Loading...
360 5th St 2013 N SFR -10 LL 0) LO 22'-3'9 22'-8" 0 wa --------M. 10, 50' W Q'4 F_ 0) m 0) _0 Lo izo 0) x x A 0 x W X GARAGE 73 x 00 x r x x 20' F E X z 0 C14 W —00 X 00 x X EQUI :1. A X 11 LAUR m 2 N 1+ z 0't LOT COVERAGE: 0 El U) MAIN HOU5E (porche5 included)-2222 GARAGE 53G az Q) PFRVIOU5 DRIVE— 1034 / 2 517 0 25' 1 49 El POOL COPING (bowl not inclucled) 0 0) PEP\VIOU5 5TEPPING 5TONE5 34/ 2 = 17 12 POOL A/C * POOL EQUIP. PAD5 53 0 0 IMPERVIOU5 R11513ON5 3 G 2 INDEX TO DRAWINGS TOTAL COVERAGE 375G 7500 JTECTURAL ' LOT ARCH 30" ' IWIN M/ G14 IA WO I PERCENT COVERED 50% it i TtTHIII I b- A-ONE COVER 5HEFT 51TE V) A-TWO f 1 R5T f LOOP, PLAN5 10 U C COVERED PORCH W LEGAL: A-THREE 51ff-COND f:LOOR PLAN LOT 27, E3LOCK G, FLAT 0 1-101 A-FOUR KOOf PLAN5 N C 7,:,, - 0 NO. I , 51U[3DIVI5I01N "A", z I.- 0 z A-0-IVE f! FVATION5 ATLANTIC 5EACH , AS 0 F RECORDED IN PLAT E300K 59 A-SIX ELffVATION5 PAGE G9 Of THE CURRENT 25TbAfHou!�ff— FUE3LIC RECORDS OF A-S EVE N Fr)UNDATION PLAN5 TY, f LOKI DA. Kw reference only - 5CC 5tructural) DUVAL COUN PROf I LE Of ii ii I I HOU5E I ---- A^94p T f IR5T f LOOP, ELECTRIC PLAN5 NEXT DOOR�,� (0 A-NINE 5ECOND I'LOOK ELECTRIC W 1-i E 1� 11 11 I i FROVt­Df_ INLET PROTECTION I f ANY 1`0 R ALL I N LET5 A-TEN WALL 5ECTION 0 (for reference, only - 5CC 5tructural) F 0 F_ W Q i 0 z I It I 490 0 L IL 0 L-------- N OT Iff 5 : ATTAC H M E NTS 1.)ELECTRICAL WIRING PER NEC 2008 2.)ALL 5RANCH CIRCUIT5 THAT 5UPPLY I 25-VOLT, fRONT PORCH 51NGLE PHA5E, 15-AND 20-AMPERE OUTLET5 IN5TALLED IN 13fDPOOM5 5HALL 13E PROTECTED ITEM I fOp1m GOOC-0 I 24" CONIC. BY AN ARC-fAULT CIRCUIT-INTf RRUPTEIR L15TED DRIVE TO PROVIDE PROTECTION Of THE ENTIRE CIRCUIT. f LORIDA ENERGY Iff f ICIENCY CODE II/A 3.)UNL15ED ITEM 2 5EALED 5URVEY —i I I ITEM 3 fLOORTRIJ55 ENGINEERING 3.- 34 —10" 5#-1" ITEM 4 5TRUCTURA- ENGINEERING —— — ———— NOTES: W 0 20' fRONT YAI�,p 14 TWIN MAP _E 1 ) OCCUPANCY CLA55 15 GROUP R-3 110 2) CON5TRUCTION TYPE 15 TYPE 513 W 6" CREPE MYqTLE C14 b 12" FPALM 3) APPLICABLE CODE5: I %'W 2010 fLORIDA BUILDING CODE, RE51DENTIAL 0 vt- 0 12" PALM 2008 NATIONAL ELECTRIC CODE 2010 f LORI DA f I RE PREVENTION CODE lb (0 50' CURKENT ATLANTIC 15EACH LAND DEVELOPMENT CODE 3p 18' 01 Degg cable v0 land POWER 51DE WALK "so" awroavAte toes LO vel" Snd Ot"' t CO""'ute 0 0 + -MIS "b %slon Oul d6es noomplignce su dlv uvatior's, j peS11 F LE ,on'ling, ce( is ment reg I all o�lhii; N &ements aprox. location deve%09 I lot Vhe issuan de 04 Ijng re ot gJantic appro48 tida sading Go % PerMNt%e of a 'ett Flo te end rred�18, ure 01 issuance % mat ttle local,Sta,eifed bY S 9'1'J)fjor to 01f W 0 must MOM 0 0 a iesev:,'t"s 5th 5TREET 40 N*ff OF WAY PAVW ,,,mved Date* W m 1 T E P L A N D z 0 I I z iL 0 -j(D 0) MO) 0) jzo z 0 L9 U) ui 0 Z D 0 0 Z x 0 Oo z cm C3 )�0) (nmmujo ls6 L $is 09 "g—,Oz 9$'V 1 9 fig 4 L -J _j § :2 0 < fc-) "0 L—,-v L—,-V "o L—,z L z 0 Ln Of 4 LLJ < iR 0 IN o'0 Ey'a Li I R I I T-0 z > a C) CL 0 IN 0) 24i .t"C C4 1.0/- 111 Are '*e cot x Cq 4004 ioda/I ws L L.J ;IJOIG z CZ LLJ 0. U a . . I I - - ... - - - ... 1 . 1 � I [ .. - . 27 > got lot D 0 00 C%4 0 uj n I (L > (n z V- ::> --1 F w 0 ) co O� J LL 13 1 4004 jpda/I T- I o) 09 ;]JOIG X LU w >1 -J L 9xz Z 0 0 M) 19 Q uj LL- >< �- R/ N 0 cli 7 F M 'z 0 lu LLJ 0 z co LLJ >- R Q) I (S) LO 0 �n 0 U— L LLJ P, P0 C14 00 LH r LU CD C\j OD LLJ I a_ I 0 C14 qxz 0 C%4 x T) 9xz >k 0 w L > > 0 /10 C> N > >1 0 Y4�11�410. () u C) t� 0 z R L— — 0 Cf) U-j U-1 iu 0 z U-i w > C\j W co V1 1 x 20- co =x 0 z Q� 04 0 tu uj N IL 0 r tL- U (Y) CNN x 0 x x 0 > 0) -CU_or 0 LO -j F— — r- I C) lit m u 3 0 LU L I C) x PO P91P .9 x I(liffi 19 1 (D z x C) LLJ LU uj z CC) LE x < w Q C\l 0 0) LU h (n 0 AjlJVA ,,gt, < ..Z�e +1+ X IZZ X ..Ve a/- X al U-i 0 CV/ W W lu U-1 7 9�—'z 0 9A09V —469 lz -a -C� C: ILJ 'z ino mng z z z lu 2 ui -z-, LZ "q-'qz Q > U-j r- EL 00 r- 0 IN 49OJqG 04 U01109JIP 0 C\j (5) Lr) C\l m C) 0 LLJ CO C\j (Y) u (n w cf) — Lr) j 9 < L < 0 LU Oq U014�OJIP LL. C) !;� Uj LLLLjj C) o U-j !;� = D- 2 0 M LrL J: I v C) 0 m 0 LLJ cz < US 0 1 w 0 < D 0 LLJ a CS z LU C) 0 LLJ (S) Q CL 0 z < �- CL < () z U z LLJ JLJ 0 EL 0 tu- CL LLJ / g < D- IL T) LL- (f) CD D 0 z vbt U-j j � \L 04 5wime-v rat5iui�\ri-oi-rx 49g r+vl6 Lr+��Z Vl\tZNOU1,W�\L'ul4ejd\:) 'loz1z10qmF--ueljjoolA LL i I I 0 lz w ,L9 �ff 0 cm-0 00 cm .9 Z9 t 0) 'g 049-4oz '2 CM. -_ �4 1 oft-49 z 0 ------------ ---------------C. C. .0 No 449 Q IN 0) GG]N!D;l 419 "1 -ve 1*9 tic -ve 1*9 x I.-Ve A A S :i o' LO 0 < Ir— 4001 ip" .g/I LU C\j �r- Ln SD ------C=:,- I . . - . . N . I . ..;IJQIG , !z - ' ' " " ** ... .- - It, - - < x . 0 Q) 0 ca < 0 M �'j :�i w 0 z C) NZ 0 LU 0 �D CN J u R/ I u X < LL 0 - L� I I LLJ LU C) 0 90 0 � a/ LO N U) LU LU uj Lu (n W >1 LU (L 0- CD 0 0 M LU /> n 10 W 0 LU C) 0 uj U a loe 0 IV 0- LU u N EL U UJ % ILMM-- 0 Em co -c) > UJ u 0 CD Lu N IN sz t r1l co QD 0 0 z Ln IL ol I < C) LO < co w 0 'U-) z I C\j lz 0 X 0 C 9xz 'cs 2 00 U .C*-------C. 0 C\l 0-- 'z 0 X 00 OD < >< (0 0 < 0 w If 0 v CO 0 z R NZ Q0 it ry pu 0 fu C) > uj A ii !'� x a. C) CD !DNI1190 lV'dCl9PiVD 0 Uj LO >1 x (L Ln U- r 04' (T) CY) U- 0 u CD 0 , — — — — -'�: I a/ %IJ 0 lu - Of) ONIII90 lV-NC1;3PjV3 a/ 0 Y CD 20 It [1/. 0 v (L (0 X U-i I — :D u C) X C14 00 LU Q 0 00 ]D Q) (L x 0 loo 10 FLU T-L. ........._r— .............. C) 0 in .37E x utle I'VE X..tla GGINO;l L llv9x. e 6 1P -nlG)JN9A z W W 'z lavx*e 0 > 119 -4— "-Z 7,1T 'ZL L-,9 t ,Z-,6Z ,9—,9z 00 7 0 w m m z z 0 IL UQIP�aAF'9V1'(5gLPUl 00'9000+Z)d H2w'wjol:6�:zl QOZ/17/9"qmFzuelcpxlA-bulML'-V P94'-'U'Ar-1-01-r-C`19ig W16 L%tZ lol\'v4ZNO�WJ\buIVu'jd\:3 LL 1 (0 0) izo ly N 0 —00 0) z 0 1 N r- 0 h v) w ff w 0 poiW IL Z i� I IG (n U) u 0 lu C\j z n o cn A�NO > b-I LU Ln LU < I-- C6 __j > LLJ NOliO;JG GlPi LU CV (luD ui a-/ it I C) un LL- IN 0 _j 0 N (n 0 Z C\j (S) L -J > Fu LU < L > Lu Li U-i LLJ 0 00 (S) LL. CL 64 w 0 Ll u 0 z =3 AINO 7 C\j NOUOIG co CIL GIPI El 00 -I N F 7 L -J F-- It AINO 319VO un oo r) SIHI (S) 0 > )a-/ L u of Lu L > Lu 0 U LLJ [Ito (f) LL 0 0 iL LL (D w 12 12 —0 9 91 j izo w 0 12 3.5 6 N 0 9 —00 (L 0) 00 0 Z 0 0 z 0 CO z 00 C) 17-0 0 cef o cqm w 0 FF I (E J C14 LL MARDI E30ARD U) 'co 51DING - 5TYLE PER OWNER 0 0 LO w 5WING DOOR Z 01 F rIKIT Pnl,-,., W If 5 T L If V A T 1 0 fRONT PORCH f=l RE PLACE 5UMMEK KITCHEN K I G H T 1 D If If L If V A T 1 0 N (WC5t) BEYOND "I)ECORATIVE 9 12 51DING IN GABLE5 - w 5TYLE PER OWNER 0 w 0 z 0 0 12 91 0) BUMP OUT z 13EYOND 0 00 CL w I cc) LL- �l w z WINDOW 6 *1 N 5EAT w U) Z CL if oo oo OD T 0 HARDI 50ARD 51DING - 5TYLE 0 PER OWNER 0 0 00 0 W < 0 w NOP, Th ELEVATION Ln f P, 0 N T ELEVATION (north) z A 0 IL LL 0) 1(0 0 12 9 0) —0 j izo w 0 7s (to NO, ------ 13 -00 0) ILL11 2 0 Is z 0 0 00 r-O Q- ILI 2 1 0 NM 2.512 rl u w wo Ell EEI I Ell PL 0) w Ll M C4 0 Emma 18,W X(5' M GARAGE DOOR- Z- 5TYLE PEP,OWNER 5UMMER KITCHEN IN BACK PORCH 51DE PORCH 0 \ HARDI 50APID E A 5 T E LEV AT I ON L If f T 5 1 D E ELEVATION (ea5t) 51DING - 5TYLE PEP, OWNER, 12 w 19 0 PROf ILE Of LOWER PITCHED P,00f w < 15EYOND -5EE -3 It 0 z ROOF PLAN It 0 IL 0 12 3.5 .A u Ll U. z D 0 00 m LL— L 0 0 BUMPOUT W LLJ IN MA5TER 13ATH =Fr-- HARDIBOARD 00 51DING - 5TYLE ----- - w FER, OWNER. z W 0 z10, LL- 0 Or PROIFILE Of '00 0 w 5TAIK IN51DE 0 1 0 1 11 -i < FOR REf EIRENCE 0 loe ONLY M 0 Ir le 13UMI IN MA BACK PO PCt, to z 50UTH ELEVATI ON REAP, E LEVATI ON (5outh) z IL 0 i(D LL 0 0) _0 0) jzO z w 0 V) F_0 c) Z ff Z -00 0 x L9 0. 0) 0 . V.) V) a. R'S 0 L-V d'- m _j M, 0 0 . 3r. Z 0 dos a L .6 sL doe 69 0 U_ ui z uj z 0 c)Z)Laf, < L ---C. 0 L.Li -J :!s LLj LLI CL �4 0 UJ Ld LLJ X W I z >0 0 a- Lj<0 Cr_ L4 in Er V) z LLI 0 uj 7 F ch LL -nis 02 1 1 1 a< 1 1 L I Z IL) 1. a- z :)�Z* m co C3 2 LO 0 On 0 V) Z3 -i L) in Z U) 00 IZZ 02 z 0 Q LVL)l 0 z ui _J Z:� a_ ui 0 00 M:� 00 w (0 1A L'i z 4004 Ioj :g/I V)C-) Z(n — m ::;z Poo 9 al ww 3dOlS 0 w OZ V)0 m sy 0 in N 0 UOW5: L—L cq F I Z Z ""Poo LLI 0 O—Oz 0 V)C) WOO :;Fc I I �xz 0 C, z 0 z w 0 4004 JPJ ::g/I 1. I I I 03 0- I z in 00 q- 00 m w ui LO LO EL N z F --1-7 00 w L __j w z a 2 z 0 OUJI < 0 X: 0 �_ 0 0 —i Z 00 w 0 F-LL- F-1 I ZOO V)of 0 z 0 V) Cl LLI z 0 020 < w z a- z nr--- 0 z FAZ Z LLI L _J__ a. z I cli 0 IL z 0 to D w Z3 0 LLJ 00 UO_ n_ III I I - I I w UL--t > LLJ LO i I I Cl �j m ui a V) i-Tis -93.— CM Q L -12- rtW W co 0 ,Z—,LZ ,9—,9z of z 0— (Irl 0 w 0 Lr3 Ww X!02 00 , LL. E!p'i w 0 Lm" m in ir En ION a cn CL 9 w W91 m �aw D 1=4 a Lp L z P M R 0 Z 0 z OR a.g <11 LOL. 0 IL l\lZNO�M\ 11Pl \:l '0 LL �E z (.D 0 D 0 ir 0� Ad L.Li mo) �E Ld 0 F- S, 0) V) -j z 0 �E C) F- D Ld LL- M 0 > Ld 0 a_ Ui 3) F F-LLJ —0 :3 LLI LO < C) 0 5z (L old =)8 Ir w j�-,t �E :5 uj 0 04 0 z Fy m a 0 0 LL. Z) U) — wwo� 0 3., 0 0 Zi F- U) D w t; Z 0 Z z z z V) w 0-a_F- izo W 0 0 9 LLI t z 0 j uj 0 m U<- U<- cc 0 0 0 0 L<L z :D LLJ ir Z)Z z 0 LL- LU LLJ x 00 -J LLJ LLJ X UJ O� Z) LL.M D w L<L- L� M F- Z C) -j a- o a-a-m, LLJ 0 -1 LA a- t� 0 t� _-:j QD 0 w m w z w X LLJ LLJ z 0 z �7< (L� MW 0 LLJ 0 - LLJ Of JZF > W 0 a 0 x LLJ 04 P- < 0 0 > z L.Li x z z < LLJ < x CD LLJ 0 u) I -< - U) w D 0 w x 0 M LLJ -i z -14 < g 6 0 M 9 0 ZI 0 :r a m < x LLJ 0 F- ir LU zi c -1 04 x < m m F-Oz:Tu- CL 04 W x K) — UM, U- I? < x z: x z x R uj z LAJ <04(4r)FL 0 Z u 0 LL. C) w a- w D w z 04 Z I LLJ Ed 7M U' M:a Z) 4) WP F- (f) z 0 ZML) UJ <0 2�0 -(+D, a. F- 0 0 9) VYC09-oleibocl- F- F7- @ -te (D x a- 0 0 HOZ @ rL9Lj -C FL9LJ Ld CD 5 x� o @ C) -L.Li 0 m Z 0 10_j .2 -J*z FE x UJ=)0 -00 < -M<Of LL Uj LL:a- 0 mu)z 1 4- 0) <- ui < L)M: L)0 0 za-ox5; C LAJ U < LLJ< a Fr x -1 0 U F- M!