.253 0 7.44 2926 5.57 2190 e 302 0.253 0 7.44 2248 5.57 1682 S 328 0.253 0 7.44 2436 5.57 1823 w 403 0.253 0 7.44 2995 5.57 2241 all 1426 0.253 0 7.44 10605 5.57 7936 Partitions 12A-Osw:Frm wall,1/2"gypsum board int fnsh,2"M"wood frm 523 0.240 0 7.06 3689 4.90 2560 Windows I D-c2ov:2 glazing,cir outr,air gas,vnl frm mat,c!r innr,1/4"gap,1/8" n 6 0.570 0 16.8 98 16.4 96 thk;40% blinds 45',light;50%outdoor insect screen;1.5 ft overhang (1.5 ft window ht,10 ft sep.) 1 D-c2ov:2 glazing,clr outr,air gas,vnl frm mat,clr innr, 1/4"gap,1/8" n 13 0.570 0 16.8 209 16.4 205 thk;40%blinds 45',light;50%outdoor insect screen;1.5 ft overhang S 13 0.570 0 16.8 209 20.0 249 (2.5 ft window ht,10 ft sep.) w 6 0.570 0 16.8 105 48.1 300 all 31 0.570 0 16.8 524 24.2 755 1 D-c2ovd:2 glazing,dr outr,air gas,vni frm mat,dr innr,1/4"gap,1/8" n 40 0.570 0 16.8 674 16.4 660 thk;40% blinds 45o,light;50%outdoor insect screen;1.5 ft overhang w 34 0.600 0 17.6 591 25.0 838 (6.7 ft window ht,10 ft sep.) all 74 0.600 0 17.2 1265 20.3 1497 1 D-c2ov:2 glazing,cir outr,air gas,vni frm mat,clr innr, 1/4"gap,1/8" e 20 0.570 0 16.8 335 48.1 962 thk;40%blin ds 45 o,lig ht;50%outdoo r inse ct sc reen;1.5 ft ov erhan g w 20 0.570 0 16.8 335 48.1 962 (4 ft window ht,1 Oft sep.) all 40 0.570 0 16.8 670 48.1 1923 1 D-c2ov:2 glazing,cir outr,air gas,vni frm mat,clr innr,1/4"gap,1/8" e 30 0.570 0 16.8 496 48.1 1422 thk;40%blinds 45*,light;50%outdoor insect screen;1.5 ft overhang w 30 0.570 0 16.8 496 48.1 1422 (5 ft Window ht,10 ft sep.) all 59 0.570 0 16.8 992 48.1 2845 1 D-c2ov:2 glazing,cir outr,air gas,vni frm mat,cir innr,1/4"gap,1/8" w 4 0.570 0 16.8 67 48.1 192 thk;40%blinds 45*,light;50%outdoor insect screen;1.5 ft overhang (2 ft winaow ht,10 ft sep.) Doors 11 DO:Door,wd sc type e 40 0.390 0 11.5 461 12.1 488 in 21 0.390 0 11.5 243 12.1 257 all 61 0.390 0 11.5 704 12.1 745 2013-Feb-21 12:38:45 WrilightSOft' Right-Suites U niversal 2012 12.1.05 RStJ1 5431 Page I C:\Users\ConsultAir\Desktop\1764 Live Oak Lane.rup Calc=MJ8 Front Door faces: E Ceilings 16B-30ad:Attic ceiling,asphalt shingles roof mat,r-30 cell ins,5/8" 1611 0.032 30.0 0.94 1516 1.75 2815 gypsum board int fnsh Floors 22A-tph:Bg floor,heavy damp soil,on grade depth,tile fir fnsh 210 1.358 0 39.9 8384 0 0 2013-Feb-21 12:38:45 wrightsoft' Right-SuitelD Universal 2012 12.1.05 RSU1 5431 Page 2 C:\UsersNConsultAir\Desktop\l 764 Live Oak Lane.rup Calc=MJ8 Front Door faces: E Job: 1764 Live Oak Lane Project Summary Date: 02/20/2012 Entire House By: David C Brown ConsultAir, LLC Jacksonville,Fl 32207 Phone:(904)402-1463 Fax:(904)800-1222 Web:www.LoadCalculations.com Project Information For: NorthPort Heating and Air 1764 Live Oak Lane, Atlantic Beach, FL 32233 Notes: Design Information