Loading...
Agenda Item 4CAGENDA ITEM # 4C OCTOBER 14, 2013 CITY OF ATLANTIC BEACH CITY COMMISSION MEETING STAFF REPORT AGENDA ITEM: Concrete Repairs for the Public Works /Utilities Department SUBMITTED BY: Rick Carper, P.E., Public Works Director DATE: Sept. 13, 2013 STRATEGIC PLAN LINK: None — annual contract. BACKGROUND: Bid number 1213 -08R was opened on Sept.11, 2013 at 3:00 PM. There were five bidders. Bid award criteria based on the lowest total of items 1 thru 17. Bidders Chase Service Concrete Express DP Contracting D.T. Services Gaulden Construction Total $275.93 $212.25 $169.47 $274.60 $183.38 RECOMMENDATION: Award the contract for Concrete Repairs for the Public Works /Utilities Department to DP Contracting Inc. for one year with a two 1 year renewals starting October 15, 2013. BUDGET: Concrete repair is budgeted as a discrete line item in the Streets, Stormwater, Water and Sewer 3400 accounts. Total funds allocated in current year budget are $74,000. ATTACHMENTS: Bid Tabulation Sheet REVIEWED BY CITY MANAGER: City of Atlantic Beach RE -BID ANNUAL CONTRACT FOR CONCRETE REPAIRS September 11, 2013 BID 1213 -08R 3:00 PM Required Documents Chase Plumbing & Mechanical Services Concrete Xpress Services, Inc DP Contracting, Inc. DT Services, Inc. Gaulden Construction, Inc Submission in Triplicate - All Documents X X X X NO Document Requirements Checklist X X X X X Bid Form X X X X X Insurance Certificate X X X X X References - Three (3) X X X X X Buisness Tax Receipt X X X X X Proof of Experience - Five (5) Years X X X X NO Drug Free Workplace X X X X X Public Entity Crimes Statement X X X X X Completed W -9 Form X X X X X New Vendor Information Form X X X X On file with City Documentation of any Addenda N/A N/A N/A N/A N/A Grand Total for all Tear Out, Removal, Pour and Finish - Amounts of Items 1 -17 of Bid Form, as Item per the Award Criteria noted in Section II, 5 of Bid Specifications $275.93 $212.25 $169.47 ti <St if, ' 3 1 ` x { 1 $183.38 ***UPON VERIFICATION OF BIDS, THE FOLLOWING ERRORS WERE FOUND: Sfi t i 4T"J`t ` 1 Oil EMS 1 2955.60. �.d>��� u�.t.�.,..�. ��..,�,���� .. a a, �.. GAULDEN CONSTRUCTION - ACTUAL TOTAL FOR ITEMS 1 -17 IS $196.63. WRITTEN TOTAL FROM SUBMITTED BIS WAS $183.38 FOR A DIFFERENCE OF $13.25 (TOTAL OF ITEMS 1 -16) Award of Bid based on Department Analysis and City Commission Approval