Loading...
276 1St St (vault) MAP SHOWING SURVEY OF G ° /i AS RECORDED IN PLAT BOOK /'s- PAGB14 OF PUBLIC RECORDS OF DUVAL CO., FLA. FOR ,4 � r 70 zo v ,RR`r\1l fpcl itj I �► �^Kf '� Q1e xwr� �wMrnN,M Mn ticx� meCtf the n+n�rnur. �•w.a<c�ww+s�>rw��r ���L� ttw G.L.T.A. I HEREBY CERTIFY THAT 1 HAVE SURV[YZD THt LAMM AS SHOWN IN THE ABOVE CAPTION AND THERE ARE NO ENCROACHMENTS. SIGNED 19 RKQI*TW%lW SURVRTOR NO. FLORIDA SCALE: ` �� `" �Q / ORDER NO SOUTNSIDE BLUEPRINT SERVICE. INC. FOR OFFICE USE ONLY Date----------- ...... Permit CITY OF ATLANTIC BEACH Valuation $ Qvv ............. .............. FLORIDA House #_.. -1. .......... ............................................................................ APPLICATION FOR BUILDING PERMIT ........................................................................... Application is hereby made for the -approval of the detailed statement of the plans and specifications herewith submitted for the building or other structure described. This application is made in compliance and conformity with the Building Ordinance of the City of Atlantic Beach, Florida, and all provisions of the Laws of the State of Florida, all ordinances of the City of Atlantic Beach and all rules and regulations of the Building Department of the City of Atlantic Beach, shall be complied with, whether herein specified or not. The Contractor or Owner-Builder who has been issued a Building Permit is automatically responsible to ascertain that all sub- contractors engaged by him are duly licensed in the City of Atlantic Beach,Florida. To prevent delay or embarrasment regard- ing intermediate or final inspections it is suggested that a list of sub-contractors be submitted to this office so that licenses can be verified. ii*4 - ---------- Date ------------------------------------_--_--------- 19-/ Af Address_ 8__"--!)_ Telephone No..,_;2_#,,/�42 J-A��Ij�--------------- 15_�5_�_ ----AAr' d 7--- A Architect-------•---------------------------------------------------------------------------------------Address.------------------------------------------------------------Telephone No.---.------------------------ Contractor Builder _V `G----- ------ _�_Iv/.W'ePhone- Lot No------------ (----------------------------------Block No.-------------------------.-..-.Sub Division,9W_,.P.,v77ct. VV?_#Ce_----------_--------Zone37__; 3 ---------------------------- ------------------Street&1f6Mfi----- Side Between -------------------------and._4? _,,-J_.t-------------Sts. Valuation $1-91110W--------- -For what purpose will building be used--_ .--.--Type of construction-AgM.. Dimensions of Building--- -.--___Dimensions of Lot-.-. ------------ Size of Footings-----fl�-Ai ---- /M 0 JV 0 k,-rA'e- Size of Piers------.. --------------Size of Sills_ .. � -- --. . -.---Greatest Sill Span in ft.___b1_0-- -------T ype Roof. How will Building be Heated? d-&-Z-6,o-------------------------------------Will Building be on Solid or Filled Ground?....r5�9,44-_------------------ ii r Size of Ceiling Joists-- ----------------- Distance on Centers..........21_!$�---------------------- Greatest Span----------- -------------­---------- ri • Ire, Size of Floor Joist.__Q-_10)�/�-,(----- ','Distance on Centers...--._.. .. -------------------- Greatest Span-.-_ //----------------------- // / Size of Rafters--- -------------------------- Distance on Centers....._.....-02--%_--•----------•------ Greatest Span----------_.2,;-- __ --------_------ This rectangle is to represent the lot Locate the building or buildings in the right position. Give distance in feet from all lot-lines and existing buildings. REAR LOT LINE Two copies of plans and specifications shall be submitted with application. Inspections required. 21. 1. When steel is in place and ready to pour footing. 2. When steel is in place and ready to pour columns and/or lintel. Z I Z 3. When steel is in place and ready to pour beam. 4. When framing is completed. 5. When rough plumbing is completed,and ready to cover up. 6. When septic tank drain field or sewer is laid but before it is covered. q S r 7. Electrical inspection by City of Jacksonville. W dIN U2 S. Final inspection. L Note: In case of any rejection,re-inspection MUST be called for after corrections are made. FRONT OF LOT In consideration of permit given for doing the work as described in the above statement, we hereby agree to perform said work in accordance with the attached plans and specifications, which are a part hereof, and in accordance with the building regulations of the City of Atlantic Beach. _Z111 /�_— Signature of Build —------ Address Signature of Owne!_,--1__-,L— Al- CITY OF ATLANTIC BEACH APPLICATION FOR PLUMBING PERMIT r � PERMIT NO. J? -f- Date : .7 LOCATION Street LOT N0 , j 0 BLOCK NO. S/D OWNER _ f S MASTER PLUMBER / �„ 4/114 Bldg. BUILDER OR CONTRACTOR 4td W,!!lI ,fi Pe=!t_No,. TYPE OF BUILDING SINKS 3� LAVATORY BATH TUBS URINALS CLOSETS FLOOR DRAINS_[_SHOWERS _/WATER HEATERS DISHKASHERS DISPOSALS OTHER TOTAL FIXTURES z - @ �i , 00 NO N ORK MUST BE DONE UNTIL A PERMIT HAS BEEN FROCURED PLANS AND SPECIFICATIONS must show a plan and description of the size --.and—location of all the soil and vent pipes, and the number and location of all fixtures, (in accordanne with Ordinance no. 188 of the City of Atlantic Beach, Florida) must be shown on bank of appli- cation and be approved by the Plumbing Inspector. DRAW PLAN AND SPECIFICATION OF ABOVE PLUMBING ON BACK. Approved by Plumbing Inspector Date (FOR OFFICE USE ONLY) ROUGH-IN INSPECTED ARKS_- �,_____, FINAL INSPECTION: CERTIFICATE ISSUED: