Agenda Item 8DAGENDA ITEM # 8D OCTOBER 14, 2013 CITY OF ATLANTIC BEACH CITY COMMISSION MEETING STAFF REPORT AGENDA ITEM: Professional Engineering Services for Power Systems and Arc Flash Studies for Water Treatment Plant Nos. 1 — 4, RFP #13 -03 SUBMITTED BY: Donna Kaluzniak, CEP, Utility Director DATE: September 5, 2013 STRATEGIC PLAN LINK: None BACKGROUND: New National Fire Protection Agency (NFPA) and Occupational Safety & Health Administration (OSHA) rules require employers to protect workers from injuries and fatalities due to arc flash hazards. An arc flash happens when electrical arcs create an explosion that can vaporize metals, plastics and flesh. Most electrical injuries are caused by arc flash rather than shock. An arc flash can be caused by many things, including corrosion, condensation, even dropping tools and creating a spark. An arc flash hazard analysis per NFPA standards must be conducted on all of the large electrical equipment in order to determine approach boundaries for both qualified and non - qualified personnel, and recommended personal protective gear at specific distances. The analysis includes a short circuit study, fault current analysis, preparation of up -to -date single line diagrams and computer modeling of the electrical equipment. Labeling of equipment and staff training will be provided as well. A Request for Proposals was advertised and invitations sent for the project. Eight firms provided proposals. The review team evaluated the proposals for Staff Competence and Availability; Past Similar Project Experience; References; Project Approach; Current Workload; Financial Responsibility and Insurance; and Proximity. After staff evaluation, the top three firms were ranked in the following order: 1St — J. Collins Engineering Associates, LLC 2nd — Martin Technical 3rd — Current Solutions Professional Engineering J. Collins Engineering Associates, LLC was the top - ranked firm for several reasons. They were ranked at the top in all three major grading criteria (project team, past similar experience and project approach). Their Project Team includes engineers who have much experience in performing arc flash studies specifically for water and wastewater treatment facilities, providing multiple examples of recent project experience similar to this project. Also, their submittal was the only local firm with industrial water /wastewater arc flash study experience. BUDGET: A total of $60,000 was included in the FY14 budget request. 1 AGENDA ITEM # 8D OCTOBER 14, 2013 RECOMMENDATION: Authorize staff to begin negotiations with the top ranked firm, J. Collins Engineering Associates, LLC for completing the Professional Engineering Services for Power Systems and Arc Flash Studies for Water Treatment Plant Nos. 1 — 4, RFP #13 -03. ATTACHMENTS: 1. Evaluation of Proposals Rating Sheet (Proposals are on file in the City Clerk's office) REVIEWED BY CITY MANAGER: 2 EVALUATION OF PROPOSALS FOR PROFESSIONAL ENGINEERING SERVICES FOR POWER SYSTEMS AND ARC FLASH STUDIES FOR WATER TREATMENT PLANTS NOS. 1-4 RFP #13-03 RFP's REVIEWED AND EVALUATED BY DONNA KALUZNIAK, RICK CARPER AND PATTY DRAKE Firm Staff Competence and Availability Past Similar Project Experience References Project Approach Current Workload Financial Responsibility and insurance Proximity SCORE/ RANK (average of 3 reviewers) [25%1 [25%] [10%1 )25%] (5%1 [5%J [5%J J. Collins Engineering Associates, LLC 24.17 24.17 10.00 25.00 5.00 4.84 5.00 98.18 / st Current Solutions Professional Engineering 21.67 23.34 10.00 21.67 2.00 1.50 .34 80.52 3rd Leedy Electric East 19,17 15.00 10.00 20.84 2.84 5.40 2.50 75.35 6th Lewellyn Technology, LLC 17.50 20.84 10.00 21.67 .34 4.50 1.17 76.02 5th Martin Technical 20.00 20,84 10.00 22.50 3.84 4.50 1.50 83.18 2nd nne pharrnaplan 5 4.17 1 1.00 6.67 0.00 0.00 1.84 19.52 Bth Schneider Electric Engineering Services 15.00 1867 4.67 19.17 0.00 1.67 3.34 60.52 7th TLC Engineering for Architecture 20.00 14.17 6.67 20.00 4A7 10.00 4.17 79.18 4th CI OZ. -171 IJ80.1.30 08 # 1I VCINJDV