Loading...
Agenda Item 4CNorth i Florida Transportation Planning argan)zation Transportation Improvement PrograMBe- Fiscal Years 2013/14 - 2017/18 Beaches Draft Supplement 1022 Prudential Drive - Jacksonville, Florida 32207 9 T 904.306.7500 • F 994.396.7501 • www.northfioridatpo.com 5 N L° w: North Florida TPO Transportation Improvement Program - FY 2013/14 - 2017118 Fund Phase Source 2013/14 2014/15 2015/16 2016/17 2017/18 Total ATLANTIC BLVD EB (SR 10) AT SAN PABLO RIVER BRIDGE NO 720044 - 4261761 BRIDGE - PAINTING PE DIH CST DIH CST BRRP Total Prior Cost < 2013114 Responsible Agency: FDOT 1,000 0 17,527 18,037 2,065,609 0 2,084,136 18,037 382,572 Future Cost > 2017118 *Non -SIS* Length: 0.492 mi 0 0 0 1,000 18,564 0 0 54,128 0 0 0 2,065,609 18,564 0 0 2,120,737 0 Total Project Cost 2,503,309 BEACH BLVD (US90) (SR 212) FROM SAN PABLO ROAD TO SOUTH 12TH ST. - 4319621 LANDSCAPING PE DIH PE DDR CST DIH CST DDR 85,125 Total 0 Prior Cost < 2013114 Responsible Agency: FDOT 1,000 0 70,000 0 0 85,125 0 750,000 71,000 835,125 238,711 Future Cost > 2017118 BEACH BLVD (SR 212) FROM ST. JOHNS BLUFF TO SAN PABLO ROAD - 4319551 LANDSCAPING PE DIH CST DIH CST DDR Total Prior Cost < 2013114 Responsible Agency: FDOT 500 0 154,800 0 1,500,000 0 1,655,300 0 206 197 Future Cost > 2017118 *Non -SIS* Length: 2.208 mi 0 0 0 1,000 0 0 0 70,000 0 0 0 85,125 0 0 0 750,000 0 0 0 906,125 0 Total Project Cost 1,144, 836 *Non -SIS* Length: 5.263 mi 0 0 0 500 0 0 0 154,800 0 0 0 1,500,000 0 0 0 1,655,300 0 Total Project Cost 1,861,497 a G� �z �d a o� Final Draft April 18, 2013 A -1 Duval County State Highway Projects (FDOT) 24 North Florida TPO Transportation Improvement Program - FY 2013114 - 2017118 Fund Phase Source 2013/14 2014/15 2015/16 2016/17 2017/18 Total SR A1A FROM 34TH AVE. TO ATLANTIC BLVD /MAYPORT RD - 4300721 *Non -SIS* ITS SURVEILLANCE SYSTEM Length: 5.840 mi Responsible Agency: FDOT CST SU 70,000 0 0 0 0 70,000 Total 70,000 0 0 0 0 70,000 Prior Cost < 2013114 0 Future Cost > 2017118 0 Total Project Cost 70,000 SR A1A FROM MARSH LANDING TO 34TH AVE. - 4300711 *Non -SIS* ITS SURVEILLANCE SYSTEM Length: 0.690 mi Responsible Agency: FDOT CST SU 30,000 0 0 0 0 30,000 Total 30,000 0 0 0 0 30,000 Prior Cost <2013114 0 Future Cost > 2017118 0 Total Project Cost 30,000 SR A1A FROM ATLANTIC BLVD /MAYPORT RD TO TO WONDERWOOD DR - 4300731 *Non -SIS* ITS SURVEILLANCE SYSTEM Length: 3.300 mi Responsible Agency: FDOT CST SU 50,000 0 0 0 0 50,000 Total 50,000 0 0 0 0 50,000 Prior Cost < 2013114 0 Future Cost > 2017118 0 Total Project Cost 50,000 WONDERWOOD (SR116) INTRACOASTAL BR 720677 EB & WB - 4325171 *Non -SIS* BRIDGE REHABILITATION Length: .679 MI Responsible Agency: Managed by FDOT PE DIH 500 0 0 0 0 500 Total 500 0 0 0 0 500 Prior Cost < 2013114 1,001 Future Cost > 2017118 0 Total Project Cost 1,501 Final Draft April 18, 2013 A -2 Duval County State Highway Projects (FDOT) Y �z �d a o� N 0 w � n North Florida TPO Transportation Improvement Program - FY 2013114 - 2017118 Fund Phase Source 2013/14 2014/15 2015/16 2016/17 2017/18 Total WONDERWOOD EXPRESSWAY (SR 116) FROM 1 -295 (SR 9A) TO MAYPORT RD (SR 101) - 4287961 *Non -SIS* DRAINAGE IMPROVEMENTS Length: 5.296 mi Responsible Agency: FDOT PE DIH 500 1,001 500 0 0 2,001 Total 500 1,001 500 0 0 2,001 Prior Cost < 2013114 484,533 Future Cost > 2017118 0 Total Project Cost 486,534 a c� [z zd �y o� Final Draft April 18, 2013 A "3 Duval County State Highway Projects (FDOT) w �k Uk :aj: a 4 IL Abbreviations &Acronyms �z �d v N � O W wit Al -1 ABBREVIATIONS AND FUNDING