345 5th St 2013 pool enclosure 2013 o or. -0 C-4
Lli
c/)
..o-X Lo
0
L- E
0 C) D
ilo-19 MV) Ln
0
>- ICID M Z LLJ uj
cXZ E2 cXZ 0 z 110- z
fi 0. 1. 0 LL- 0- x LLJ
co 0 mo 2� LLI
(1) U.- CN
x I A 0
C14-0-X Lu 0
Ifl-- = C) (L
0 F. ui :) z
a. Of -
14
C'4
Z cl) cl) LLLJ
CL 0 ca
-j
-5 X <
cl) Z orf - I
D lwt
o 04
0
cn
Lo
U)
o
2x3 2x3 2x3 0
cn X C)
--j --L w 9
M LL-
00 C-4
1 0
co 0
U� z
(o -n 0
0
— M. ZE z
2x6 2x6 0) 2x3 co 2x3 oo 2x3 -40 >
Of = C .0
0 .0
(n (n ME9 'n. oj
c m 1 �cm
0 -00 r-
x M <
M
+ 2x3 20 20 2x 001
2x4 Z
G) X Zs'
x c
x 2
>
z C.R C"
Xk 04 (j) 04 V) m G) Of -
N owl � <
Aw 0�
� MB a� >
V)
< 99
E
V) ILU)U.
0
F-
< U)
U (D
c� CONTRACTOR: E ck�
42x6 24x 3
2x3 \2x'e'ol
co to 0 0 20
x x x x x 8 0 0
CN 04 A CERTIFIED SCREEN
Xm c a c
C) CN
-1 N2 U) 2\4 20 20 20 20 LLj C LL. 0
00 JOB: 0 (D:t�.2 L.) z
L
0
141- u
'2 21-1
11 T Qll"\\� 7'--0f'T77'-0" 8'-0" 81-011 GOOD G -4? RGMcHngine
345 5t 1928 River Lal oonTface.,
471-011 ATLANTIC t. up-Stine, 46)
7_-
COLOR: c (9 4-7631,
p
P.
orgen,Jr.
E
0
COMPOSITE ROOF ATTACHED TO CARRIER W/ 0
MIN (5) 1/4"x 4" LAG BOLTS W/ NEO WASHERS M a)
PER 4' PANEL ACROSS THE ENDS AND 24" O/C _j -
0 LL- o
ALONG EACH SIDE V)
0 0 ALONGE1
a.
u
--_ROOF BEAM tz
M
11OX5/8" SMS 16" O/C tlOX5/8" SMS 16" O/C
ACH SIDE OF BEAM 1ACH SIDE OF BEAM 3" COMP SITE ROOF LLJ
z
U-) "X CARRIER BEAM 0
/ x
C� 1 1/2"X 2" RECEIVIN
0 5; 0 @
x 2) 1/4"x 3" S.S. THRU O�
x Lj Of -0
BOLT 0 EACH POST U) 0 -0
C 'RETE DECK PAVER DECK 0
ONC x (1�),3/13X 7"WEDGE ANCHORS (PRIMARY) 0.092" ANGLE BRACKET
1�4 X 2 ,1/4 TAPCON (PRIMARY)
12� 4 X '1 3/4 TAPCON (SECONDARY) X 5 "WEDGE ANCHORS (SECONDARY) (ONE EACH SIDE OF BEAM) LLJ Cf)
THRU 0.092'ANGLE BRACKETS THRU 0.092"ANGLE BRACKETS R LLJ
(EACH SIDE OF BEAM) EACH SIDE OF BEAM) 7" SUPERGUTTE Of U-1
W1 STRAPS (ONE 0 EACH BEAM- x 0 0 0
ONE 1/2 SPACING IN BETWEEN) V) Z C:)
0
1" 2" XO.044" BOTTOM PLATE
00 1"x2" XO.044" BOTTOM PLATE 00 -X Ld
-4
00 ---FW/ 1/4 X 2 1/4 TAPCON 0 MAX 24- OC 00 W/ 1/4XX 2 1/4 TAPCON 0 MAX 24- OC r--
CONCRETE DECK WITH FOOTER -T I L-L- v) (6
PAVER DECK ON CONCRETE FOOTER Ir
Q� 0
.0 �4).xl/4"x 1 3/4" TAPCON W/ Lu ILO
(1) 1 4 3" S.S. THRU BOLT PER POST u Lo 00
<
POST TO CONCRETE PAVER DECK ON CONCRETE FOOTER COMPOSITE ROOF TO POST ATTACHMENT
V)
0
IF THIS BOX IS HIGHLIGHTED 0
0 a-
0 x
C�
X
V)