Weather: Mayport Ns, FL, US Winter Design Conditions Summer Design Conditions Outside db 39 *F Outside db 92 *F Inside db 68 'F Inside db 75 *F Design TD 29 'F Design TD 17 *F Daily range L Relative humidity 50 % Moisture difference 55 gr/lb Heating Summary Sensible Cooling Equipment Load Sizing Structure 32590 Btuh Structure 24505 Btuh Ducts 4749 Btuh Ducts 6774 Btuh Central vent(0 cfm) 0 Btu h Central vent(0 cfm) 0 Btu h Humidification 0 Btuh Blower 1707 Btuh Piping 0 Btuh Equipment load 37339 Btuh Use manufacturer's data n Rate/swing multiplier 0.97 Infiltration Equipment sensible load 32029 Btuh Method Simplified Latent Cooling Equipment Load Sizing Construction quality Average Fireplaces 1 (Semi-loose) Structure 2665 Btu h Ducts 1576 Btuh Heating Cooling Central vent(0 cfm) 0 Btuh Are a(ft2) 2323 2323 Equipment latent load 4240 Btuh Volume(ft3) 18580 18580 Air changes/hour 0.41 0.16 Equipment total load 36269 Btuh Equiv.AVF(cfm) 126 50 Req.total capacity at 0.70 SHR 3.8 ton Heating Equipment Summary Cooling Equipment Summary Make Nordyne Make Nordyne Trade Trade Model JT4BD-048K Cond JT4BD-048K AHRI ref 5389518 Coil B6BM-X48K-C AHRI ref 5389518 Efficiency 8 HSPF Efficiency 11.0 EER, 13 SEER Heating input Sensible cooling 32550 Btuh Heating output 46000 Btuh@47-F Latent cooling 13950 Btuh Temperature rise 27 *F Total cooling 46500 Btuh Actual air flow 1550 cfm Actual air flow 1550 cfm Air flow factor 0.042 cfm/Btuh Air flow factor 0.050 cfm/Btuh Static pressure 0.50 in H20 Static pressure 0.50 in H20 Space thermostat Load sensible heat ratio 0.89 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2013-Feb-21 12:38:45 wrllghtSOft' Right-Suite@ Universal 2012 12.1.05 RSU1 5431 Page 1 c:\users\consultAir\Desktop\1764 Live Oak Lane.rup Calc=MJ8 Front Doorfaces: E AED Assessment Job: 1764 Live Oak Lane Date: 02120/2012 Entire House By: David C Brown ConsultAir, LLC Jacksonville Fl 32207 Phone:(904)402-1463 Fax:(904)800-1222 Web:www.LoadCalculations.com Project Information For: NorthPort Heating and Air 1764 Live Oak Lane,Atlantic Beach, FL 32233 Design Conditions Location: Indoor: Heating Cooling Mayport Ns, FL, US Indoor temperature(OF) 68 75 Elevation: 13 ft Design TD(OF) 29 17 Latitude: WON Relative humidity 50 50 Outdoor: Heating Cooling Moisture difference (gr/lb) 23.4 55.4 Drybulb(OF) 39 92 Infiltration: Daily range(OF) - 15 L VVet bulb(OF) - 78 Wind speed(mph) 15.0 7.5 V Test for Adequate Exposure Diversity Hwrly Gazing Load 1Q00D-- ........................... ...... .............. 