� Z X F- 0 0 <a- 0 LLJ -j z z 0 �i p < 0 ui <T)9 V-0 z 04 n 0 c 3 '4 o CC14 U') C-4 :7 0 OR '04 C14 F-: Q� :z UJ uj uj UJ uj W in Z:D le LLJ y 0 LLI 0 0 E=> uj LL- F- 0 1 0�z m 0 0 C LLi:e M -j 0 5 z 0 0 L> m -j< -J-13:: IL F- I :;Z w w N m 0 L=LLJ 1 0 03:am 3:m 75 CL X N D 0 0 z x 10)0 LU6 ax-i a.LL.MW 0 '<--o .. ................................ w N 3@ o U) J LL x WP z� lK F- Q F =) z =) E� - < i 0 0 a- w w < cr- 0 om V) 0 wo Fr- z 0 UJ Z w X�- F- X C) X -Joz LLJ LLI z x LLJ w :D Ljj L) ui L<L- LLJ w D Ld LL- x x 0 < Liu I (.D Q:f 1 9 r - o 0 0 < D > > F- 0 Z I RR 0 of 0 (if wo ofo -j 0 $$ a-U- a_ U- Liu - -Q- L- - - - 9xz . ................. L rhd- - - - - —-I lz z w Er w a- x x -tj 10 0 < 0 F. V) 0 < a. F- w T- o-j uj oje*q 1 02 0 z UJ a- WP _j It 0 �j 6 --- J V)(A SX'Z sxz dt- $1 41 1 lxz in Cr Lv) I - rj t) UZ er% LL Q)�j CL 3@ E3 R a- D to x =�*z ------ k LLI CN4 (W) Ll L<L- j 3@ dM =�*z ui w 0 L<l- lcxr3@ ------ w w a x Of 3::3@ 0) +09 wp L WP @E:E 00 L — — — — — — — — — — — — \ 0 cl J 0 (0 LO w < 0 I m co z 0 0 iL 0 LL o) 0 j(A izo >-J 0 La Ad LLI F- F- z L&J z X =)Z (A -j CD Z) 0 wa-b w LL- 0� -J UJ W r,,LLJ LD zi Lu 3 uj 0 a. x I-- Ld Ir 00 a-a-m ry L) 0 < 0 0 5Z CL LU m 0 a.m M La 0 �E zi L x 0 M: V) F- x INI D U) 04 D<-j F-:1 0 D LLI CR) 0 U. Z z z z M 5 �E cn (n -Jz�- (1) 0 Z V) 0 0 LLJ z 0 z :D ui <— m Ld U) UJ UJ -i LLJ 0 �E 0 0 L<L L<L- L<l- 0 W x LL 17. C) z 0 ui -i LJ z -i 3i: in D LL-M in (D U<- LL. M F- 0 CL z < (n 0 F- O� (n 0 D m z 8 < ui 0 D z CL V) �i — Q 0 F- cl LLJ LLI 73 (D U) 00 F- w z F- w (n 2 C-4 (D LLI LLJ w Z) 0 -CI4 LLI Ix z 0 z Z U) x x C.D 0 Ld z z 0 m 0 0 z w y 0 -1 W < x z < LLJ LLJ M<0-6 v 0 LLJ -i D x D 0 m < a X: X W a ia. C) Ld C) Z) 0 M 0 < x Ld F- ui -i F- 0 C) =) 0 0 0 w X < x z x m LLJ z C) CL -J 04 z W _j 0 -j x 1-5 LLJ D w C) F- w 0 5 1 x LLJ 0) Z (_)LO a F- j a- N U- LLJ C) 04 LA- z F- LLI ui 13- '<I- a) LLJ V) ir n tri X 0-LA- LL- LL- U) x - X-LLJ Z) V(P -m<cr W-.� rx,-� W-,6,3, ral (L) U v LLI Lj�Q- 0 @ moz I Lt- <— w z 0 1: (-)in (1) -J*Z @ N71 Zo-ow c 1 09 1 LLJ w<5; 0 U<- W�LAJ-j 0 0 F- M_j zx L) <(L NO) 0 w <mz Fo 171 0 Lo L) Lo to ll� iujc� M uj C14"D :teiy=) j C L'i Z,� 0 d t-m 0=1 z 0 o �2.r_ a-LLJ W 04 -1<3:M: I<LLJ LL-X w L w — LA- LL -0- 1 U) 0 z co w U- U<- A z w 0 L<L- o x x Jz U- 3@ 0 w on db w 0............... @ F z 0 IL 0 ct x El -j 5 y l-, El w w V)5c of z F -1 3: 17 0 00 0 N 0 T- 0 0 wellll�wIF'9V 1'('-OLPul 00'9,�I(CO+Z)d HW'WJ I ory ral5lul�\c'i-ol-r'o�qg W16 Lf�6 tz lol\,tZNOL��j\bUlq4e-JLI\:) Q) 4S Shingle fasteners shall be 12 gage with 3/8 —inch diameter head , of a length to penetrate through the roofing materials and a minimum of :z Q� 3/4 inch into the roof sheathing . Where the roof sheathing is less than 3/4 the fastener shall penetrate the sheathing . TEST PENETRATION IN A SMALL ROOF SEE ELEVATIONS 12 AR�A tO VERIFY COMPLIAN Q* E PRIOR PROCEEDING WITH REST OF INSTALLATION. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2X1 2 RAFTER . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . AS SqOWN OR . . . . . . . . . . . . PER �NGINEER EAVE DETAIL AND Ld RAFTER CUT TO BE DETERMINED BY + +.+ Cn OWNER AT A LATER TIME VERIFY PRIOR C/ Ld TO FRAMING ry PLYWOOD FLOORING 12 ------------ 9 4 2X1 0 RAFTER ++. 2 ' AS SHOWN OR SIDING ON ------------------ 4 PER ENGINEER TYVEC 0 N + ATTIC FLOORING OPTIONAL PLYWOOD + 2X6 OUTRIGGERS Z FOR EXPOSED S H EATH RAFTERS OR PER OWNER .-,, TYP. 24 DEEP + + 2x12 CEILING ++. OPEN WEB +++ + +++ JOIST OR FLOOR TRUSS +++ PER ENGINEER 2X6 STUD WALLS Cn SYSTEM 2X6 STUD WALLS SEE FLOOR PLANS + ++: 0 Ld + + LLI +.+ + + + X + +: SIDING ON +*+ + + + + Ld + TYVEC ON +'+ +.+ PL�WOOD +++ .++ SHEATH +'+ Cn + +.+ + + DETACHED + + +'+ GARAGE DIST. FROM TOP + ++. OF FOUND WALL TO SLAB VARIES CONCRETE S B WITH SLOPE OF SLAB TO GARAGE DOOR .7 A CONC. SLAB STEEL DOWEL STEM WALL FOUNDATION STEM WALL F4 FOUNDATION DETACHED GARAGE WALL SECTION NO SCALE F=- E:3 FZ E3 I E-= IIE-- FZ I E3 L-J EEB E-- 9--3 E:3 -1117 F=- E:3 FZ C: 9--3 EEB -I- FZ LJ EM -1117 1 E3 DRAWING NUMBER %^.f I11-- IES F=- C: -r 1 C3 " EEB .404, EEB 1 " EM L-- 1-=: F-jOL-I" I L-'%r FZ 1-= EEB 1 1:30 E-E- C: I-- SCAL-E: 3/4" OR 3/8" REVISED: PROJECT ADDRESS: LOT 27, 5TH STREET DRAWN BY: _j 1 1 1 1 1 2120 MAYRORT RD. ATLANTIC BEACH, FL A DATE: 05Z 1 6/201 3 REVISED: ATLANTIC BEACH, FLORIPA 904- 24-9 0072 90-4- 994- 6596 OF 1 0 FZ C: 1 -7- 1-- 1= -1117 LJ FQF- 404, L-- CONTRACTOR KE L- I -T- F-=- E:3 M F-=' 16a I 1111-=6 GENERAL NOTES: DESIGN SPECIFICATIONS: 8. All concrete slabs on grade shall be the thickness as indicated on the drawings over 81 1. The scope of these plans is limited to the structural requirements of this project. Project has been designed in accordance with the 2010 Florida Building Code, yethylene(visqueen)vapor barrier. Slabs shall be reinforced with e, Existing Building(as applicable). Architectural,civil(site),electrical, mechanical(plumbing and HVAC),waterproofing, minimum 6 mil. pol Residential,and the Florida Building Cod and flashing requirements are not addressed in these plans. 6x6 W1.4x1A WWF lapped 8"at edges and ends in conformance with ASTM-A 185, g or fibermesh reinforcement shall be used with minimum 2"fiber length at 1 LB/CY DESIGN CRITERIA: Engineer of Record(Engineer)that this work be performed in complying with ASTM C1 116(u.o.n.). 9 2� It is the intent of the conformance with all requirements of the authorities having jurisdiction over this type -6nd Design Method ASCE 7-10 tural fill which shall be clean sand free of debris and of construction and occupancy. 9. Slabs on grade shall bear on struc E Basic Wind Speed: 130 mph other deleterious material.Structural fill shall be compacted to a density of at least Building Risk Category: 11 3. The contractor is responsible for the means and methods of construction. It is the 95%of the Modified Proctor Maximum Dry Density(ASTM D1 557). Fill shall be treated LL Wind Exposure: B(Enclosed Structure) tractor's sole responsibility to determine the procedure,sequence,and temporary with termite poison before slab is placed. 0 con Building Classification: Residential bracing as to insure the safety of the building and its component parts during Building Type: Type V Construction Structural fill shall be 10. Footings may bear upon undisturbed soil or upon structural fill. UJ UJ Wind-Borne Debris: NOT located in the wind-borne debris region construction. LU compacted to a density of at least 95%of the Modified Proctor Maximum Dry Density 8 U) -0")below the bottom of the footing. z UJ 4. The contractor shall verify all conditions and dimensions at the job site prior to (ASTM D1 557)for a depth of at least two feet(2' . 2 U) Unless otherwise noted, project site considerations shall be the responsibility of the _J1 0 owner and/or contractor. Examples of such items include,but shall not be limited to, commencing work. <,i X determination of grade elevations,drainage features,and special requirements 11. The following minimum concrete cover shall be provided for reinforcement: '1419111 1 W 5. The contractor shall supply, locate,and build into the work all inserts, anchors,angles, 3" Concrete cast against and permanently exposed to earth ul associated with FEMA flood hazard and/or DEP zones. slab depressions,or other components as may be 2" Concrete exposed to earth or weather "o, plates,openings,sleeves, hangers, required to attach and accommodate other work. 1 1/2"Concrete not exposed to earth or weather DESIGN DEAD LOADS: g fith the If9IQL_ cal 12. All continuous reinforcing steel in concrete shall be lap-spliced w Floors: 6, All details and sections shown on the structural drawings are intended to be typi any similar situation elsewhere in the work except minimum lengths: The design floor dead load of 12 psf assumes a floor system utilizing wood decking or and shall be construed to apply to co :Z, d 1-joist,or solid sawn lumber framing- The floor where indicated otherwise. #4 bars- 21"minimum LO - 1 & 61 wood subflooring over wood truss,woo #5 bars' 26"minimum U) covering is assumed to be carpet,vinyl,wood or ceramic tile. The Engineer shall be notified if the floor coverings differ from the noted assumptions 7. Refer to the structural drawings for all structural details and sections. The contractor #6 bars. 32"minimum shall contact the Engineer for clarification in cases of conflict between the structural drawings and any drawings prepared by others prior to commencing work. 13. Reinforcement in footings shall be bent around comers or comer bars shall e M Roofs: Ize cessary to su o > Metal or Shingle: 10 psf(Rafters)7 psf(Wood Truss) 8. It is the owner's and/or contractor's responsibility to obtain a soils exploration report. 