THE FOUNDATION IS EXISTING 10- CONCRETE DECK CL
46 ang
AND HAS BEEN INSPECTED BY 4 X 2 1/4 TAPCON (PRIMARY) from slab o z LO
,6
\4
f�m asnI g
1 4 X 1 3/4 TAPCON (SECONDARY ab d
THRU 0.092"ANGLE BRACKETS 0
THE CONTRACTOR AND IS IN 1474-;.r—11�4" tappons
x 1 3 ( b 0 V
(2) d from 0
(EACH SIDE OF BEAM) in p of slab
GOOD CONDITION AND MEETS 2500 psi concrete 04 0
0 U-1
STRUCTURAL REQUIREMENTS 0 .. z
1"x2" XO.044" BOTTOM PLATE V) 0
1�-o 0, --Fw-/ 1 V) N
/4 X 2 1/4 TAPCON 0 MAX 24- OC ui
CONCRETE DECK NTH FOOTER
<
4 <
R RGM Engineering, Inc
A�—�4 <
1928 River Lagoon Trace
CABLE CONNECTION AT SL gustine, FL 32092
EXISTING CONCRETE SIDE WALL POST TO CONCRETE 4G,*1
9 o 814-7633
I HEARBY CERTIFY THAT THESE PLANS MEET OR EXCEED THE REQUIREMENTS OF THE
tlVl�
2010 FL BUILDING CODE, CHAPTER 20 ASM35 AND THE 2005 ADM PART 1 -A & 11 ASCE 7-10. ob.e . rgen,Jr.,P.E.
SEAL
E
0
b
0
M _j
C) LL_ 0
GUTTER STRAP U)
4k - _0
2"X 2"X 0.044" PURLIN 1 WITHIN 6" OF BEAM = .0
2 x 8" X 0.072" CONNECTION AND 0
1 0 1/2 BEAM SPACING W/ M
2 $`IOX5�8 SMS INTO GUTTER PURLIN OR CHAIRRAIL ATTATCHED
2"X 4"x 0.050" HEADF6R Ill
2 lOx INTO HOST TO BEAM OR POST W/ INTERNAL LLJ 0 u
(HEADER TO MATCH WALL POST) . . . CLIP W/ MIN. (4)#10 S C) Z 0
5; 0 @
1 1/2" X 2" RECEIVING >1
CHANNEL Lj -0
(4) 10 X 2 SMS LLJ
3 #lOX5/8"SMS 0
EACH SIDE OF POST z I__
2"X 4"x 0.050" WALL POST 1 1/2" X 2" RECEIVIN INTERN�L#SCREW,POSSES w Cn
CH Irf Ld Lf)
0 0 0
C/) Z 0
0.092" ANGLE BRACKET (EACH SIDE) 7" SUPERGUTTER 0 1
W/ 4 1OX5/8 INTO BEAM— >- rn
& 4 1OX5/8 EACH SIDE INTO GUTTER LLj r__
C/i
ch 0 ILD
Ld (0 00
ROOF PURLIN TO SIDE WALL CONNECTION GUTTER CONNECTION GIRT TO POST OR PURLIN TO BEAM ATTATCHMENT
14 X 3K4" SMS 16" O/C 0
ACH SI E OF BEAM PURLIN LLJ
2"X 8" X 0.072[_ 2"X 3" X 0,045" ROOF IURLIN (2) #10 X 2" SMS TOESCREWED
2"X 8" X 0.072" ROOF BEAM
ROOF BEAM < Ix 0
Li uj
m 0
< x
0 0 0 1 0 0 L_ w Ljj
1 0 0 0
0 0 0 0 " 0 0
0 0
1 0 0
2"X 3" X 0.045" 0 0 0 0 0 01 1 0 0 0 In V)
0 0 0 C�
ROOF PURLIN 0 0 0 ul 0 0-
C�
0 0 x
0 0 LO
0 x
0 0 C) L0 14)
x 't
0 0 t.0
C*4
0 0
0
0
0 - - -
!10 0 Z. -
0 .125" GUSSET PLATE x LIJ
0
(12 — 2X3/4" SMS SCREWS 04 Z
2"X 6" X 0.050" 4IN EACH SIDE MINIMUM SCREWS EACH SIDE_ U) C)
WALL POST 3EA+0ST #8Xl/2 #IOX1/2 #12Xl/2 V) IN
SIZE I SIZE I Li Ld
ZX4 8 1 5 4 ry
2X6 2X4 10 1 8 6 1 (3) #10 X 2" <
IA 19 in <
lb 1 14 lz
20 1 16 14
20 1 18 16 R RGM Engineering, Inc.
Imam. 1928 River Lagoon'�raee
ROOF TO WALL INTERNAL GUSSET PLATE WIND BRACE DETAIL m 11 ugustine, FL 32092
1 C ) 814-7633
1 HEARBY CERTIFY THAT THESE PLANS MEET OR EXCEED THE REQUIREMENTS OF THE
2010 I'L BUILDING CODE, CHAPTER 20 ASM35 AND THE 2005 ADM PART 1 —A & 11 ASCE 7-10. f rb . orgea,Jr.,PSFE A L
MIN
4ft
G)
5. W.
Co.-
OLD
ti I il"-, - ,.�
ra 1 �.s
c.0 0
, , '. ", -.i.: ;, 1:1.
E
0=3
Eli Pf
>
(G.E-2
.2-,:-g i; _�L Mtn
C'* t
C-3 r
Wc co
REWAIAVER OF LOT 22
. 1
OP
po
1.50.13 Ct%W.
MOO PLAT
- - 'o j
cz 71 -71, 9.3r to
I!! -k . -
a
W
3r&j as
L 0 T 22
c"21
cl� tb
C.)
C"
lira
Lo
C6 <3
icl_ 5
2 0 Z4
C-.*'O%p o
CL
30-9 35
X&V
WOW Fo" _.z
l'saoOMT
14 r50-90 CoAr,
C-1
Lor te AVON