Loading...
345 5th St 2013 pool enclosure 2013 o or. -0 C-4 Lli c/) ..o-X Lo 0 L- E 0 C) D ilo-19 MV) Ln 0 >- ICID M Z LLJ uj cXZ E2 cXZ 0 z 110- z fi 0. 1. 0 LL- 0- x LLJ co 0 mo 2� LLI (1) U.- CN x I A 0 C14-0-X Lu 0 Ifl-- = C) (L 0 F. ui :) z a. Of - 14 C'4 Z cl) cl) LLLJ CL 0 ca -j -5 X < cl) Z orf - I D lwt o 04 0 cn Lo U) o 2x3 2x3 2x3 0 cn X C) --j --L w 9 M LL- 00 C-4 1 0 co 0 U� z (o -n 0 0 — M. ZE z 2x6 2x6 0) 2x3 co 2x3 oo 2x3 -40 > Of = C .0 0 .0 (n (n ME9 'n. oj c m 1 �cm 0 -00 r- x M < M + 2x3 20 20 2x 001 2x4 Z G) X Zs' x c x 2 > z C.R C" Xk 04 (j) 04 V) m G) Of - N owl � < Aw 0� � MB a� > V) < 99 E V) ILU)U. 0 F- < U) U (D c� CONTRACTOR: E ck� 42x6 24x 3 2x3 \2x'e'ol co to 0 0 20 x x x x x 8 0 0 CN 04 A CERTIFIED SCREEN Xm c a c C) CN -1 N2 U) 2\4 20 20 20 20 LLj C LL. 0 00 JOB: 0 (D:t�.2 L.) z L 0 141- u '2 21-1 11 T Qll"\\� 7'--0f'T77'-0" 8'-0" 81-011 GOOD G -4? RGMcHngine 345 5t 1928 River Lal oonTface., 471-011 ATLANTIC t. up-Stine, 46) 7_- COLOR: c (9 4-7631, p P. orgen,Jr. E 0 COMPOSITE ROOF ATTACHED TO CARRIER W/ 0 MIN (5) 1/4"x 4" LAG BOLTS W/ NEO WASHERS M a) PER 4' PANEL ACROSS THE ENDS AND 24" O/C _j - 0 LL- o ALONG EACH SIDE V) 0 0 ALONGE1 a. u --_ROOF BEAM tz M 11OX5/8" SMS 16" O/C tlOX5/8" SMS 16" O/C ACH SIDE OF BEAM 1ACH SIDE OF BEAM 3" COMP SITE ROOF LLJ z U-) "X CARRIER BEAM 0 / x C� 1 1/2"X 2" RECEIVIN 0 5; 0 @ x 2) 1/4"x 3" S.S. THRU O� x Lj Of -0 BOLT 0 EACH POST U) 0 -0 C 'RETE DECK PAVER DECK 0 ONC x (1�),3/13X 7"WEDGE ANCHORS (PRIMARY) 0.092" ANGLE BRACKET 1�4 X 2 ,1/4 TAPCON (PRIMARY) 12� 4 X '1 3/4 TAPCON (SECONDARY) X 5 "WEDGE ANCHORS (SECONDARY) (ONE EACH SIDE OF BEAM) LLJ Cf) THRU 0.092'ANGLE BRACKETS THRU 0.092"ANGLE BRACKETS R LLJ (EACH SIDE OF BEAM) EACH SIDE OF BEAM) 7" SUPERGUTTE Of U-1 W1 STRAPS (ONE 0 EACH BEAM- x 0 0 0 ONE 1/2 SPACING IN BETWEEN) V) Z C:) 0 1" 2" XO.044" BOTTOM PLATE 00 1"x2" XO.044" BOTTOM PLATE 00 -X Ld -4 00 ---FW/ 1/4 X 2 1/4 TAPCON 0 MAX 24- OC 00 W/ 1/4XX 2 1/4 TAPCON 0 MAX 24- OC r-- CONCRETE DECK WITH FOOTER -T I L-L- v) (6 PAVER DECK ON CONCRETE FOOTER Ir Q� 0 .0 �4).xl/4"x 1 3/4" TAPCON W/ Lu ILO (1) 1 4 3" S.S. THRU BOLT PER POST u Lo 00 < POST TO CONCRETE PAVER DECK ON CONCRETE FOOTER COMPOSITE ROOF TO POST ATTACHMENT V) 0 IF THIS BOX IS HIGHLIGHTED 0 0 a- 0 x C� X V) THE FOUNDATION IS EXISTING 10- CONCRETE DECK CL 46 ang AND HAS BEEN INSPECTED BY 4 X 2 1/4 TAPCON (PRIMARY) from slab o z LO ,6 \4 f�m asnI g 1 4 X 1 3/4 TAPCON (SECONDARY ab d THRU 0.092"ANGLE BRACKETS 0 THE CONTRACTOR AND IS IN 1474-;.r—11�4" tappons x 1 3 ( b 0 V (2) d from 0 (EACH SIDE OF BEAM) in p of slab GOOD CONDITION AND MEETS 2500 psi concrete 04 0 0 U-1 STRUCTURAL