14. The contractor shall provide spacers,chairs, bolsters,etc., ne p I � Concrete or Clay Tile: 15 psf The design of the project structure assumes an allowable soil bearing capacity of reinforcing steel. Support items which bear on exposed concrete surfaces shal e 20 Refer to Architectural Plans for Roof Covering System Z 0 2000 psf. The Engineer shall be notified if soil conditions encountered differ from the ends which are plastic tipped or stainless steel g" S p rt noted assumptions. All requirements for site preparation and soil compaction COFY < DESIGN LIVE LOADS: MASONRY: specified in the soils report shall be followed unless more stringent requirements are Z 0 W r ified in these plans- Z Floors: speci General: FILE 9 D s: 40 psf Exterior Balconie CONCRETE: Exterior Decks: 40 psf 1. All masonry work shall be in accordance with -dmeteg"e uirdments for f Stairs: 40 psf(or 300 lb point load) 1. All concrete work shall be in accordance with"Building Code Requirements for Masonry Structures,"ACI 530-08,and Specifications for Masonry Structures,"ACI I Garages: 60 psf(or 2000 lb point load) Structural Concrete,"ACI 318-08,and"Specification for Structural Concrete,"ACI 301 530.1-08 0 All Other Areas: 40 psf co 2. All concrete shall have the following minimum compressive strength at 28 days: 2. Grout shall conform to ASTM C476 with minimum 28 day compressive strength of Attics: 11 Slabs on grade,footings,and misc.concrete: fc=2500psi 2000 psi per ASTM C1019. Grout shall be mixed to provide a s IP Without Storage: 10 psf Structural slabs,walls, beams and columns: fc=3000psi With Limited Storage: 20 psf Designated radon zones only-all concrete: fc=3000psi 3. Mortar shall conform to ASTM C270 and be Type M or S. Typ tirtar may b e With Storage: 30 psf(fixed stair access) in brick veneer. It 2 "_ .5 1 C� 3. Cement shall conform to"Specification for Portland Cement"(ASTM C1 50) J! W -, 6 g tallati 0 Roofs: 4. The contractor shall be responsible for the design and ins 9 0 Less than 4:12 slope: 20 psf 4. Aggregate shall conform to"Specification for Concrete Aggregates"(ASTM C33) 4ZE Z 4:12 slope or greater: 16 psf Concrete Masonry(CMU): 0 2 5- Water shall be clean and free of injurious amounts of oil, acids,alkalis,salts,organic DEFLECTION CRITERIA: material or other substances that are deleterious to concrete or steel reinforcement. 1 Concrete masonry units(CMU)shall be ASTM C90-0613, Holl r Concrete Masonry Units,normal weight,with a minimum com h of SCALE: Walls: IX I Y4-=V-0-(I.I.O.N.) hall be ASTM A615 Grade 40 unless otherwise noted on the 1900 psi(f m=1500 psi). I DO NOT SCALE Brittle Finish(wind load): U240 6. Reinforcing steel s 0 A THIS DRAWING structural drawings.All reinforcing details shall conform to"Details and Detailing of 4. RELEASE DATE: Flexible Finish (wind load): U120 2. All continuous reinforcing steel in masonry shall be lap-splice Ot T in Concrete Reinforcement,"ACI 315, unless detailed otherwise on the structural �i 06-04-13 Floors: minimum lengths: 2 REVISIONS: drawings. ;T*9 9 Live Load: U480* #4 bars: 20"minimum ON 0 Total Load: U240* 7- Tolerances for foundation and slab alignment as well as placement of reinforcement #5 bars: 25"minimum Increased floor stiffness may be required by floor covering manufacturer lerances for Concrete Construction and #6 bars: 30"minimum shall be in accordance with"Standard To ab edges may be up to 1/2"inside of the sill plate. cog Materials,"ACI 117. Footing or sl Roofs: 3. Grout all cells containing vertical reinforcement in 6-0"maxi 04 9- DRAWN BY: Live Load- L1240 F CMF when the I 's Total Load: L/1 80 4. Provide cleanouts per ACI 530.1-08 in the bottom course of CHECKED BY: FSS height exceeds 5'-0". SHEET: 5� Beam reinforcement shall be continuous across control joints. S_1 Clay Masonry(Brick): 12- Fasten plies of 1 3/4"wide engineered lumber as follows: WINDOW,DOOR AND SOFFIT PRESSURES: 2-ply beams with(3)rows of 0.131"x3 1/4"nails @ 12"o.c. 1� All window,door and soffit assemblies shall be designed to withstand the design 1. Brick shall conform to ASTM C62,C216,or C652 for Building Brick, Facing Brick,and 3-ply beams with(3)rows of 0.131"x3 1/4"nails @ 8"o.G. (each side) pressures indicated below and shall be installed in accordance with the manufacturer's Hollow Brick,respectively. Grade SW shall be used. 4-ply beams with(2)rows of Simpson 6 3/4"long SDW screws @ 12"o.c. requirements. STRUCTURAL STEEL: 2, Brick veneer shall be anchored with approved ties spaced no more than 16' o.c. vertical and 16"o.c.horizontal. Additional ties shall be provided around all wall openings greater than 16"in either direction,and shall be spaced no more than 36" 1 Structural steel shall conform to AISC Specifications for Design and Fabrication and o.c.and placed within 12"of the openings- Erection of Structural Steel for Buildings(latest editions). a.Welded connections: AWS D1.1 WIND PRESSURES ON WINDOWS, DOORS & U. 0 No.9 gage wire and shall b. Structural steel shapes, plates: ASTM A36 Strand wire veneer ties shall not be less in thickness than C4 have a hook embedded in the mortar joint, Sheet metal ties shall not be less than No. c.Structural steel pipe: ASTM A53 or A501 SOFFITS (psf) 22 gage by 7/8"corrugated and fastened with 1 %"galvanized roofing nails. d.Structural steel tubing: ASTM A500 W LU LU Adjustable or strand wire veneer ties shall be used at CMU walls. AREA OF OPENING EDGE STRIP (5) INTERIOR ZONE (4) 1 0 mply with AISC specifications. Z LU 2. All structural steel connections and fabrications sha co Neg Pos Neg _J E Pos 4. Unless otherwise noted on the plans,a steel angle L4x4x1/4 shall be used for s angle will not be required for arched 3. Steel shop drawings shall be provided to the Engineer for approval prior to fabrication. supporting brick veneer over openings. Thi 0 to 20 sf 18.3 -24.5 18.3 W UJ rting. If the length of the opening exceeds U-13"then -19.1 E E� windows where brick is self-suppo 20.1 to 50 sf 17.5 -22.8 17.5 LL 4. Holes required for bolted connections may be drilled or punched. Flame-cut holes 0 16.41 -20..6 16.4 -18.0 0 _J the steel angle shall be attached to the wood framing with 3/8!'x 3"lag screws @ 12" 50.1 to 100 sf 0 15.5 -17.1 -0 O.C. shall not be used. to 200 sf .5 100.1 200.1 to 500 sf 14.7 -17.41 14.7 18.3 WOOD FRAMING: 5. Bolts shall be installed to the"snug-tighV'condition-u.o.n. Soffit Design Pressure 18.3 -24.51 w Base Design Pressure 15.50 GCpi ±0.18 44/ ational Design Specification 6. All structural steel shall be shop-painted with SSPC Paint 15(red oxide)primer. Prior 1. All wood framing has been designed in accordance with"N -6"Commercial Blast Cleaning". (NDS)for wood construction 2005 edition- to painting,steelwork shall be cleaned per SSPC SP LC 7. SSPC Paint 36(polyurethane)shall be applied as the final coat to all structural steel 2- All wood members exposed to weather or in contact with masonry,concrete or soil Z shall be treated with an appropriate preservative suitable for the exposure conditions. surfaces exposed and visible to the exterior of the structure. r Ile I 2 3. If ACQ treatment is used on any wood member,then all nailing shall require 8. Field touch-up after installation where required to restore final finish. $'sit =0 hot-dipped galvanized nails meeting ASTM Al 53,Class C,or ASTM B695,Class 50. W Z TYPICAL EDGE STRIP(5) Z0 - then galvanizing is not required. HARDWARE AND ANCHORS: = 00 If borate treatment is used f- Z ZU a=35 4. Prefabricated wood trusses shall comply with NDS and"National Design Standard for 1. All framing anchors and connectors noted on the structural drawings shall be U_ Z 0 n Strong-Tie or Engineer approved equal. TYPICAL INTERIOR ZONE(4) LU Metal Plate Connected Wood Truss Construction(ANSI/TPI 1-07)." manufactured by Simpso 5. All trusses shall be designed by the Truss Manufacturer's registered Engineer. 2. All anchor bolts and threaded rods shall be in accordance with ASTM A307 or ASTM F1554, Grade 36. 6. The Truss Manufacturer shall submit shop drawings and design notes with a registered Engineer's sea[for approval. Design notes shall include the rated load 1 All metal connectors and hardware which are exposed to the exterior or in contact D cturer's license to fabricate with ACQ pressure treated lumber shall be Type 316 stainless steel or galvanized per g U_ capacity of the truss to truss connectors,and the manufa 5 > posed.The contractor shall approve ASTM Al 53,Class C, or ASTM B695, Class 50. trusses utilizing the connector system pro fabrication and installation drawings showing size,shape and layout- 4� Anchor adhesives shall be either Epoxy-Tie SET or Acrylic-Tie AT by Simpson ing,during installation of Strong-Tie(with Florida Product Approval)and installed according to the 7. Jobsite handling and erection, including temporary brac: trusses shall comply with TPI/WTCA BCSI 1. manufacturers instructions. Holes shall be cleaned of all debris and brushed out prior to installation of anchor adhesive. 6 9 8. All prefabricated wood trusses subjected to uplift conditions shall be securely fastened to their supporting walls or beams with metal connectors as noted in the Truss ROOF COVERING: Z g f Connection Schedule. The contractor shall be responsible for the design and installation of th applicable 1 e roof covering 9. All gable ends shall be balloon framed or braced in accordance with the system. SCALE: detail as shown in the structural drawings. rding to the Y4'=T-O"(U.0-N.) 2. Asphalt shingles shall comply with ASTM D3161 and be installed acco DO NOT SCALE .42 THIS DRAWING 10. Guardrails,handrails,and guard in-fill components(Balusters and Panel Fillers)shall manufacturers requirements. 