Loading...
Agenda 11-18-2013 WorkshopAgenda Process and Format of workshop, Woods This discussion is not to design a police building but to discuss the main topics to be included in an RFP for the renovation of our facility. Request For Proposals Discussion RFP and Consultant Selection Process, City Manager Broad Scope Topics for RFP Based on Sample RFP for Commission Discussion Design Build vs Design with Architect oversight Location – Existing Site Account for Flood Plain Issues Future Expansion Budget – set limit Include Temporary Relocation Costs Other Logistical Costs Policing Style Community Oriented Policing Policies Sally Ports & Holding Cells vs None Other Space Needs Assessment Review Existing Facility Review Existing Workload and Demands Analysis of Future Needs Space Planning Determine Design Team Determine Maximum Size or let budget determine Building Structure Compatible with Existing Complementary to and in accordance with Community Design Guidelines Design Requirements Multiple Design Concepts to Choose From Cost Estimates Project Schedule Project Approach Require a narrative of methodology, schedule and approach Consensus of Commission on the next step. Adjourn