Loading...
1771 Beach Ave interior reno 2013 j I • TRAGER RESIDENCE I , EXISTING STRUCTURE ABO "� , � RENOVATION �1 A , g , C , First Floor Upgrades I 1 ��� MIN. (2) sruD ovERuw, nrPICAL � � P g A � EA. SIDE A/C Z/60 CUENT I ZZZO� (2) SIMPSON MSTAt 8 STRAP, - - - - - - i�/f �/ Mr. Mitch and Mrs. Beth Trager TYPICAL EA. SIDE INSTALL. --t , 9 ACCORDING TO F- -1 Beach I 1 nue MANUFACT1HtER'S INSTRUCTIONS L � Atla t cBeach, FLe 32233 _ BBE4MSJFAD 4SUE �4 VL I _ _ NAILS IN THREE ROWS 0 6" / ''� ` `� MCHITECr O.C. SPACING - - 2 ,NACIt STUDS BUPPWNG KITCHEN — VIA Concepts,ce — — is LLC LVL BEAM � � I r -� � � 1 � � P II I 1 i 1807 Third Street North IL — - I Jacksonville Beach, FL 32250 �eoo,xu REM / j o MR IXI5TIyG FOYER - FIELD VERIFY DIMENSIONS 3 A-201 ENTERTAINING 3 \ AREA 2 / A-201 A-201 OPPOSITE PI �� SPACE f 2x4 P.T. WD. SILL PATE I - --- RMIRED INTO CONC. am �- - L_m7 I j 4 ELEVATION AT DOOR FRAMING = + TOR. A-201 SCALE: 3/4" = 1'-0" 2 BATHROOM i � I �1��=eNr EXISTING I3aLcoMr �` MEDIA ROOM STRUCTUREJr STRUCTUREMid �' I , A/cy : (2) SIMPSON Alt ANGLE Com• (ONE EACH SIDE) AT EACH (2) SIMPSON A21 ANGLE I (ONE EACH SIDE) AT EACH ! RAFTER s�l..i'.LL• r. 4 � CAULK, TYP. IIS y =� ?� . `� e.s s .- x — - - - - -" "— — � ' — — �' I ,ra � b 12, IF `T l I t� (3) 1 3/4" x 11 1/4" GYP CEILING, - - - - - - - - - - - - I- - - - - - - - FAMILY REFER TO RCP (3) 1 3/4" x 11 1/4" - � 4 �> LVL. BEMIS, FASTENED Wf WRAP BEAM W PLYWOOD 8p NAILS IN 3 ROWS 0 LVL BEAMS, FASTENED W/ ON VERTICAL. SIDES, tx I A-201 TOR. 777- 6 O.C. SPACING CAULK, TYP. 8p NAILS"IN 3 ROWS 0 PAINT GRADE LUMBER ONFOYER 6 O.C. SPACING UNpQ�pE, SAND AND i I I i - f } (2) SIMPSON ACE6 POST (2) SIMPSON AC6 POST PAINT FINISH. e CAP INSTALL ACCORDING CAP: INSTALL ANG GAS I I I I UP AI TO MANUFS INSTRUCTIONS TO MANUF'S INSTRUCTIONS },. . I Al NOM. 6x6 PT WD. POST � i H F BATH O i DESIGN REVISION 7-24-2013 WRAP COLUMN W/ PAINT - - - - - - - - ADDITION OF NEW SHEET D GRAIL Ix LUMBER, SAND I STOR• TO BE INCLUDED IN NO. REVISION/ISSUE DATE PAINT FINISH - PERMIT SET Y I SIMPSON HTT4 TENSION TIE: I �� (2) AT EA. POST, INSTALL - FIRST FLOOR ACCORDING TO MANUF'S NOM. 6x6 PT WD. POST INSTRUCTIONS WRAP COLUMN W/ PAINT FILL CELLS OF EXlsnnNc GRADE ix LUMBER, SAND ' PLAN DESIGN CMU BLOCK FOUNDATION 0 PAINT FINISH WALL W/ CONCRETE $" x $" POURED CONCRETE, SIMPSON HTT4 TENSION TIE: ADJUSTMENTS A (2) #5 REBAR DOWEL INTO (2) AT EA POS?, IStALL ISOLATION JOWL• 1/2" THICK EXISTING CMU BLOCK WALL; ACCORDING TO MANUF S IASPHALTICLATNFELT, 1 2 RECESS FILL CELLS INSTRUCTIONS FILLED WITH URETHANE CAULK _C BASED ON EXIST. BASEBOARD - SEE FINISH AR GARAGECONDITION S 4" THICK CONCRETE SLAB - SCHEDULE 4" THICK CONCRETE SLAB - REFER TO FOUNDATION PLAN FINISHED FLOOR REFER TO FOUNDATION PLAN - - - - - - - - - - - - - - - - - - - - - I EXISTING CONCRETE SLAB _j — PERMIT EXISTING CONCRETE I t'-3" t'-9" � DOCUMENTS FOUNDATION 3'-0" x 3'-0" x 12" C DEEP �� CONCRETE FILL CELLS OF EXISTING 00130225 CMM AS SHOWN 5-OB 3 FOUNDATION W/ (2) #5 CMU BLOCK FOUNDATION PROD. 25 1 REBAR 018" O.C. WALL W/ DWN BY SCALE DATE 5d 3 SECTION AT POST & LVL BEAM 2 SECTION AT POST & LVL BEAM PROPOSED FIRST FLOOR DESIGN ADJUSTMENTS A-201 A-201 SCALE: 3/4" = 1'-0" A-201 SCALE: 3/4" = 1'-0" z " " A-201 SCALE: 1/4" = 1 -0 I