1 RELEASE DATE: be provided by others. 9 06-04-13 and Clay Roof Tile Installation REVISIONS: 3. Clay and tile roofs shall be installed per the"Concrete 11. Engineered lumber(LVL, Parallam or LSL)shall meet the following minimum material Manual,"and the manufacturer's requirements. _specifications: LVL or Parallam LSL 4. Standing seam metal roofs shall comply with ASTM E1514 and be installed according E=1,900,000 psi E=1,550,000 psi to the manufacturer's requirements. Fb=2,600 psi Fb=2,325 psi DRAWN BY: responsible for the design and installation of all metal flashing Southern Yellow Pine member design incorporates design values for all sizes and 9 CMF Fc=750 psi Fc=800 psi 5. The contractor shall be visually graded Southern Pine dimension lumber per"Supplement No.13 to 2 CHECKED BY: Fv=285 psi Fv=31 0 psi and valley material. grades of the 2002 Standard Grading Rules for Southern Pine Lumber,"published by the FSS SHEET: Southern Pine Inspection Bureau (SPIB)_ J S-2 J z Lu Lu Z cn w o Lu I'- o 67'-0" = L? 6'4' 16"x 16"PILASTER ON ow", uj t- 2T-11" T-0- %N1 CIA 30"x 30"x 12"PAD FOOTING 16"x 16'"PILASTER ON 11'4" T-9- \-\ 0 30"x 30"x 12"PAD FOOTING WITH(3)#5 EACH WAY :o 0 co WITH(3)#5 EACH WAY SEE DETAIL"E"ON SD-1 SEE DETAIL"E"ON SD-1 ——— ol cl) cl) uj Q 4"CONCRETE SLAB WITH uj 6x6WI-4xi.4WWFOR ;o FIBERMESH OVER 6 MIL C9 cn c,> �2 'kSD-2 VAPOR BARRIER COVERING 04 uj —16"x 16"PILASTER ON 0 UP CLEAN,COMPACT,TREATED FILL. U) - > 30"x 30"x 12"PAD FOOTING �"� 8-. C? I I I 1 6 z Eo V-3' WITH(3)#5 EACH WAY D 20'-1 1" 4 5" T4" 9!-5" SEE DETAIL"E"ON SD-1 -2 .0 Is ;i zq L < Z u- Lu �D2 Z c) B H F�- to cl) SD-2 9 —— — 101- I I j u- 16"x 16"PILASTER ON > 48"x 48"x 12"PAD FOOTING cl) B WITH(4)#5 EACH WAY SEE DETAIL"E"ON SD-1 F-1 SD-1 H SD-2 P: w < 0 ED 45 C? SCALE, E )r=T-0-(LI.O.N.) 16"x 16"PILASTER ON I DO NOT SCALE -n. 29-6" THIS DRAWING 30"x 30"x 12"PAD FOOTING 21'-2" 6!-o" w C:) RELEASE DATE: WITH(3)#5 EACH WAY CD U) 06-04-13 SEE DETAIL"E"ON SD-1 R7'-0" CJ SUGGESTED CONTROL JOINTS REVISIONS: LOCATIONS(SEE DETAIL-r ON SD-2) DENOTES TWO STORY FOOTING CONDITION i! �RAWN BY s C CONTRACTOR SHALL VERIFY ALL DIMENSI E CHECKED BY: USING FINAL APPROVED FLOOR PLAN PRIO ji FSS I SHEET: TO CONSTRUCTION. FOUNDATION PLAN S-3 NOTES: > 1) ALL FIRST FLOOR EXTERIOR WALLS SHALL BE CONSTRUCTED WITH2x6SPF NO.2 STUDS @ 16"O.C.FOR PLATE HEIGHT OF 10'-1 Y8'-U.O.N_ 2) ALL FIRST FLOOR INTERIOR BEARING WALLS SHALL BE CONSTRUCTED WITH2x4 i :2 0 SPF No.2 STUDS @ 16"O.C.FOR PLATE HEIGHTS UP TO 10--1 Y8'-U_O.N. E ? 0 3) THE FIRST FLOOR EXTERIOR WALL FINISH IS FLEXIBLE'(SIDING)-U.O.N. LL NOTIFY ENGINEER OF ANY VARIATIONS. Ix Lu Lu 0 w NOTE: 2 0 BLOCK SOLID BETWEEN L? FLOORS AT ALL STUD POSTS LIJ 0,1111111 ky 11111411'.. 04 E ALTERNATE: HUC41 0 or SD-7 EQUIVAl ENT �—NOTE: 40 IF :fc, �!* NOTE: SW_3 SW-3 SW-3 H FRONT EXTERIOR POST LL- _Lll�- ---- -- - - - Ap EACH REAR EXTERIOR POST fflr_T� — — SHALL BE TREATED 6)(6 POST ON (2—)2kl__2 — — - — : fz�', SHALL BE TREATED 8X8 POST ON C? 2 2XIO HEADER-% ABU66-Z POST BASE.STRAP POST TO ABU88-Z POST BASE.STRAP POST TO EACH BEAM ABOVE WITH H6-Z CLIP- U) SEE DETAIL"F"ON SHEET SD-7 EACH BEAM ABOVE WITH H6-Z CLIP. 61 SEE DETAIL"F"ON SHEET SD-7 s z CL cli co U)7tw (2)JACKS c� uj (MIN.) 00 Z zi 0 SHEARWALLLEGEI x 0 Ezz z > Z 0 Z wo Ln K C"N 911 NON-BEARING WALL 13: g cn 0 cn C7 I F4 BEARING WALL a _j < zz >1 -.1 Z ca -SOLID IIII illicv) CORNER SW-6 w H� !,� �_z SHEARWALLS FASTENED WITH �,(3)2X6 BUILT-UP JILT-UP 8d COM(0.131'x 2 Yf)NAILS @ w A3)2X6 BI .& Lli ..�TO" POST(MIN.) lll�/(p 6"O.C�ON EDGES AND 12"O.C. 1 0 2�1 J....... POST(MIN.) - < cl) .... ....... ON INTERMEDIATE SUPPORTS. CC H 0 71 =1;2 (2)2X6 BUILT-UP (4)2X6 BUILT-UP--- SW_3 Lu POST(MIN.) ....... i7l POST(MIN.) < cq SHEARWALLS FASTENED WITH 3 Lu ALIGNED W/ 'x 2 Y2')NAILS @ cl) 8d COM(0.131 POSTABOVE 3"0-C.ON EDGES AND 12"O.C. CR4 ON INTERMEDIATE SUPPORTS. SHEATH BOTH SIDES OF WALL SA AT INDICATED SHEARWALL j (2)2x6 BUILT-Up Z5 S R (2)2X12 POST(MIN (L2XU ___jREAIED_ NOTE:ALL EXTERIOR WALLS SHALL BE'SW-6'U.O.N� ALTERNATE: E WOOD FRAMED HEADER LEGEND: .1 (2)2x10 HEADER 5 SCALE: :=i ii HUC41 0 or SD-7 V-0-(U.0-N-) EQUIVALENT 1�K SIZE DO NOT SCALE OFHEADER A THISDRAWING 7�� 1 RELEASE DATE: '(2)2x7 HEADER 06-04-13 i REVISIONS: i K 9 QUAN�TI�TYQUANTITY OFJACKS OF KING STUDS NOTE: DRAWN BY: CIVIF ALL WOOD FRAMED LOAD BEARING HEADERS .9 k CHECKED BY: SHALL BE MINIMUM(2)2x6 No.2 OR BETTER FSS SYP.INSTALL MINIMUM(1)JACK AND SHEEr: WALL LAYOUT-FIRST FLOOR (1)KING STUD AT EACH HEADER(U.O.N.) S-4 NOTES: 1) ALL SECOND FLOOR EXTERIOR WALLS SHALL BE CONSTRUCTED wiTH2x6SPF N,_2 STUDS @ 16-O.C.FOR PLATE HEIGHT OF T-1 U_O.N. 2) ALL SECOND FLOOR INTERIOR BEARING WALLS SHALL BE CONSTRUCTED WITH2x4 SPF No.2 STUDS @ 16"O.C.FOR PLATE HEIGHTS UP TO 9-1 Y8'-U.C.N. r a U. 3) THE SECOND FLOOR EXTERIOR WALL FINISH IS FLEXIBLE'(SIDING)-U.O.N. 0 z NOTIFY ENGINEER OF ANY VARIATIONS. 0 9 uj Lu Lu ce 0 UJI 13 0 &I Lu 0 (3)2x6 BUILT-UP-\ e (2)2X6 BUILT- U �E V lk POST(MIN.) POST(MIN.) NOTE' _,-_'i=BALCONY POST SHALL BE TREATED co =z T_� — — —E3 (2)2x12 4X4 POST STRAPPED TO FRAMING BELOW cl m 6 WITH MSTA36-Z STRAP.STRAP POST TO z BEAM ABOVE WITH H6-Z CLIP. % TYPICAL ALL POSTS-(U.O.N.) LU 0 " III "A Nl� Ic? cn: . < cli H ui ... ....... —x z :3 .......... c, SHEARWALL LEGEND- 3111- ............ > cl. z I c� U- x :z < m NON-BEARINGWALL 78E Zo Z3 2a !'4'110 X:111� - 't Z W c— > 0 co 2 M 0 BEARINGWALL .9 < cn Ic" r 15 (3)�M BUILT UP < all POST(MIN.;,\\ z 0 ui y !R (3)-tY4"x9Y2" L SW-6 (3)1 Y4':114'LVL(RAISED) 9 S2 SOLID� SHEARWALLS FASTENED WITH u- CORNER 8dCOM(0.131'xM-)NAILS@ ....... . E Lu ...... 1 T-MiRMS EX 6"O�C�ON EDGES AND 12"O.C_ (3)1 Y4"x 9 Y2"IJVL i W< ON INTERMEDIATE SUPPORTS- 3J 1 K:: V m 0 W L)WO_RAISEDUA�.�. (4)2X6 BUILT-UP- ....... SW-3 .......... U) of Z uj POST(MIN. SHEARWALLS FASTENED WITH cr < 0 Y_ ;I....... r c"j Al KIUUt ..... . . .... Lu ....... ......... 8d COM(0.131'x 2 Y2')NAILS @ 2)JACKS................................... ,(4)2x4 BUILT-UP . �11 I ,;-, m 3"O�C.ON EDGES AND 12"O-C. 7. 'T< (MIN.) ....... .............. 'ORTS Z C'4 — ��ujll ON INTERMEDIATE SUPF 0 — :;2 EXTEND WALL UP TO ....... 04 .......... ROOF&NAIL SHEATHING ........:: 11 cc,' INTO TOP PLATE @ 6'O�C. ....... ....... SHEATH BOTH SIDES OF WALL 5, AT INDICATED SHEARWALL C? co (Z,2xjpMED_BEAM_ NOTE:ALL EXTERIOR WALLS SHALL BE"SW-6"U_O.N. 0) WOOD FRAMED HEADER LEGEND: SCALE- E X=1'-0'(U,0.N.) SIZE DO NOT SCALE OF HEADER THIS DRAWING N RELEASE DATE: �ER (2)2x 7H�D 06-04-13 11REVISIONS: 9 QUANTITY-/ '-QUANTITY OFJACKS OF KING STUDS NOTE: -9 DRAWN BY: F CMF ALL WOOD FRAMED LOAD BEARING HEADERS .9 — 2 CHECKED BY: SHALL BE MINIMUM(2)2x6 NO.2 OR BETTER FSS SYP.INSTALL MINIMUM(1)JACK AND SHEEr: (1)KING STUD AT EACH HEADER(U.O.N.) S2 WALL LAYOUT-SECOND FLOOR S-51, Ll ATHREADED ROD LEGEND: THREADED ROD FROM FOUNDATION TO DOUBLE 5 PLATE.(4-MINIMUM EMBEDMENT REQUIRED) Y8'THREADED ROD FROM FOUNDATION TO UPPER FLOOR DOUBLE PLATE.(4 MINIMUM EMBEDMENT REQUIRED) 0 13 = HOLDOWN(AS NOTED)INSTALLED AT SILL PLATE 0 U. NJ = HOLDOWN(AS NOTED)INSTALLED AT SILL PLATE.COUPLE MINIMUM X-0 ROD TO HOLDOWN ANCHOR AND CONTINUE It TO DOUBLE PLATE ABOVE. LL HOLDOWN(AS NOTED)INSTALLED AT SILL PLATE-COUPLE Lu 0 ui U) MINIMUM Y2'0 ROD TO HOLDOWN ANCHOR AND CONTINUE 0: uj TO UPPER FLOOR DOUBLE PLATE ABOVE. 0 2 U) ui 0 uJ uJ C.4 -J A LTERNATE E HUC410or r HTT5 5 r--HTT5 E NOTE: -m 5— HTT' OW EQ HOLTDT N //HCLDOWN��. f 11, SD-7 H FRONT EXTERIOR POST :: �:441 M NOTE: UIVALENT SHALL BE TREATED 6X6 POST ON :C0 /�H'OLDO IHOLDOWN� 0 ABU66-Z POST BASE.STRAP POST TO B w :z EACH REAR EXTERIOR POST SHALL BE TREATED 8X8 POST ON HTT5 TT5 EACH BEAM ABOVE WITH H6-Z CLIP. TT5 HTT5 = . . -Z POST BAS HOLDOWN s (1)*. ABU88 E.STRAP POST TO HOLDOWN HOLDOWN SEE DETAIL"F"ON SHEET SD-7 s c HOLDOWN EACH BEAM ABOVE WITH H6-Z CLIP. > ce 0 SEE DETAIL"F"ON SHEET SD-7 LO cl z STA18 AT EACH —HTT5 79 END OF HEADER p"0 Z;a HOLDOWN TT5 = z HOLDOWN => z z 0 0 Ljj HTT5 HOLDOWN- AT SILL HTT5----- .�To" mm"1 75 HOLDOWN..... ....... ----HTS24 AT---- HOLDOWN w is, GIRDER ........ HTS24 AT TT5 ........... ...... GIRDER HOLDOWN i .......... 94 STAl 8 AT EACH CS16 FROMI END OF HEADER T GIRDER To 1\ WALL cc ALIGNED _j HOLDOWNS" HTT&-� HOLDOWN 75 HTT5 HOLDOWN TT5 ;lOLDOWN. HOLDOWN ILL E SCALE: ALTERNATE: EXTEND RODS TO TOP 'HTS24 AT Y,'=l--0'(U.O.N.) HU0410 or OF SOLE PLATE ABOVE SD-7 GIRDER DO NOT SCALE EQUIVALENT THIS DRAWING RELEASE DATE: 06-04-13 REVISIONS: J! DRAWN BY: CIVIF CHECKED BY: FSS HE] THREADED ROD LAYOUT-FIRST FLOOR THREADED ROD LEGEND: YB'THREADED ROD FROM FOUNDATION TO DOUBLE PLATE.(4-MINIMUM EMBEDMENT REQUIRED) THREADED ROD FROM FOUNDATION TO UPPER FLOOR OW DOUBLE PLATE.(4-MINIMUM EMBEDMENT REQUIRED) 0 -J 13 = HOLDOWN(AS NOTED)INSTALLED AT SILL PLATE U. r z = HOLDOWN(AS NOTED)INSTALLED AT SILL PLATE-COUPLE 0 L) MINIMUM Y2'0 ROD TO HOLDOWN ANCHOR AND CONTINUE ui TO DOUBLE PLATE ABOVE. HOUDOWN(AS NOTED)INSTALLED AT SILL PLATE-COUPLE Lu o Lu MINIMUM Y2'0 ROD TO HOLDOWN ANCHOR AND CONTINUE IX CS1 6 STRAP TO UPPER FLOOR DOUBLE PLATE ABOVE- a UJI ul 2 BETWEEN FLOORS 0 CS1 6 STRAPA AND SPH6 AT DOUBLE X: uj uj BETWEEN FLOORS PLATE @ 32-0-C. 0: �-! AND SPH6 AT DOUBLE ALONG WALL PLATE @ 32-O.C. 110 ALONG WALL rE NOTE' /79) LCONY POST SHALL BE TREATED CS16 TO — — U) 44 POST STRAPPED TO FRAMING BELOW Z: , BEAM BELOW ADDITIONAL z -,�7 :111i WITH MSTA36-Z STRAP.STRAP POST TO Eg AND SPH6 UJI CS1 6 STRAP BEAM ABOVE WITH H6-Z CLIP. B u) :z U-) v- AT DOUBLE BETWEEN FLOORS TYPICAL ALL POSTS-(U.0-N.) PLATE C> All . ............ .. ........... ............... ADDITIONAL- "u co 9 CS16 STRAP BETWEEN FLOORS 0 ...... HTS�4 AT BEAM- Z AND CS16 TO r ,,-SSP TOP&BOTTOM AND u- GIRDER BELOW z 0 CS'16 TO Y4"x OF SDS SCREWS THROUGH Lu SHOE PLATE INTO GIRDER !;� D BEAM BELOW O.C. UB BELOW 32 AND SPH6 PH AT DO LE . . .................. . ....... PLATE&CSi� AT DOUBLE .........I........... ................. .. rE BETWEEN 0ORS PLATE<A SD-7 �\�HTS24 AT BEAM M d &CS16 BETWEEN ADDITIONAL--� ....... SP AT TOP PLATE CS16 STRAP FLOORS CS1 6 STRAP ....... >AAND CS16 BETWEEN BETWEEN FLOORS AND SPH6 AT DOUBLE BETWEEN FLOORS FLOORS ................................. . ........ PLATE @ 32-O.C, AnnITIONAI���� p B ALONG WALL ................................. 13 ....... ...... . CS16 STRAP ....... BETWEEN FLOORS g AND SPH6 AT DOUBLE ADDITIONAL PLATE CS1 6 STRAP ....... 5 a z DSP AT TOP PLATE 2 BETWEEN FLOORS L AND CS1 6 BETWEEN FLOORS SCALE: Yg"=T-0'(U.0.14-) &BOTTOM AN DO NOT SCALE THIS DRAWING /4 A 0 2 OuO S REWS,IN 1 0 C n— IS DRAWF IOFACH� LOORTRUSSBELOW RELEASE DATE: 6- 0:04-13 IREVISIO—NS: 9 DRAWN BY: CMF CHECKED BY: FSS SHEEr: THREADED ROD LAYOUT-SECOND FLOOR S-L� 0 Lu Lu W 0 = L? w C14 Ig IIIIQ _j -H8 CLIP AT EACH 2 t 0 u EXTERIOR FLOOR TRUSS -2xlO TREATED LEDGER ATTACHED # NN TO TRUSS wl(2)Y4"x 3 Y2"SDS SCREWS j7, AT EACH VERTICAL(16'O.C.MAX) —Eor F— F03 F06 I —LU28-Z(TYP.) a. ttK-,-- m cr. cro cr. cr, a, cr, cr. a. �& C>C c: a c a c C a c Z 0 Li-I.I. ILL ILL ILL LL LL LL ILL LL izIT--0 FOR 0 F07 0 H 7- -uf F03 F03 NOTE: F07 lz NO'l INSTALL H8 CLIP AT EACH F07 F03 BLOCK BETWEEN —7 fflr Z. FLOOR TRUSS BEARING OVER FLOOR TRUSSES UNDER fo< 8 Z �Z, REAR COVERED PORCH F07 F03 BEARING WALLS ABOVE(TYP.) o7 0 J- M 19 T F03 14A JL z< F07 rl 1.1 11 FF i 0 —" 11 w-j If 0 Hill F06 H LU j! F03 Fla u w t� III GIRDER F06 Fig F03 Lu 0 ........... F12 F03 TS24—'� .... . F03 u- m �j M z ...... H 24 A4-/' w ....... F17 (L RDE R Jill !co�, ....... F17 S241 .1 F03 RD I --=BETWEEN -113 0 F03 4 FLOOR TRUSSES C, 01 c� c� C, ::: z: Z: F03 ILL LL C9 AT SHEARWALL I.L LL LL cr A w 6 F03 U) ou 2x FLO F03 DIST Q 2 Ful o C., HTS24 AT \-BLOCK BETWEEN HTS2tAT TS24 AT SCALE- FLOOR TRUSSES GIRDER GIRDER X=V-0'(U.C.N.) AT SHEARWALL DO NOT SCALE THIS DRAWING RELEASE DATE: 06-04-13 REVISION& 9 DRAWN BY: CMF CHECKED BY: di FSS SHEET: J LOWER TRUSS LAYOUT S-8 0 U. r z 0 UJI Lu 0 Lu w 0 Z Ul c%& 0, 414% a. Loo s I cf) Z co 0 U26(TYP-) IU-11 VAUL I ED jF. z 0 FALSE C-5 >uwj ............. (12 CE -ING JOISTS @ 161,O.C. =--'> 8 cr ............ cn 2'. m FRAME b - c�A DOWN z 0 0 0 ce) CD 0< _X -LUS210-3 C4 j z-0 (n,j VAULTED-i, ,VAULTED F- C3 3 1 Y4"x 141VL�:LRI�SEP =L ZRE:- LL HU�412 @a 4"OT 2X6 CEIIN G OIJS T( . m (3)1 Y4"x 16"LVL RAISED) mo 2x10 IS DB 6 U210(TYP.) —1jr— Lu Uj z o 0 UJI U- t5 0 CD ........ u c, LLJ .................... x I G .--:-==�� !4 *, _j ;-, m _j C-4 CEILM.F31WR.............. �011 ::JOISTS 24'O.C. UJI ui acIl .2 x co 9 9 0 D z .2 -(3)EVENLY SPACED SCALE: 2X4'RAT RUNS'EXTENDING W=V-0-(U.0,14.) Do NOT SCALE MIN.6 THIS DRAW114G RELEASE DATE- 06-04-13 REVISIONS: F 3� 9 DRAWN BY: CmF CHECKED BY: FSS SHEEr: 3� CEILING L YOUT-SECOND FLOOR S-9 NOTE: ROOF SHEATHING < BRACE OVERFRANING TO TRUSSES OR d RAFTERS AS REQUIRED TO MAINTAIN MAXIMUM 6�0"SPANS. I 3Y4 '_�2x(50VERFRAMIING TOENAILS(TYP) r a 5 SIMPSON H3 CLIP A 0 ___2x8 No.2 SYP NAILED TO TRUSS CHORD w/ (5).131*x 3Y4'NAILS p__ p 0 —TRUSS TOP CHORD OR RAFTER Z cc uj I- U. U. 2X10 RAFTERS 16'O_C� (:K�VECTION-TYPICAL OVERFRAMING AT EXISTING ROOF :9 0 0 0 (3)2x6 POST /-OVERFRAME FRONT PORCH �10 TO BEARING ROOF ONTO UPPER ROOF Vk"dal Y co F' Z pi Li tr- Lu 0 w 0 :z 0 ---2x6 RAFTERS @ 24"O�C_ FOR FRONT PORCH ROOF _Nz ZR 0 z !z < Z LL F-Z BRACE BOV M WAL TO RAFT�IRS 6 F� f CA TIL Lu REQUIRED (3)2x6 POST As < B RACE,AB EW,, LT( RAF ERS TO BEARING Hi 11 11 0 01 AL L 0 I u_ M CANTILEVER RIDGE 14'LVL RIDGE Le AS REQUIRED S 1.4 -(3), — -- I S 2X6 POST '4�m POS 2XI3 I 3 T�BE TING, TC BEA ING ;;---OB IN . .... .... .... .... .... .... .... .... ... ... ... ... ... ... (2)1 Y4"x 2X8 RAFTERS 124'O.C,- 11 LVL RIDGE FOR LOWER PORCH ROOF ... ... ... ... Roof Framing Notes: 2X41POST �2)2x6 POST _6 I ALL CONVENTIONAL FRAMING SHALL BE Ni or BT.SYP Ti� BE TING, TO BEARING 2. ALL RAFTERS SHALL BE MIN.2x10's A 24"oc.(U.O.N.) > 3. FASTEN ALL RAFTERS TO PLATES WITH SIMPSON H8 CLIPS .6 0 Z IS WITH(5)10d x 1Y2"NAILS EACH END. ?6 2 4. FASTEN ALL RAFTERS AT RIDGES WITH COLLAR TIES.FACE-NAIL COLLAR TIES TO RAFTERS WITH(5).131"x 3)/4'NAILS. 2xl 0 LEDGER WITH 5. FASTEN ALL JACK RAFTERS TO HIPS AND VALLEYS WITH(4) i SCALE: (5)0.131'x 3 Y4'NAILS .131"x3y4"TOE-NAILS. E Yg'=V-0-(I.I.O.N.) 6. ALL RIDGES,HIPS,AND VALLEYS SHALL BE(1)NOMINAL SIZE LARGER DO NOT SCALE @ 16-O.C.(EACH STUD) 0 THAN ADJOINING RAFTERS.(I THIS DRAWING 7. FASTEN RAFTERS TO CEILING JOISTS WITH 13 Y�"NAILS. RELEASE DATE: 8. FASTEN RAFTERS AND CEILING JOISTS TO TOP PLATES WITH(3) 06-04-13 .131'x 3)/4"TOENAILS. REVISIONS: 9. FASTEN ALL HIPS AND VALLEYS TO PLATES WITH(2)SIMPSON MTS12 NOTE: TWIST STRAPS WITH(7)10d x I Y2"NAILS EACH END OF STRAP. IN LIEU OF THE SPECIFIED COLLAR TIES, MSTA24 STRAPS INSTALLED ACROSS THE TOP OF THE RAFTERS CENTERED ON THE RIDGE MAY BE USED.(5)13"NAILS I SHALL BE DRAWN BY: INSTALLED ON EACH SIDE(10 TOTAL PER STRAP) CMF CHECKED BY: FS —SHEET:- ROOF FRAMING LAYOUT IS-10 $2 _!j NOTFS: J.- 1 ALL FIRST FLOOR EXTERIOR WALLS SHALL BE CONSTRUCTED wiTH2x6SPF No.2 STUDS @ 16'O.C.FOR PLATE HEIGHT OF 9--1 X8'-U.O.N. THE FIRST FLOOR EXTERIOR WALL FINISH IS"FLEXIBLE'(SIDING)-U.O.N. NOTIFY ENGINEER OF ANY VARIATIONS. 23'-8" p UJI U) 19'-2" T-0 0 r-—— ———— Lu U) LU z 4"CONCRET�SLAB WITH 6x6 Wl 4xl 14 WWF OR ui FIBERMESH OVER 6 MIL UJI z VAPOR BARRIFR COVERING K D GARAGE DOOR NOTES CLEAN,COMPACLTREATED FILL. I f:�0 '41L SD-1,F �o 0 I. INSTALL( Z� c- cr MSTA30 STRAP AT EACH END All OF GARAGE DOOR HEADER-NAIL STRAP ci =c? low c? INTO HEADER AND JACKS BELOW. ZN 40 m C14 cli 0) 11 ct) :z Q 2. EMBEDDED STRAP AT EACH END OF GARAGE DOOR OPENING SEE DETAIL"F"ONSD-1 w �SDA) ir, 3. 18'GARAGE DOOR SHALL BE RATED FOR A IFEMBEDDED STRAP AT MINIMUM DESIGN PRESSURE OF 17A psf--t GARAGE DOOR OPENING r SEE DETAIL'F'ON SD-1 f SHEARWALL LEGEND. I L W!;� NJ ZO ........... t7-R 'n 9 2)13/4'x 113/8"LV .......... NON-BEARING WALL 0 - I i pm (DO 2J I ')K 0 9 < U) 2'-84- Z-81fT sa :3 S2 2- 18'-3� 4004 BEARING WALL WALLLAYOUT lzo cn r4 Lu y!�j 23'-8" SW_6 Z SHEARWALLS FASTENED WITH 1 0 LL FOUNDATION PLAN 8d COM(0.131'x 2y2j NAILS @ �2 _& Lu 6"O.C_ON EDGES AND 12"O-C. 040 W< ON INTERMEDIATE SUPPORTS. a F)� 0 m w SW-3 P4 ;,-m RODS @ 4'0.C-MAX W T7' SHEARWALLS FASTENED WITH ..................... ...... . 8d COM(0.131'x 2 YY)NAILS @ 3"O.C.ON EDGES AND 12"O-C- ON INTERMEDIATE SUPPORTS. 26 SHEATH BOTH SIDES OF WALL z AT INDICATED SHEARWALL z GARAGE DOOR NOTES 2 1- INSTALL(j-)MSTA30 STRAP AT EACH END NOTE:ALL EXTERIOR WALLS SHALL BE"SW-6"U.O.N. b d OF GARAGE DOOR HEADER.NAIL STRAP THREADED ROD LEGEND: WOOD FRAMED HEADER LEGEND: j SCALE: INTO HEADER AND JACKS BELOW. X,=l'-O'(I.I.O.N.) Y8'THREADED ROD FROM FOUNDATION TO DOUBLE SIZE I 0 DO NOT SCALE PLATE.(4!'MINIMUM EMBEDMENT REQUIRED) OF HEADER THIS DRAWING 2. EMBEDDED STRAP AT EACH END OF GARAGE DOOR OPENING SEE DETAIL"F"ONSD-1 RELEASE DATE: (2)2x THREADED ROD FROM FOUNDATION TO UPPER FLOOR —HEADER 06-04-13 I REVISIONS: DOUBLE PLATE.(4-MINIMUM EMBEDMENT REQUIRED) i K KN HOLDOWN(AS NOTED)INSTALLED AT SILL PLATE QUANTITYJ "QUANTITY OFJACKS OF KING STUDS HOLDOWN(AS NOTED)INSTALLED AT SILL PLATE.COUPLE MINIMUM Y2'0 ROD TO HOLDOWN ANCHOR AND CONTINUE NOTE: .8 DRAWN BY: TO DOUBLE PLATE ABOVE. CMF ALL WOOD FRAMED LOAD BEARING HEADERS 2. CHECKED BY: HOLDOWN(AS NOTED)INSTALLED AT SILL PLATE.COUPLE SHALL BE MINIMUM(2)2x6 NO.2 OR BETTER Ifi FSS SYP_INSTALL MINIMUM(1)JACK AND SHEET- THREADED ROD LAYOUT MINIMUM Y2'0 ROD TO HOLDOWN ANCHOR AND CONTINUE TO UPPER FLOOR DOUBLE PLATE ABOVE. (1)KING STUD AT EACH HEADER(U.O.N.) s—i i Of r Lu o Lu .. ...... .. ... ....... .. ...... .. ...... ... ....... .. ....... . LL 0 Lu 0 w ui U) 0 2x i FT IRS @ 6'O.C. z UJ tl A S-12 W. 'k S-12 r, ui Q- C 12..CEI,LING JOIST 3 Ca 16..0... 4z RA :uj Lo *'.0 6 *;o> "Z 2xi i P. IFT RS 0 1" I-C- s� "' o >Z6 Ig Z OF, CEILING LAYOUT ENDNAIL(2)0.131"x 3Y4'NAILS AT EACH LOOKOUT W z 0 r 2x6 BLOCKING AT EACH DIAGONAL BRACE Lu 2x6 DIAGONAL BRACE @ 48-O.C.WITH RAFTER(AS NOTED) Z .O.N-) (5)0.131'x 3Y4'NAILS AT EACH END(U LL ROOF FRAMING LAYOUT 2x4 FLATWISE LOOKOUT @ 48-0-C. ROOF SHEATHING(AS NOTED) FASTEN SHEATHING TO LOOKOUT WITH SHEATHING END NAILING REQUIREMENTS. W< H3 CLIP @ LOOKOUT(TYPICAL) 2x4 L-BRACE AT EACH LOOKOUT MAIL WITH . U)LL 0.1 31'x 3Y,'NAIL SPF MATERIAL NOTE ZCEPTABLE 7 MAXIMUM 12"OVERHAN 2x SUBFASM NAIL TO LOOKOUT WITH (2)0.131'x 3Y4"NAILS ENDWALL RAFTER NOTCHED FOR FLAT LOOKOUT NAIL SHEATHING @ 6-O.C.TO RAFTER WITH O-l3l'x2X'NAILS NAIL PLATE TO RAFTER WITH 0.131"x 3 X" .ie 'D.C. lx4 LATERAL BRACE @ 4 NAILS @ 6 a"O.C.NAILED TO EACH JOIST WITH(2)0.131'x 3-NAILS PLATE(AS NOTED) INTO(4)CEILING JOISTS.OVERHANG SOLID BLOCKING AT EACH LOOKOUT LOCATION MINIMUM 270 AVOID SPLITTING. f N WITH(4)0.131'x 3Y4'NAILS INTO LOOKOUT A'RATED SHEATHING CONTILIOUS SCALE: MINIMUM/ -(U.0 TO BOTTOM OF LOOKOUTS )V l'-O -N.) IMUM 12'OVERHAN DO NOT SCALE 77" NAIL JOIST TO GABLE STUDS WITH THIS DRAWING (4)0.131'x 3 Y4'NAILS @ 16-O.C. RELEASE DATE TOENAIL GABLE STUDS TO DOUBLE 06-04-13 NOTE RE—VISIONS: 8!