9,OOD-- �(M-- 7.aDt QOM- UOD-- 4,000--- ZOOD-- ZC00--- 1,OOD--- 0 1 i i- i i i i i 8 9 10 11 12 13 14 15 16 17 18 19 Z) -hr d DW HouAy A..g. Maximum hourly glazing load exceeds average by 31.2%. House does not have adequate exposure diversity (AED), based on AED limit of 30%. AED excursion: 89 Btuh (PFG - 1.3*AFG) 2013-Feb-21 12:38:45 -I- + wrightsOft' Right-SuiteS Universal 2012 12.1.05 RSU1 5431 Page I kb� C:\Users\ConsultAirNDesktop\l 764 Live Oak Lane.rup Calc=MJ8 Front Door faces: E Right-JO Worksheet Job: 1764 Live Oak Lane Entire House Date: 02120/2012 By: David C Brown ConsultAir, LLC Jacksonville,FI 32207 Phone:(904)402-1463 Fax:(904)800-1222 Web www LoadCalculat ions.corn I Room ame Entire House Room3 2 Exposed wall 210.0 ft 210.0 ft 3 Room height 8.0 ft d 8.0 ft heat/cool 4 Room dimensions 1�0 x 2322.5 ft 5 Room area 2322.5 ft2 232Z5 ft2 Ty Construction U-value, Or HTM Area (f t2 Load Area (f t2 Load number Btuh/ft2_ F, (Bt uh/f t2) or perimeter (ft) (Btuh) or perimeter (ft) (8tuh) Heat I Cool j Gross I N/P/S j Heat I Cool i Gross N/P/S j Heat Cool 6 V I I 2A-Obw 0.253 n 7.44 5.57 452 393 2926 2190 452 393 2926 2190 ---G I D-c2ov 0.570 n 16.76 1641 6 0 98 96 6 0 98 96 ---G 1D-c2ov 0.570 n 16.76 16.41 13 0 209 205 13 0 209 205 1D-c2ovd 0.570 in 16.76 16.41 40 0 674 660 40 0 674 660 1 1 2A-0b 0.253 e 7.44 5.57 392 302 2248 1682 392 302 2248 1682 1 D-c2ov 0570 a 1676 4808 20 0 335 962 20 0 335 962 ID-'2ov 0.570 a 16.76 48.08 30 0 496 1422 30 0 496 1422 11 DrO 0.390 a 11.47 12,13 40 40 461 488 40 40 461 488 2A-0b 0.253 s, 7.44 5.57 340 328 2436 1823 340 328 2436 1823 t-G 'I D-c2ov 0.570 s 16.76 19.96 13 0 209 249 13 0 209 249 1 2A-Obw 0.253 w 7,44 5.57 496 403 2995 2241 496 403 2995 2241 1OB-v 0.600 w 17.64 25.00 34 0 591 838 34 0 591 838 1 D-c2ov 0.570 w 16.76 48.08 4 0 67 192 4 0 67 192 1 D-c2ov 0,570 w 1 6.76 48,08 6 0 105 300 6 0 105 300 1D-c2ov 0570 w 1676 4808 20 0 335 962 20 0 335 962 1 D-c2ov 0.570 w 16.76 4808 30 0 496 1422 30 0 496 1422 12A-Osw 0.240 - 7.06 490 544 523 3689 2560 544 523 3689 2560 11 DO 0.390 in 11.47 12.13 21 21 243 257 21 21 243 257 C 16B-30ad 0.032 094 1.75 1611 1611 1516 2815 1611 1611 1516 2815 F 22A-tph 1.358 39.93 0.00 2323 210 8384 0 2323 210 8384 0 1 1 61 c)AED excursion I E391 I 1 '9 Envelope loss/gain 1 285141 214531 1 1 285141 21513 12 a) Infiltration 4076 932 4076 932 b) Room ventilation 0 0 0 0 13 Internal gains: Occupants @ 230 4 920 4 920 Applianceslother 1200 1200 Subtotal(lines 6 to 13) 32590 24505, 32590 24505 Less external load 0 0 0 0 Less transfer 0 0 0 0 Redistribution 0 0 0 0 14 Subtotal 32590 24505 32590 24505 15 Duct loads 15% 28% 4749 6774 15% 28% 4749 6774 Total room load 373391 312791 1 1 373391 312791 Air required(cfm) 1550 1 550 1550 1550 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 4`11- wrightsoft 2013-Feb-21 12�38:45 Right-SuiteO Universal 2012 12.1.05 RSU1 5431 Page 1 C�\U sers\Consu ItAir\Desktop\l 764 Live Oak Lane.rup CaIc=MJ8 FrontDoorfaces. E