SOURCES Al -2 a c� �z �d a N O W � AGENCIES FAA Federal Aviation Administration FHWA Federal Highway Administration FTA Federal Transit Administration JAA Jacksonville Aviation Authority JTA Jacksonville Transportation Authority SA/STJAA St. Augustine /St. Johns County Airport Authority Al -2 a c� �z �d a N O W � PROJECT PHASES PLN Planning PD &E Project, Development & Environment Study PE Preliminary Engineering ROW Right -of -Way Acquisition CST Construction DSB Design Build MSC Miscellaneous Al -2 a c� �z �d a N O W � RRU Railroad /Utilities INC Contract Incentives ENV Environmental Al -3 a oy N y O .1. W � FUNDING SOURCES ACBR Advance Construction (BRT) — Federal Bridge Replacement ACEN Advance Construction Equity Bonus National Highway ACFO Advance Construction for High Priority ACIM Advanced Construction Interstate ACNP Advance Construction (NHPP) ACSA Advanced Construction Transportation Management Areas ACSB Advance Construction for SABR STP Bridges ACSE Advanced Construction Enhancement ACSH Advanced Construction Hazard Elimination ACSL Advance Construction (SL) ACSS Advanced Construction Safety BJP Better Jacksonville Plan BNBR State Bonds (Statewide Bridges) BNDS Bond funding State Al -3 a oy N y O .1. W � BNIR Interstate R/W and Bridge Bonds BRAC Bridge Replacement BRRP State Bridge Repair and Rehabilitation BZAC Federal Bridge Replacement - Off System CIGP County Incentive Grant Program CM Congestion Mitigation DDR District Dedicated Revenue (Gas Tax effective January 1, 1991) DDRF District Dedicated Matching Revenue Funds DI Statewide Inter /Intrastate Highways DIH State In -House Product Support DITS District Intelligent Transportation Systems DPTO District Public Transportation Office DS State Primary Highways and PTO EB Equity Bonus EBNH Equity Bonus - National Highway FAA Federal Aviation Administration FTA Federal Transit Administration GMR General Revenue for Strategic Intermodal System Al -4 a n �z �d o� N �y ,C, y W � GRSC Growth Management of SCOP HPP High Priority Projects HRRR High Risk Rural Road HSP Highway Safety Program IMAC Interstate Maintenance JAA Jacksonville Airport Authority LF Local Funds LFR Local Funds /Reimbursable LFRF Local Funds /Reimbursable - Future LOGT Local Option Gas Tax MG Minimum Guarantee NHAC National Highway System NHBR National Highway Bridges NHPP IM, Bridge Repl, Natnl Hwy -MAP 21 NHRE Nat. Hwy. Perform - Resurfacing PKBD Turnpike Master Bond Fund PKYI Turnpike Improvement PLHD Public Lands Highway Discretionary RHP Rail- Highway Safety Crossings — Prot. Dev. Al -5 SA Transportation Management Areas SE Transportation Enhancement Activities related to any Surface Transportation Program SH Hazard Elimination SIBG SIB funds — Growth Management S1B1 State Infrastructure Bank SR Surface Transportation Program (STP) Railroad Hazard Elimination SS Any safety improvement eligible under the Section 130 Railway- Highway Crossings Program and the Section 152 Hazard Elimination Program (allocated by statutory formula) STP Surface Transportation Program SU, XU Surface Transportation Program (STP) in urban areas with a population of over 200,000 TALT Transportation Alts —Any Area TALU Transportation Alts >200K TDTF Transportation Disadvantaged Trust Fund (80% Federal /20% State) TMA Transportation Management Areas - Areas with a population of over 200,000 TRIP Transportation Regional Incentive Program XA Surface Transportation Program (STP) in any urban areas. XU, SU Surface Transportation Program (STP) in urban areas > 200k a c� Z �d a o� Al -6 0 w