-O"SOLID DECKING MAY BE INSTALLED:N LIEU OF PLATE WITH(3)0.131'x 3Y4'NAILS LATERAL BRACING AND DIAGONAL BRAC NG.. LSTAl 8 STRAP @ 48-O.C. CEILING JOIST(AS NOTED) DRAWN BY: �A SECTION-GABLE END WALL DIAGONAL BRACING 9 CMF CHECKED BY: S-12 SHEET: FSS S-12 BRICK VENEER WITH 1"AIR SPACE AND WALL TIES BRICK VENEER WITH VAIR �2 SPACE AND WALL TIES (1)#5 CONT. on CONT.FLASHING;PROVIDE WEEP HOLES SILL PLATE /--FILL JOINT WITH ELASTOMERIC SILL PLATE @ 33'0�C. CONT.FLASHING:PROVIDE JOINT FILLER SICL PLATE GROUT AIR SPACE BELOW FLASHING WEEP HOLES @ 33-O.C_ CONCRETE SLAB 9 HEIGHT OF CURB VARIES(8- 2 — GROUT AIR SPACE BELOW F 6"MIN. MAX�) CONCRETE SLAB ;T co cli SILL--\— FLASHING CONC GRADE RETE SLAB PLATE UL Z CONCRETE SLAB GRAD (1)#5 CONT. N� GRADE GRAD 8'CMU STEMWALL WITH(1)#4 48'0.C� AND IN EACH CORNER- FILL CELL SOLID AT EACH#4 REBAR. AND IN EACH CORNER. v, HOOK REBAR 12"INTO UPPER COURSE uj HLL ULLL SOLID AT EACH#4 REBAR. ;.I UJI OF BLOCKS AND 6"INTO FOOTING- Lu HOOK REBAR 12"INTO SLAB AND 6"INTO 11-0. ONE STORY-(2)#5 CONT. z 0) lz I uj I— FOOTING. 1'4" TWO STORY-(2)#5 CONT. 0 6 o ,_8 ONE STORY-(2)#5 CONT. 1 ONE STORY-(2)#5 CONT. ONE STORY-(3)#5 CO T. #5 CONT. 11-8" TWO STORY-(3)#5 CONT, V-9. TWO STORY-(3)#5 CONT. 'E Z UJ _3 e, SECTION-STEMWALL AT GARAGE K­A-� SECTION-STEMWALL WITH BRICK SECTION-MONOLITHIC WITH BRICK K—D SECTION-MONOLITHIC AT GARAGE ,,pow Lu NOTE: IF STEMWALL HEIGHT EXCEEDS 48"CONTACT \,�Dl NOTE: IF STEMWALL HEIGHT EXCEEDS 48"CONTACT ENGINEER FOR ADDITIONAL REQUIREMENTS. ENGINEER FOR ADDITIONAL REQUIREMENTS. Io- 0 Q) CONCRETE SLAB w :z z . :uj �o F I 1v SILL PLATE SILL S, CONCRETE SLAB x 'LLI 1 45' ........ CONCRETE SLAB P�T co GRAD� CONCRETE SLABAN, GRADE- GRADE--\ H.- 1)#5 CONT, Zm MU STEMWALL WITH(1)#4 48-O.C_ G D 1-4 pt 'M EINFORCEMENT(AS NOTED) 0 Is, zo < AND IN EACH CORNER. 'CMU STEMWALL WITH(1)#4 FILL CELL SOLID AT EACH#4 REBAR. HOOK REBAR 12"INTO SLAB AND 6"INTO w 3� @48-O.C.AND IN EACH CORNER. FOOTING. L CELL SOLID AT EACH#4 REBAR. 6' - 11 HOOK REBAR 12"INTO SLAB AND 6" REINFORCEMENT(AS NOTED) -0. ONE STORY-(2)#5 CONT. V-8" ONE STORY-(2)#5 CONT� V-4- I VVOSTORY-(2)#5 CONT. V-8- (2)#5 CONT. INTO FOOTING. Lu V-8- TWO STORY-(3)#5 CONT- < m S rE S 0 B ECTION-STEMWALL SECTION-MONOLITHIC ECTION-PAD FOOTING AT PORCH STEMWALL SECTION-PAD FOOTING AT PORCH THICKENED EDGE p M" \,�Dl NOTE: IFSTEMWALL HEIGHT EXCEEDS 48"CONTACT D 6 NOTE: IF STEMWALL HEIGHT EXCEEDS 48"CONTACT z ENGINEER FOR ADDITIONAL REQUIREMENTS. ENGINEER FOR ADDITIONAL REQUIREMENTS. w �D BRICK VENEER WITH VAIR SPACE ALTERNATE:MSTAM36 STRAPS IN LIEU OF EMBEDDED STRAPS(SEE DETAIL R ON SHEET SD-2) uj AND WALL TIES —CON STHD14 STRAP NAILED TO T.FLASHING'PROVIDE WEEP HOLES @ 33-O.C. BRICK VENEER WITH VAIR SPACE AND GARAGE DOOR POST. U) _j GROUT AIRSPACE BELOW FLASHING WALL TIES " P___ ——PA51 STRAP NAILED TO GARAGE EMBED STRAP INTO FOOTING co DOOR POST.BEND STRAP INTO 1)#5 CONT. CONT-FLASHING;PROVIDE WEEP AS SHOWN. a z u_ FOOTING AS SHOWN. SILL PLATE — X_ HOLES @ 33'0-C- 0 < CL .2 ILL JOINT WITH ELASTOMERIC 0 w F 6"MIN_ GROUT AIR SPACE BELOW FLASHING of < ix U) JOINT FILLER �R (f) Lu Z 2 Z)ILL HEI HT OF CURB VARIES(WMAX.) �,c u- :3Z Z 0 SCALE: �_i 1 11.1 OOK INTO FOOTING U5 PLATE CONCRETE SLAB ;z—#4WITH6"H Lu Y4*=V-0"(U.O.N.) AND BENT 12"MINIMUM INTO w DO NOT SCALE CONCRETE SLAB GRAD R, < GRAD THICKENED EDGE. cl) THIS DRAWING S= I I I I, I I A I 8"CMU STEMWALL WITH(1)#4 @48-O.C. b ;z, GRADE RELEASE DATE: I F 06-04-13 .1 49 REVISIONS: AND IN EACH CORNER. \1 N FILL CELL SOLID ATEACH#4 REBAR_ �,�GRAD 77/7 HOOK REBAR 12"INTO UPPER COURSE K, x x 6. OF BLOCKS AND 6"INTO FOOTING. ONE STORY-(3)#5 CO T_ < TWO STORY-(3)#5 CONT. V-9" )NE STORY-(2)#5 CONT- 9 DRAWN BY: CONT. - CMF CHECKED BY- SECTION-STEMWALL AT GARAGE WITH BRICK SECTION-MONOLITHIC AT GARAGE WITH BRICK DETAIL PA51 INSTALLATION(STEMWALL) DETAIL-STHD14 INSTALLATION(MONOLITHIC) SHEET- FS, NOTE: IFSTEMWALL HEIGHT EXCEEDS 48"CONTACT NOTE: IF STEMWALL HEIGHT EXCEEDS 48"CONTACT ENGINEER FOR ADDITIONAL REQUIREMENTS. ENGINEER FOR ADDITIONAL REQUIREMENTS. SD-1 SHOWER AREA -Z STRAPS SHOWER AREA MONOLITHIC FOOTING (2)MSTAM36 D �j <> NAIL EACH STRAP TO CRIPPLE STUD 8"CMU STEMWALL WITH(13)10d COM NAILS 7- 3"MAXIMUM OVERHANG FASTEN STRAP TO FOUNDATION (OPTIONAL) FORM EDGE 30 PLAN VIEW CONCRETE SLAB WALL WITH(8)kx2k CONCRETE �3� SCREWS INTO MASONRY OR PLAN VIEW LL (8)Y4'x I Y4'CONCRETE r L AL X/11\/ /�,x SCREWS INTO CONCRETE. a 0 CONCRETE SCREWS SHALL BE Ls� U) POWERSTAPPER"WITH PERMA-SEAL (1)#4 CONT. GRADE�, ,1) CONT- FINISH OR EQUAL. ul 6"MIN. U STEMWALL WITH(1)#4 @ I I I \48" C.AND IN EACH CORNER. STRAP SHALL BE COVERED WITH a uj SILL--\ ,,,,—HEIGHT OF CURB VARIES FE SILL 4 CONT. uj # SIDING OR STUCCO It L SOLID AT EACH#4 Ui I-- x FILL CEL z U) c,4 PLATE 0 PLATE CONCRETE SLAB HEIGHT OF CURB VARIES(8-MAX.) m U) EB HOOK REBAR 16"INTO NOTE: P 9 6"MIN\ < o 2 ORCH SLAB AND 6"INTO THIS DETAIL MAY BE SUBSTITUTED FOR .0mommor GRADE-\ I RETE SLAB FOOTING- 9 EITHER THE PA51 STRAP(STEMWALL) Z UJI x /�CONC OR GRAD 16 (2)#5 CONT. Is V-8- THE STHD14 STRAP(MONOLITIJOf' .. Lu V, 8-CMU STEMWALL WITH(1)#4 @ 48-0�C. lux AND IN EACH CORNER. < DETAIL- EMBEDDED STRAP U-NWE SECTION-PORCH STEMWALL rR 1; a. FILL CELL SOLID AT EACH#4 REBAR. ///7\// . I I/ I el� \,�D-2 /7111/gx -2 HOOK REBAR 12"INTO SLAB AND 6"INTO �,�D NOTE IF STEMWALL HEIGHT EXCEEDS 48"CONTACT FOOTING- ENGINEER FOR ADDITIONAL REQUIREMENTS. U) iz CD T-0"/ ONE STORY-(2)#5 CONT. , :IA—Lo 1- WZ vi -.0 0 u -i U�l ONE STORY-(2)#5 CONT. V-4- TWO STORY-(2)#5 CONT. NOTE: s 0 z TWO STORY-(3)#5 CONT- SAW-CUT CONTRACTION JOINTS(i.e-CONTROL JOINTS) AS SOON AS THE CONCRETE HAS HARDENED ENOUGH NOT TO BE DAMAGED DURING THE CUTTING PROCESS. ........ SECTION-STEMWALL AT EXTERIOR WALL SHOWER SECTION-MONOLITHIC AT EXTERIOR WALL SHOWER (TYPICALLY I-4 HOURS IN WARM WEATHER) CONCRETESLAB > NOTE: IF STEMWALL HEIGHT EXCEEDS 48"CONTACT 8,-', ENGINEER FOR ADDITIONAL REQUIREMENTS. Z OF, 0 000 Z5 P-4= Z SAW z FILL CUT WITH 1"DEEPxY8"WIDE ELASTOMERIC CUT AT DENOTED . z 2 FILLER LOCATIONS- ui 5E L'i (l)#5 CONT. t�E �-z CONCRETE SLAB GRADE-\ J SILL- 8"CMU STEMWALL WITH(1)#4 @ 1 0 u- CONCRETE SLAB PLATE 48"O.C.AND IN EACH CORNER. FILL CELL SOLID AT EACH#4 REBAR,HOOK REBAR 16"INTO All, 'GRAD CH SLAB AND 6"INTO (0- FOOTING. CONCRETE (2)#5 CONT. i7j (1)#5 CONT. w V-4- ONE STORY-(2)#5 C NT- L---] 94 V-8- -' TWO STORY-(3)#5 CONT. --� SECTION-TYPICAL SAW-CUT CONTROL JOINT SECTION-PORCH STEMWALL WITH BRICK K-T r­H`� SECTION INTERIOR BEARING I/�K SECTION THICKENED EDGE 1\�2 NOTE: IF STEMWALL HEIGHT EXCEEDS 48"CONTACT �D2 u� �D2 �D2 ENGINEER FOR ADDITIONAL REQUIREMENTS. 3 <. ,,,—BEARING POST(AS NOTED) SCALE: CURB HEIGHT VARIES Y4-=V-0-(LI.O.N.) [-CONCRETE SLAB CONCRETE SLAB 9 DO NOT SCALE SILL CONCRETE SLAB 1 IS DRAWING PLAT CURB HEIGHT VARIES 2 RELEASE DATE. 06-04-13 jr7 . , LL. U) :Lj TZEVISIONS: < A- z AS NOTED REINFORCEMENT(AS NOTED) (1)#4 CONT. NE STORY-(a#5 CONT. DRAWN BY: 9i CMF 3)#5 CONT. -9 CHECKED BY: SECTION-NON-BEARING STEPDOWN FSS SECTION-BEARING STEPDOWN SECTION-INTERIOR BEARING PAD FOOTING SD-2 SHEET: V SD-2 ,�Dl W. ROOF COVERING(BY OTHERS) ROOFTRUSSES— CORNICE DETAIL DOUBLE PLATE (BY OTHERS) NUT WITH Xx YX Y4'WASHER ALTERNATE�SIMPSON LBPS Y2 SLOTTED WASHER WITH 1"CUT WASHER. 5 .1 U. %'0 THREADED ROD 0 Xle OR'V3f RATED SHEATHING,EXPOSURE I-SHINGLE ROOF 'Y3-RAT D PLYWOOD SHEATHING,EXPOSURE I-TILE ROOF 32 E SIMPSON Y8'0 X 6 Y4'TITEN HD ROD COUPLER 2x SYP#2SUBFASCIA WITH '/3f RATED SHEATHING,EXPOSURE I-METAL ROOF Lu Lu WITH 1"CUT WASHER (2)0.131 x 3 A'ENDNAILS AT TRUSS FASTEN WITH 0.113-x 2 YV RING SHANK (1) NAILS @ 6-O.C.ON EDGES AND INTERMEDIATE SUPPORTS. uj LU GYPSUM BOARD CONNECTOR AT EACH TRUSS im (SEE TRUSS CONNECTION SCHEDULE) UJ (2)2x SYP#2 DOUBLE PLATE(U.O.N.) i-j 0 uj /�c DETAIL-THREADED ROD ASSEMBLY '--GYPSUM BOARD SD-3 4Q w RATED SHEATHING,EXPOSURE 1. 4 4�-* — FASTEN WITH 0.131"x 2 Y2'NAILS @ 6"O.C.ON c') W. U) EDGES AND 12"O.C.ON INTERMEDIATE SUPPORTS. (U.O.N.)(BLOCK ALL EDGES) Lu ,-2x SPF#2 STUDS@ 16-O.C--U.O.N.(SEE WALL LAYOUT) 0 Z NUT WITH 1"CUT WASHER 2x SPF#2 SOLE PLATE(U.0-N.)NAIL TO RIM ROOF COVERING(BY OTHERS) BOARD WITH 0.131'x 3 Ye NAILS @ 6"O.C. ROOF TRUSSES 0 CORNICE DETAIL 2%2'RATED STURD-1-FLOOR(T&G)SHEATHING p I W g (BY OTHERS) GLUED AND NAILED.FASTEN WITH 0.131'x 2 Y2"RING 8 SHANK @ 6-O.C.ON EDGES AND 12�O.C.IN THE 7K 0 Z E FLOOR JOIST(I-JOIST SHOWN,SAWN .3 �� � o JOIST SIMILAR-SEE SECTION"G"ON u- SD4 FOR OPEN WEB TRUSS) 0 Lu X16'OR'Y3f RATED SHEATHING,EXPOSURE I-SHINGLE ROOF 'Y 2x SYP#2 SUBFASCIA WITH 327 RATED PLYWOOD SHEATHING,EXPOSURE I-TILE ROOF GYPSUM BOARD Lou 'Y32'RATED SHEATHING,EXPOSURE I-METAL ROOF < FASTEN WITH 0.113"x EE t2 (2)0.131'x 3 Y4'ENDNAiLS AT TRUSS 2%'RING SHANK RIM BOARD 0 NAILS @ 6'0,C�ON EDGES AND INTERMEDIATE SUPPORTS. NAIL JOIST TO PLATE WITH(2)0.131'x 3 Y47 TOENAILS GYPSUM BOARD LL D1 X: (2)2x—SYP#2 DOUBLE PLATE(U-O.N.) a. :Z) CONNECTOR AT EACH TRUSS (SEE TRUSS CONNECTION SCHEDULE) TOENAIL RIM BOARD TO PLATE WITH (2)2x—SYP#2 DOUBLE PLATE(U.0-N-) 0.131'x 3 Y4'NAILS @ 8"O.C. z THREADED COUPLING AS REQUIRED GYPSUM BOARD GYPSUM BOARD ss 'I 2x SPF#2 STUDS@`16"O.C.