REQUIREMENTS 0 .. z 1"x2" XO.044" BOTTOM PLATE V) 0 1�-o 0, --Fw-/ 1 V) N /4 X 2 1/4 TAPCON 0 MAX 24- OC ui CONCRETE DECK NTH FOOTER < 4 < R RGM Engineering, Inc A�—�4 < 1928 River Lagoon Trace CABLE CONNECTION AT SL gustine, FL 32092 EXISTING CONCRETE SIDE WALL POST TO CONCRETE 4G,*1 9 o 814-7633 I HEARBY CERTIFY THAT THESE PLANS MEET OR EXCEED THE REQUIREMENTS OF THE tlVl� 2010 FL BUILDING CODE, CHAPTER 20 ASM35 AND THE 2005 ADM PART 1 -A & 11 ASCE 7-10. ob.e . rgen,Jr.,P.E. SEAL E 0 b 0 M _j C) LL_ 0 GUTTER STRAP U) 4k - _0 2"X 2"X 0.044" PURLIN 1 WITHIN 6" OF BEAM = .0 2 x 8" X 0.072" CONNECTION AND 0 1 0 1/2 BEAM SPACING W/ M 2 $`IOX5�8 SMS INTO GUTTER PURLIN OR CHAIRRAIL ATTATCHED 2"X 4"x 0.050" HEADF6R Ill 2 lOx INTO HOST TO BEAM OR POST W/ INTERNAL LLJ 0 u (HEADER TO MATCH WALL POST) . . . CLIP W/ MIN. (4)#10 S C) Z 0 5; 0 @ 1 1/2" X 2" RECEIVING >1 CHANNEL Lj -0 (4) 10 X 2 SMS LLJ 3 #lOX5/8"SMS 0 EACH SIDE OF POST z I__ 2"X 4"x 0.050" WALL POST 1 1/2" X 2" RECEIVIN INTERN�L#SCREW,POSSES w Cn CH Irf Ld Lf) 0 0 0 C/) Z 0 0.092" ANGLE BRACKET (EACH SIDE) 7" SUPERGUTTER 0 1 W/ 4 1OX5/8 INTO BEAM— >- rn & 4 1OX5/8 EACH SIDE INTO GUTTER LLj r__ C/i ch 0 ILD Ld (0 00 ROOF PURLIN TO SIDE WALL CONNECTION GUTTER CONNECTION GIRT TO POST OR PURLIN TO BEAM ATTATCHMENT 14 X 3K4" SMS 16" O/C 0 ACH SI E OF BEAM PURLIN LLJ 2"X 8" X 0.072[_ 2"X 3" X 0,045" ROOF IURLIN (2) #10 X 2" SMS TOESCREWED 2"X 8" X 0.072" ROOF BEAM ROOF BEAM < Ix 0 Li uj m 0 < x 0 0 0 1 0 0 L_ w Ljj 1 0 0 0 0 0 0 0 " 0 0 0 0 1 0 0 2"X 3" X 0.045" 0 0 0 0 0 01 1 0 0 0 In V) 0 0 0 C� ROOF PURLIN 0 0 0 ul 0 0- C� 0 0 x 0 0 LO 0 x 0 0 C) L0 14) x 't 0 0 t.0 C*4 0 0 0 0 0 - - - !10 0 Z. - 0 .125" GUSSET PLATE x LIJ 0 (12 — 2X3/4" SMS SCREWS 04 Z 2"X 6" X 0.050" 4IN EACH SIDE MINIMUM SCREWS EACH SIDE_ U) C) WALL POST 3EA+0ST #8Xl/2 #IOX1/2 #12Xl/2 V) IN SIZE I SIZE I Li Ld ZX4 8 1 5 4 ry 2X6 2X4 10 1 8 6 1 (3) #10 X 2" < IA 19 in < lb 1 14 lz 20 1 16 14 20 1 18 16 R RGM Engineering, Inc. Imam. 1928 River Lagoon'�raee ROOF TO WALL INTERNAL GUSSET PLATE WIND BRACE DETAIL m 11 ugustine, FL 32092 1 C ) 814-7633 1 HEARBY CERTIFY THAT THESE PLANS MEET OR EXCEED THE REQUIREMENTS OF THE 2010 I'L BUILDING CODE, CHAPTER 20 ASM35 AND THE 2005 ADM PART 1 —A & 11 ASCE 7-10. f rb . orgea,Jr.,PSFE A L MIN 4ft G) 5. W. Co.- OLD ti I il"-, - ,.� ra 1 �.s c.0 0 , , '. ", -.i.: ;, 1:1. E 0=3 Eli Pf > (G.E-2 .2-,:-g i; _�L Mtn C'* t C-3 r Wc co REWAIAVER OF LOT 22 . 1 OP po 1.50.13 Ct%W. MOO PLAT - - 'o j cz 71 -71, 9.3r to I!! -k . - a W 3r&j as L 0 T 22 c"21 cl� tb C.) C" lira Lo C6 <3 icl_ 5 2 0 Z4 C-.*'O%p o CL 30-9 35 X&V WOW Fo" _.z l'saoOMT 14 r50-90 CoAr, C-1 Lor te AVON