Agenda Item 4BAGENDA ITEM # 413 MARCH 11, 2013 CITY OF ATLANTIC BEACH CITY COMMISSION MEETING STAFF REPORT AGENDA ITEM: Interior Repair and Painting of Elevated Storage Tank at Water Plant 1 and Ground Storage Tanks at Water Plants 2 and 3 Bid No. 1213 -03 SUBMITTED BY: Donna Kaluzniak, Utility Directo(Y/ DATE: March 4, 2013 STRATEGIC PLAN LINK: N/A BACKGROUND: As part of the City's maintenance program, the ground and elevated storage tanks at the City's water plants are inspected, rehabilitated and coated on a regular basis. The City advertised for bids for repairs and coating for the interior of the 100,000 gallon elevated tank at Water Plant #1, the 500,000 gallon ground storage tank at Water Plant #2 and the two 150,000 ground storage tanks at Water Plant #3. Seven contractors attended the mandatory pre -bid meeting and four contractors submitted bids: Contractor Southern Road Tank Rehab The Crom Worth & Bridge, LLC Corporation Contracting, Inc. Subtotal, Base $269,000.00 $203,000.00 $179,000.00 $116,780.00 Bid Items 10% $26,900.00 $20,300.00 $17,900.00 $11,678.00 Contingency Total 1 $295,900.00 1 $223,300.00 $196,900.00 1 $128,458.00 After the bid, Worth Contracting, Inc. submitted a letter stating that a substantial and honest mathematical and clerical error was made in their bid submission and requested to withdraw their bid. Therefore, the responsive low bidder was Crom Coatings, A Division of The Crom Corporation in the amount of $196,900.00 including contingency. BUDGET: A total of $105,000 was budgeted for the tank work at the three treatment plants. Due to the size and design of the ground storage tank at Water Plant #2 it experiences less deterioration and recoating of this tank can be deferred until next fiscal year. The total amount for the work at Water Plant Nos. 1 and 3 will be $95,700 including contingency. AGENDA ITEM # 411 MARCH I I, 2013 RECOMMENDATION: Award a contract for Bid No. 1213 -3 for the Interior Repair and Painting of only Elevated Tank at Water Plant #1 and Ground Storage Tanks at Water Plant #3 in the amount of $87,000 plus a 10% contingency of $8,700 to Crom Coatings, A Division of The Crom Corporation and authorize the City Manager to sign the contract. ATTACHMENTS: 1. Bid Analysis 2, Bid Tabulation 3. Letter from Worth Contracting, Inc. requesting bid withdrawal 2 Interior Repair and Painting of Elevated Storage Tank at Water Plant #1 and Ground Storage Tanks at Water Plants 2 and 3 Bid 1213 -03 February 27, 2013 D * ** *DUE TO IN ERROR IN THE WRITTEN BID SUBMITTED, WORTH CONTRACTING HAS WITHDRAWN THEIR BID * * ** Z d �D N O W Southern Road & Bridge, Tank Rehab The Crom Corporation Worth Contracting, Inc. LLC Repair & recoat interior of 100,000 gallon elevated storage $50,000.00 $33,000.00 $37,000.00 $30,960.00 tank at Water Plant #1 (469 11th St Repair & recoat interior of the 500,000 gallon ground storage $128,000.00 $105,000.00 $92,000.00 $51,678.00 tank at Water Plant #2 (2301 Ma ort Rd Repair & recoat interior of two 150,000 gallon ground storage tanks $91,000.00 $65,000.00 $50,000.00 $34,142.00 at Water Plant #3 (902 Assisi Ln) SUBTOTAL (ITEMS 1 - 3) $269,000.00 $203,000.00 $179,000.00 $116,780.00 TEN PERCENT (10 %) $26,900.00 $20,300.00 $17,900.00 $11,678.00 CONTINGENCY OF SUBTOTAL TOTAL BASE BID (ITEMS 1 -3) $295,900.00 $223,300.00 $196,900.00 $128,458.00 PLUS 10% CONTINGENCY D * ** *DUE TO IN ERROR IN THE WRITTEN BID SUBMITTED, WORTH CONTRACTING HAS WITHDRAWN THEIR BID * * ** Z d �D N O W City of Atlantic Beach Interior Repair and Painting of Elevated Storage Tank at Water Plant #1 and Ground Storage Tanks at Water Plants 2 and 3 February 27, 2013 BID 1213 -03 3:00 PM * ** *DUE TO IN ERROR IN THE WRITTEN BID SUBMITTED, WORTH CONTRACTING HAS WITHDRAWN THEIR BID * * ** Award of Bid based on Department Analysis and Commission Approval Y z �d �a x N O W � Southern Road & Bridge Tank Rehab The Crom Corporation Worth Contracting, Inc. LLC Required Documents X X X X Submission in Triplicate -All Documents X X X X Bid Bond - Five Percent (5 %) of Bid X X X X Insurance Certificate X X X X References - Three (3 X X X X License - General Contractor X X X X W -9 Form X X X X Signed Document Requirements Checklist Proof of Experience provided Proof of Experience provided X X Proof of Experience - Ten 10 Years from 2010 and forward from 2007 and forward X X X X Drug Free Workplace X X X X Public Entity Crimes Statement N/A N/A N/A NIA Documentation of Any Addenda: Total Base Bid Plus 10% Contingency, - Lump Sum Bid for All Tanks Specified Within the Bid Specifications (one 100,000 gallon elevated tank, one 500,000 gallon $2,959,000.00 $223,300.00 $196,900.00 $128,458.00 ground storage tank, and two 150,000 gallon ground storage tanks) * ** *DUE TO IN ERROR IN THE WRITTEN BID SUBMITTED, WORTH CONTRACTING HAS WITHDRAWN THEIR BID * * ** Award of Bid based on Department Analysis and Commission Approval Y z �d �a x N O W � CONTRACTING INC.: General Contractor — CG C056635 Certified — DBE, HBE, WBE ,,rr iCoiv4orthcontractinginc.coir 2112 Jernigan Road Jacksonville, FL 32207 -6608 February 28, 2013 Tim Townsend Special Projects Manager City Hall - Public Utilities Dept. 800 Seminole Road Atlantic Beach, FL 32233 ttownserid(!�coab.us Subject: CITY BID NUMBER 1213 -03 CITY OF ATLANTIC BEACH REPAIR AND PAINTING OF STORAGE TANKS Dear Mr. Townsend: AGENDA ITEM # 413 MARCH 11, 2013 Phone: (904) 396 -6363 Fax: (904) 396 -1888 Worth Contracting, Inc., hereby informs you that there has been a honest mathematical error and substantial clerical error that was made in our bid submission on February 27, 2013 in preparation of our bid tabulation for Bid 1213 -03. We are requesting our bid be withdrawn due to the mathematical error made by Mrs. Lawrence. If you have any questions please call me at (904) 396 -6363 Ext 26. Sincerely, fce Katherine Garces Worth President