-U.O.N.(SEE WALL LAYOUT) 2x— PF#2 STUDS @ 16'0.C.-U.0-N.(SEE WALL LAYOUT) 19 z g Yle RATED SHEATHING,EXPOSURE 1. ---� ie"RATED SHEATHING,EXPOSURE 1. _,----FASTEN WITH 0.131"x 2 Y2-NAILS @ 6-O.C.ON FASTEN WITH 0.131-x 2 Y2'NAILS @ 6-O.C.ON EDGES AND 12"O.C.ON INTERMEDIATE SUPPORTS- EDGES AND 12"O.C.ON INTERMEDIATE SUPPORTS. SCALE: (U.0.N.)(BLOCK ALL EDGES) (U.O.N.)(BLOCK ALL EDGES) F5 %'=l'-O"(U.O.N.) DO NOT SCALE THREADED ROD ASSEMBLY AT THREADED ROD ASSEMBLY AT .9 THIS DRAWING NOTED SPACING(SEE DETAIL-C- NOTED SPACING(SEE DETAIL�C- RELEASE DATE: THIS SHEET) THIS SHEET) 0&04-13 2 7E—VISIONS 2x—TREATED SYP#2 SILL PLATE WITH 9 INSET WALL Y27 FOR STUCCO SIMPSON Y8'x 6'TITEN HD(OR TITEN HD ROD COUPLER) INSET WALL Y2'FOR STUCCO 2k-TREATED SYP#2 SILL PLATE WITH E� APPLICATIONS WITH I-CUT WASHER@ 24-O.C. APPLICATIONS SIMPSON%'x 6'TITEN HD(OR TITEN HD ROD COUPLER) WITH 1-CUT WASHER @ 24-O.C. SEE FOUNDATION DETAILS 1! DRAWN BY: SEE FOUNDATION DETAILS T- C SECTION-TYPICAL EXTERIOR TWO STORY WALL CHECKED BY: SECTION-TYPICAL EXTERIOR ONE STORY WALL rB SHEET: FSS rA �SD-3) SD-3-, dl SILL PLATE(BELOW) gj 2x CORNER FRAMING FULL 8 HEIGHT STUDS(TYPICAL) 2x SPF#2 SOLE PLATE(U.O.N.)NAIL TO BAND (2)ROWS OF 0.13 1'x 3 Y4' NAILS @ 12-O.C. BOARD WITH 0.131'x 3 Y4'NAILS@ 6"O.C. 1 777 STAGGERED(TYPICAL) BAND BOARD E 2x6 OR 2x8 FRAMED WALL u- -SILL PLATE(BELOW) OPEN WEB TRUSS 2x4 CORNER FRAMING FULL HEIGHT STUDS MINIMUM OF(3)2X4 BLOCKS 12'LONG NAILED LLI LLI SHEATHING CONTINUOUS FROM BAND BOARD WITH(4)0A31'x 3 Y4'NAILS TO EACH ADJACENT ce W uj TO UPPER PLY OF DOUBLE PLATE. FASTEN WITH 0 2 STUD EDGE NAILING REQUIREMENTS OF UPPER WALL o ALTERNATE:INSTALL SOLID STUD IN THIS TOENAIL TRUSS TO PLATE WITH 7/ SPACE = Lu (2)0.131-x 3 Y4'NAILS 2x4 CORNER FRAMING FULL HEIGHT STUD 04 0 DOUBLE PLATE(U.O.N.) (2)ROWS OF 0A 3 1"x 3 X" Lu ul NAILS @ 12-O.C. 2x4 FRAMED WALL '4;4 SECTION-TYPICAL OPEN WEB FLOOR TRUSS rF SECTION-TYPICAL FRAMING AT 900 CORNERS a. z -C, SD-4 �4 lk Z'Z LA (D NAIL SCAB TO TOP CHORD WITH 6 1� Z (4)0.131'x 3 Y4'NAILS s ROOF OR FLOOR FRAMING(AS NOTED)--,,, -7e ---ADD 2X4 VERTICAL SCAB IN EACH TRUSS IF NO WEB IS PRESENT CONNECTOR IF NOTED (SEE CONNECTION SCHEDULE) 0 UPLIFT CONNECTOR(AS NOTED) (3)0.131'x 3 Y4' NAILS TYPICAL AT rlifill. 11 EACH TRUSS 0 2X4 SPF BLOCKING-NAIL WITH(2) Z 2X4 X-BRACE ACROSS LENGTH OF 0.131'x 3 Y4'NAILS AT EACH END SHEARWALL 2 (END NAIL OR TOENAIL) i NAIL SCAB TO PLATE WITH(3) o 0 Lu 0.131'x3k TOENAILS GYPSUM BOARD —TRUSS(AS NOTED) El Lu TRUSS BOTTOM CHORD 2X4 BLOCKING BETWEEN TRUSSES (2)2x—SYP#2 DOUBLE PLATE(U.O.N.)_// i x 0 N AIL PORCH SHEATHING AS NOTED TOENAILED TO DOUBLE PLATE WITH 0.131"x 3 Y4'NAILS @ 4-0-C. 2x SPF#2 STUDS@ 16-O.C.-U.O.N U) z EXTERIOR FRAMED WALL DOUBLE PLATE (SEE WALL LAYOUT) MINIMUM Y16'RATED SHEATHING, EXPOSURE I FASTEN AS NOTED ON WALL LAYOUT(BLOCK ALL EDGES) SECTION-EXTERIOR WALL PERPENDICULAR TO TRUSS SECTION-INTERIOR SHEARWALL PERPENDICULAR TO TRUSS --GYPSUM BOARD SECTION ONLY APPLIES WHEN REFERENCED THREADED ROD ASSEMBLY(IF NOTED) z INTERIOR SHEARWALL(IF NOTED)SHALL < 0 USE'/16'RATED SHEATHING FASTENED 6 NAIL EACH END OF BLOCKING TO z ZZ, AS NOTED. TRUSS(AS NOTED) BOTTOM CHORDS WITH(3)0131'x 3 Ye INSTALL 2x4 BLOCKING BETWEEN 2x TREATED SYP#2 SILL PLATE WITH SCAUE- TRUSS BOTTOM CHORDS @ 12'O_C_ r W=1'-V(U.O.N.) 2X4 SPF NAILER-NAIL TO TOP PLATE WITH I 0.131'x 3Y4'NAILS @ 6-O.C. SIMPSON Y8'x 6'TITEN HD @ 48'O_C_MAX. DO NOT SCALE A THISDRAWING BOTTOM CHORD OF TRUSS I L 2x—SPF#2 SOLE PLATE RELEASE DATE: NAIL EACH BLOCK TO DOUBLE PLATE WITH(3) 06-04-13 / WITH 0.131'x 3 Y4'NAILS REVISIONS: 0.131'x 3 k NAILS @ 8-O.C.-U.O.N. 9 NAIL PORCH SHEATHING AS NOTED y A�' EXTERIOR FRAMED WALL DOUBLE PLATE FLOOR BEAM(AS NOTED) ------MINIMUM X16'RATED SHEATHING, EXPOSURE I FASTEN AS NOTED ON WALL LAYOUT(BLOCK ALL EDGES) SLAB ON GRADE CONDITION RAISED FLOOR CONDITION DRAWN BY: CMF SECT CHECKED BY: (`E_--� SECTION-EXTERIOR WALL PARALLEL TO TRUSS rii'� SECTION-INTERIOR SHEARWALL PARALLEL TO TRUSS ('-K ION-TYPICAL INTERIOR BEARING AND/OR SHEARWALL FSS SHEET: SD-4 �'�4 THIS SECTION ONLY APPLIES WHEN REFERENCED SD- TYPICAL HEADER TO KING STUD CONNECTION(SEE TABLE) (2)2x-SYP#2 DOUBLE PLATE(U.O.N.)NAIL (TYPICAL DOUBLE PLATE SPLICE) a PLATES WITH 0.131"x 3'NAILS @ 8"O.C. 48"MINIMUM SPLICE LENGTH NAIL EACH PLY OF KING AND JACK STUDS TOGETHER JOINT IN LOWER PLATE JOINT IN UPPER PLATE STAGGERED Z3 n MINIMUM NAILING OF THREADED ROD ASSEMBLY CENTERED WITH 0.131-x 3 Y4-NAILS @ 6-O.C.STAGGERED TYPICALSTUDTO STUD TO PLATE NAILING* 3 0 ('16)0.131'x 3'NAILS IN THIS ZONE. ON SPLICE IN PLATE OR THREADED ROD (TYPICAL) DOUBLE PLATE _7 TYPICAL FRAMING AT CHANGE IN 9 8"MAX. x\1 ASSEMBLY WITHIN 12"ON EACH SIDE OF JACK STUD AND KING CONNECTION L PLATE HEIGHT STUD SIZE END NAIL TOENAIL- 6�MAX. JOINT. 6*MAX. STUD REQUIREMENTS \\ I ANGE IN (SEE WALL LAYOU __�—MSTA36 STRAP CENTERED ON CH 2x4 (2) (3) a a— PLATE HEIGHT r 2x8 (4) (5) 5 9 LL. I o LTHREADED ROD ASSEMBLY WITHIN 2x1 0 (5) (6) G"OF SPLICE IN LOWER PLATE 2X4 BLOCKING BETWEEN STUDS TOENAIL ALTERNATE:IF ROD IS GREATER -NAIL EACH PLATE LCK STUD OR ENDNAIL EACH END TO ADJACENT THAN 6'FROM SPLICE-ADD STUD WITH(3)0131'x 3 A"NAILS ALL NAILS NOTED ARE 0.131'x 3 Y4' SSP AT SPLICE. WITH(3)0.131'x 3 A'NAILS-TOENAIL ... LU OR ENDNAIL(TYPI Lu W Lu '�_2x SPF#2 STUDS@ 16-O.C.(U-O.N.) o" 0 iz Z,, m (SEE WALL LAYOUT) 2 Ul t- HEADER NAILING REQUIREMENTS CIA L) 6 (3)NAILS PER PLY LL. Lu UJ DOUBLE SILL REQUIRED WHERE OPENING 2x if# C WIDTH EEDS6 THREADED ROD ASSEMBLY AT 2x8 (4)NAILS PER �o NOTED SPACING 2x10 (5)NAILS JOINT IN SILL PLAT�" 2x12 (6)NAILS 2x TREATED SYP SILL PLATE 9Y2'LVL (5)NAILS,=TE PWIJ to rT_ I 11/8.LVL (6)NAILS F� z 14'LVL (7)NAILS PE SIMPSON Yex 6'TITEN HD TYPICAL STUD TO SILL PLATE —— ip -z >w �THREADED ROD ASSEMBLY CONNECTION 16"LVL (8)NAILS PER Pllk*",:� 0 (BEYOND) BUILT-UP POST(WHEN NOTED ON WALL LAYOUT) III[W BUILT-UP CORNER POST SIMPSON Yex 6 Y4'TITEN HD ROD COUPLER NAIL EACH PLY WITH 0-1 31*x 3 Ye NAILS @ 6-O.C.STAGGERED < U) DETAIL-TYPICAL WALL FRAMING CONDITIONS r 0 'n W z Z ti D 12'MAX. f4Lu u. U- INSTALL MSTA24 STRAP LOOPED OVER DOUBLE 32'O.C.- INSTALL DSP CLIP @ PLATE.NAIL TO CRIPPLE ON EACH SIDE WITH(6) MAXIMUM SPACING (U.O.N.) .131-X 1 Y2'NAILS. —DOUBLE PLATE STRAP CRIPPLE ig JACKS AND KING STUDS TO HEADER WITH (AS NOTED) LSTA18 STRAP Z HEADER(AS NOTED) .2 < 2x BLOCKING(TYPICAL) (3)0.131'x 3Y4'TOENAILS AT EACH END -------- ------- -- THREADED A& THREADED T-1———T-1 71———71 7 F_ 7--n———T-F _Fj———T1_ _F F_ SCALE: I I I I I I I I I I ROD ASSEMBLY r T-0-(U.0,N) ROD A� WAYIPLIECA SILL PLYTO KING STUD SSEMBLY DO NOT SCALE WITH(3)0.131"x 3 Y4'NAILS-TOENAIL THIS DRAWING OR ENDNAIL(TYPICAL) NOTE: NOTE: I I I I I 1 2 RELEASE DATE: THREADED ROD ASSEMBLY THREADED ROD ASSEMBLY -1 06-04-13 BEVEL BLOCKING AS REQUIRED FOR MINIMUM I NOT REQUIRED AT GARAGE NOT REQUIRED AT GARAGE 2 REV10--N—S: Y2�NAIL PENETRATION INTO MAIN FRAMING DOOR OPENINGS(U.O.N.) 9- DOOR OPENINGS(U.0-N-) MEMBERS.(TYPICAL) IF + (2)2x SILL LL_ ANCHOR BOLT AS REQUIRED ANCHOR BOLT AS REQUIRED SHEATHING MAY CANTILEVER UP TO 2" 1! MAXIMUM PAST SUPPORTS.ALL WINDOW 9 DRAWN BY: FLUSH HEADER CONDITION DROPPED HEADER CONDITION ATTACHMENTS MUST BE ANCHORED INTO 2X_ CMF MEMBERS. CHECKED BY: DETAIL-TYPICAL ARCH TOP OPENING DETAIL-DOUBLE PLATE STMPPING OVER WIDE OPENINGS SHEET: S THIS DETAIL ONLY APPLIES WHEN SPECIFICALLY REFERENCED —5 101 D Ld LAST TRUSS IN ROW REQUIRING BRACING END VERTICAL BRACING REQUIREMENTS NAIL DIAGONAL BRACE TO BLOCKING WITH(3)NAILS 8 :) . �2 BRITTLE FINISH FLEXIBLE FINISH 2x4 BLOCKING-TOENAIL OR ENDNAIL BRACING 16'O-C. 24"O-C. 16"0 EACH END TO ADJACENT TRUSS WITH RATED ROOF SHEATHING .C. 24"O-C- (3)NAILS NAIL DIAGONAL BRACE TO INTERMEDIATE _j NONE REQUIRED 0*TO 53" O'TO 47' 0"TO 67" 01 TO 59" WEBS WITH(2)NAILS ROOF SHEATHING 2x4 SPF No.2 DIAGONAL BRACE 2x4 L-BRACE 54'TO 114* 48"TO 99" 68"TO 145" 60"TO 126" LLI ROOF TRUSS(BY OTHERS)WITH (TYPICAL AT EACH END OF AE E 24"0 C 16"0 C 0.TO 47- 0.TO 67 48"To 99- 68"To 145' 11-Til I i CONTINUOUS LATERAL BRACING) LLJ 2x6 L-BRACE 115"TO 182" 100"TO 158' 146"TO 232" 127"TO 201' BRACE(IF REQUIRED) _j NOTE� NAIL DIAGONAL BRACE TO TRUSS —TO REPLACE(1)ROW OF LATERAL BRACING BRITTLE FINISHES ARE STUCCO OR ADHERED VENEER i INSTALL 2x4 No-2 SYP T-BRACE NAILED TO WEB WITH(3)NAILS FLEXIBLE FINISHES ARE WOOD SIDING,HARDI-PANEL, I EACH PLY OF TRUSS WEB AT 6"O.C.WITH CONTINUOUS LATERAL BRACE(QUANTITY BRICK VENEER,ETC. 1.1 ----RATED ROOF SHEATHING I I < 0.131"x 3"NAILS TO REPLACE(2)ROWS OF AND LOCATION DEFINED BY TRUSS SHOP Z Lu < Lu DRAWING-) 75 U) __-2x__L-BRACE NAILED TO i LATERALBRACING INSTALL 2x6 No.2 SYP Lu i VERTICAL WEB WITH T-BRACE NAILED TO EACH PLY OF TRUSS NAIL CONTINUOUS LATERAL BRACE TO 0.131"x 3"NAILS @ 6"O.C. ------- --- WEB WITH 0.131"x 3"NAILS @ 6"O.C. EACH TRUSS WEB WITH(2)NAILS o ------- --- LLI VERTICAL WEB IN GABLE ROOF TRUSSES(BY OTHERS) C4 END TRUSS NOTES: _j < t"0 j�U11111jull", -9 -I- UJI �_j 2x-LOOKOUTS AT 48"O.C. (3)TRUSSES M 41MUM i 1) CONTINUOUS LATERAL BRACES 40kV.1*111121 a w NOTE: '�S LATERAL BRIP, i ui �6R CONTINU( Q_ I cc CE No-3 SYP OR 2x4 No-2 SPF OR R(U.O... C_ T-BRACING TO BE USED WHEN CONTINUOUS ozo 1 R 24"0. LATERAL BRACING IS IMPRACTICAL. 3 z SPACING(SEE TABLE) 2) ALL NAILS SHOWN SHAL4%p?,*i' NAIL S- uj (U-O.N.) cn .A DETA 9N /,'�B SECTION TYPICAL T-BRACE rc IL-TYPICAL LATERAL TRUSS 6RACING i co) z DETAIL-TYPICAL VERTICAL BRAC rA ING AT GABLE END SD-6 0 u 2x4 SYP BLOCKING BETWEEN 4'NAILS NUT&3 x 3"xY4"WASHER LOOKOUTS H2.5A AT EACH LOOKOUT NAIL BRACE TO BLOCKING WITH(5)0.131"x 3 Y 4'TOENAILS AT EACH (SEE THREADED ROD ASSEMBLY DETAILS.) 0 2X4 LOOKOUTS @ 48-O.C.FOR v 1*111.4 EXTERIOR SHEATHING SHALL LOOKOUT TO TOP CHORD OF TRUSS. (3)0.131-X 3 Y OVERHANG Z:2X6 BLOCKING BETWEEN TRUSSES J�I�TH ____12"LONG2x SCAB(MATCH BOTTOM CHORD)WIV0*11111111111till b 17, BE NAILED TO BOTTOM CHORD (3)0.131"x 3 Y4'NAILS EACH END SPACERS-ffA_IL W/(3)0.131"x 3"NAILS 0 ---ROOF SHEATHING(AS NOTED) 2x4 BLOCKING REQUIRED BETWEEN 1-4 OF TRUSS WITH -ROOF SHEATHING(AS TEDJ---' LOOKOUTS < z 0.131'x 2Yl'NAILS@ 6' C. BOTTOM CHORD OF GABLE END TRUSS (U.O.N.ON WALL LAY LIT) 2x-BARGE RAFTER Ln Lu BALLOON FRAMED STUDS THREADED ROD ASSEMBLY !R M -9 0 (AS NOTED) FASCIA(BY OTHERS) i C LL -----SINGLE PLATE NAIL TO TRUSS SECTION A-A 2x4 LOOKOUTS @ 48'0_13� w w BOTTOM 2x4 LOOKOUTS @ 48"O.C. _§ 0 a. CHORDWITH 0-131"x 3 X" FOR OVERHANG NAILS @ 6-O.C. H3 CLIP OR EQUAL AT EACH H2.5A AT EACH LOOKOUT 0 LOOKOUT I GABLE END TRUSS(DROP GABLE) ---ROOF SHEATHING(AS NOTED) �D 2X6 BRACE SPACED @ 48�O.C.UNLESS P:41 OTHERWISE NOTED ON ROOF LAYOUT. TOP CHORD OF GABLE END TRUSS DETAIL-BALLOON FRAMED GABLE END(LOW CEILING VAULT) ADD 2X4 T-BRACE NAILED @ 6-O.C. 2 VERTICAL WEB OF GABLE END INTERIOR CEILING PITCH IS EQUAL TO OR LESS THAN Y2 OF EXTERIOR ROOF PITCH 'x 2 Y2'NAILS IF BRACE WITH OA31 LENGTH EXCEEDS 9-0'. TRUSS H2.5A AT EACH LOOKOUT Z NUT&3'x 3'X Y4'WASHER .2 - I 2X4 LOOKOUTS @ 48-O.C.FOR z OVERHANG A ROOF SHEATHING(AS NOTED) 12"LONG SCAB I SCALE: 2X4 SYP BLOCKING BETWEEN (MATCH BOTTOM CHORD) I %'=l'-0'(U.O,N.) 9 DO NOT SCALE LOOKOUTS WITH Y2'SPACERS I THIS DRAWING ---BALLOON FRAMED STUDS RELEASE DATE (AS NOTED) SEE DETAIL"G"ON SD-6 06-04-13 . \ GBC CLIP-(2)REQUIRED AT EACH BRACE BOTTOM CHORD OF GABLE REVISIONS: DOUBLE PLATE GYPSUM BOARD CEILING END TRUSS INTERIOR VAULT TOENAIL BOTTOM CHORD OF DOUBLE PLATE --.---EXTERIOR SHEATHING SHALL BE TRUSS TO DOUBLE PLATE WITH (2)2x 0.131"0X"NAILS@ 8"O.C. THREADED ROD ASSEMBLY NAILED TO UPPER PLY OF NOTE: DOUBLE PLATE WITH --,,"-2x4 DRYWALL BACKING INSTALLED ALL MEMBERS SHALL BE#2 SYP. 2x STUDS 9 DRAWN BY: 0_l3l'x2y2'NAILS @6'0-C. CONTINUOUSLY BETWEEN BRACES f - CMF (U,O-N.ON WALL LAYOUT) CHECKEDFBY- SS SHEET_ DETA -9 r-E IL-BALLOON FRAMED GABLE END(HIGH CEILING VAULD_ rF SECTION-GABLE END DIAGONAL BRACING SECTION-PLATFORM FRAMED GABLE END �,�-6 INTERIOR CEILING PITCH EXCEEEDS Y2 OF EXTERIOR ROOF PITCH THREADED ROD NOT SHOWN FOR CLARITY SD-6 NOTE: INSTALL SPH CLIPS AT 32"O.C.AT DOUBLE ATTACH DOUBLE PLATE TO STUD PER PLATE �2 DETAIL"G"ON SD-7 ALTERNATE:MSTA24 STRAP LOOPED OVER 2 UPPER LEVEL STUD EXTERIOR BEAM(AS NOTED) DOUBLE PLATE NAILED WITH(6)10d x 1 X2'NAILS INTO EACH SIDE OF STUD CS1 6 STRAP(CUT TO LENGTH)FROM UPPER DOUBLE PLATE UPPER LEVEL STUD STUD TO BEAM BELOW @ 32-O.C.(U-O.N.). NOTCH BEAM AS REQUIRED TO CS1 6 STRAP(CUT TO LENGTH)FROM UPPER E NAIL INTO UPPER STUD WITH(11)10d AND NAIL STUD TO HEADER BELOW @ 32'0�C,(U.O.N.). INTO BEAM WITH(11)1 Od NAILS. FIT BENEATH DOUBLE PLATE LU NAIL INTO UPPER STUD WITH(11)10d AND NAIL -4 ----BEGIN NAILING I"MINIMUM ABOVE SOLE PLATE I a BEAM BEARS ON(2)2x JACKS INTO HEADER WITH(11)1 Od NAILS. j W -----BEGIN NAILING 1"MINIMUM BELOW TOP OF (TYPICAL-U.0-N-) BEGIN NAILING 1"MINIMUM ABOVE SOLE PLATE 0 BEAM I I.- CONDITION: I NAILING NOT REQUIRED BETWEEN UPPER SILL 0 LU LU LU BEAM(AS NOTED) (NOTCHED BEAM) PLATE AND LOWER DOUBLE PLATE. z V) Z UJ FLOOR SYSTEM(AS NOTED) 0 DETAIL-CONNECTION OF UPPER LEVEL STUD OVER BEAM BEGIN 3: NAILING I"MINIMUM BELOW DOUBLE Uj PLATE SD-7 THIS DETAIL ONLY APPLIES WHEN SPECIFICALLY REFERENCED 0 DOUBLE PLATE NAIL SHEATHING TO DOUBLE PLATE WITH MONOLITHIC FOUNDATION-EXTERIOR (2)ROWS OF 0.131'x 2Y2'NAILS @ 6-O.C. ---LOWER LEVEL HEADER(AS NOTED) NAIL SHEATHING ALONG BOTTOM OF HEADER 3-O.C_ Y8'x 8'TITEN HD SCREW ANCHOR C/) or 3/8"x 6"SCREW ANCHOR BY HURRI-BOLT,INC. INSTALL DSP CLIPS @ 24'O.C.OR CO Z p ALU or Y8"THREADED ROD SET 4 X2'INTO ADHESIVE SPH (@ 32-O.C. DE 0A U)*0 Q 6 STEMWALL FOUNDATION-EXTERIOR EXTERIOR BEAM(AS NOTED) K_G TAIL-CONNECTION OF UPPER LEVEL STUD TO HEADER BEL...,., 0__ -,;- > z Y2'THREADED ROD SET 7'INTO ADHESIVE DOUBLE PLATE THIS DETAIL ONLY APPLIES WHEN SPECIFICALLY REFERENCED BEAM INSTALLED BENEATH DOUBLE PLATE INTERIOR APPLICATIONS- BEAM BEARS ON(2)2x JACKS ............ IF EDGE DISTANCE EXCEEDS 5" N \ > (TYPICAL-U.0-N-) ilff USE MONOLITHIC CONDITION Metal Connector Fastening Schedule < "1'8 cr. CONDITION: 2 Simpson ID USP ID Uplift Capacity(lbs) Fasteners L11 -4 0 i Anchorage(111,11.0.N.) Of 0519 VPA1 0 A35 n/a (12)0.131"x 1 Y." ri = (90 ABLI44-Z (12)0162"x 2V or(12)0162'x 3%' 5iF wl 7"embed 2 z (DROPPED BEAM) PAI-144-TZ T200(SYP) M ABU66-Z PAU66-TZ 2300(SY P) (12)0162"x 2Y.'or(12)0162'x 3%' 5YS"wl 7'embed < D CS16 R�S�1511 1705(SY P or SPF) (11)0 148"x 3"in each end-�22)total nia U_ rB ETAIL-TYPICAL DTT2-Z INSTALLATION DETAIL-EXTERIOR BEAM TO WALL CONNECTION , T, z 0 DSP _2 775(SYP or SPF) (8)0.148"x 11A*into studs LLJ SC-7) (USP DTB-TZ SIMILAR) (6)0148'x liv into double plate Z DTT2Z DTB-TZ 2145(SYP)1835(SPP) (8)y,X 11/2"SDS 1/2'w/4Y,"embed(mon o)and 7"embed(stem) BC 's 0 1L HC520 We (5)0131'x lVinto gable brace We MONOLITHIC FOUNDATION-EXTERIOR (7)0.131*x 21/2'into double plate V n/a.use RT7 =UJI 600(SYP) (5)0.131'x 2%'m each end-(10)total n/a 0 Y2ff x 12"TITEN HD SCREW ANCHOR ALTERNATE ANCHOR: H2.5T n/a us a RT7 645�SYP or SPF) (5)0 131'x 1%'in each end-(10)total nia H3 RT3A 455(SYP) (4)0.131*x 2%*in each end-(8)total We or Y8"THREADED ROD SET 7"INTO ADHESIVE H6 LFTA6 950(SYP)820(SPF) (8)0.131'x 21/2'in each end-(16)total n/a Y2'x 6'TITEN HD 0 "o H8 RT8A 745(SYP) (5)0 148'x 1 Vin each end-(10)total ril o L� M STEMWALL FOUNDATION-EXTERIOR BEAM (MECHANICALLY GALVANIZED) HDO8 n/a.us E)LJPHD8 7630(SYP)5495(SPF) (20)%"x 3"SDS 7/8"w/15'embed(SET epoxy only) (AS NOTED) X8'THREADED ROD SET 12'INTO ADHESIVE WITH 2'x X8'WASHER HDU5 PHD5__ 5645(SYP)4065(SPF) (14)%"x 2VSDS 518"wf-7'embed(mono)and 12'emb.d(stem) H6 CLIP FROM HDUB PHD6 6970(SYP)5020(SPF) 20)%")(S'SCS 7�8'1 wl 15'embed(SET epoxy only) �D INTERIOR APPLICATIONS- POST TO BEAM HE IA16 HTA16 1810(SYP) (10)0 148"x 1 Y.' 4'embed HTS20,HTS24 or HTS30 HTW20.HTW24 or HTVV30 1450(SYP)1245(SPF) (10)0.148"x 3"in each end-(20)total n/a 1711TSN�16 or HTSM20 HTVVM 16 or HTWM20 1175(SY P) (8)0 148'x 3"into wood n/a IF EDGE DISTANCE EXCEEDS 5"USE LAP BEAM PLIES AND Y2'x 12'TITEN HD SCREW ANCHOR NAIL AS SHOWN-(5) 1 4"x.1-V Titan into concret I e (4)Y or/8'x 8'TITEN HD SCREW ANCHOR 0-131'x 3 X"NAILS PER PLY HTT4 HTT4 4235(SYP) 36To7s­PFj (13)0.162"x 2Y.' 518"wl 7'embed(mono)and 12'embed(stem) X 5 HTT5 5090(SYP) 4375(SPP) (26)0 162"x 2Y2' 5,18"wl 7'embed(mono)and 12'embed(stem- - _�j or/8"THREADED ROD SET 6"INTO ADHESIVE z -wa- (12)0.131"x 1%' PT POST(AS NOTED) LTP4 MP41F -1-S-TA18 LSTA 18 1235(SYP)1110(SPF) (7)0.148'x Fin each end-(14)total n1a LTS 12 LTW 12 775(SYP)665(SPF) (8)0.148'x Fin each end-(12)total D Z ��c DETAIL TYPICAL HTT5 INSTALLATION HIS CLIP FROM POST -nja g "6 111? MSTA24 M STA24 1640(SYP)1455(SPF) (9)0 148'x Fin each end-(18)total nia TO BEAM -STAM24 SD-7 (USP PHD5 SIMILAR) M STAM 24 1500(SY P or SPF) (9)0.148'x 3'into wood We PT POST(AS NOTED) 5)Y."x 2'/.'7ten into CMU \-EXTERIOR BEAM ((5)Y."x 1%"Titan into concrete (AS NOTED) ABU POST BASE MSTA30 MSTA30 2050(SY P)1820(SPF) (11)0 148"x 3"in each end-�22)total We SCALE: MONOLITHIC FOUNDATION-EXTERIOR (AS NOTED) MSTA36 M STA36 2050(SY P or SPF) (13)0.148'777n each end-(26)total n1a I 5 %"=V-D'(1L.O.N.) Ys'THREADED ROD SET 15'INTO ADHESIVE MSTAM36 MSTAM36 1870(SYP or SPF) (13)0 148"x 3"into wood ri�a DO NOT SCALE PLAN VIEW AT TOP OF POST '/8"THREADED ROD 0. __(8)A"x 2'/."Titen into CMLJ WING I THIS I WITH NUT SET IN (8)Y."x 1%"Titen into concrete RELEASE DATE: STEMINALL FOUNDATION-EXTERIOR .0 W`TS12 or MTS20 MTW12 or MTW20 _M00_0(SYP)860(SPF) (7)0.148'x Fin each end-(14)total nia r06E04- ADHESIVE 13 THREADED ROD SET 15"INTO ADHESIVE (7-EMBEDMENT) MTSM 16 or MTSM20 HTVVM 16 or HTWM20 860(SYP) (7)0.148'x 3"into wood r/a REVIS100- (4)Wx 21/."Titan into CMU (4)Y."x 11K"Titan into concrete F INTERIOR APPLICATIONS- 4 PA51 TA51 3685(SY P or SPF) (21)0.162"x 2Vor(21)0162'x 3%' 14*embed 4 IF EDGE DISTANCE EXCEEDS 5"USE SPM or SPH6 SPTH4 or SPTHS 680(SYP)585(SPF) (12)0 148"x 1 V n1a 4 SSP RSPT6 350(SYP or SPF) 4)0 148'x 1%'into studs nJa THREADED ROD SET 8'INTO ADHESIVE I (3)0 148'x lVinto double plate STHD14 STAU14 4430(SY P or SPF) (38)0 148 x 3 Y." 14"embed �Oja�__ I ? DRAWN BY: .............. ............................ .............. 9 CIVIF SIDE VIEW AT BASE OF POST 1.All connectors are manufactured by Simpson Strong-Tie or USP Structural Connectors(U.O.N.) z 9 CHECKED BY: 1 SYP�Southern Pine,SPF Spruce-Pine-pir (�D DETAIL-TYPICAL HDU8 INSTALLATION �F DETAIL TYPICAL CONNECTIONS AT EXTERIOR POST FSS �SC-7 (USP PHD6 SIMILAR) SD-7 3.Mono=monolithic conc refs.stem=masonry sternwall or bond beam SHEET- 4.Anchorage refors to threaded anchors with notod diameters and embedment depths FE in-7