Application Number . . . . . 14-00000176 Date 2/10/14
Property Address . . . . . . 2050 BEACH AVE
Application type description DEV REV SGL & 2 FAM. USES
Property Zoning . . . . . . . RES GEN MF DISTRICT
Application valuation . . . . 0
-------------------------------------------
Application desc
SITE DEVELOPMENT PERMIT
-------------------------------------------------------------
Owner Contractor
------------------------
L AB LLC ELITE BUILDING CONTRACTORS INC
CDL
ATH ST 55 FORRESTAL CIR
ATLANTIC BEACH FL 322335934 ATLANTIC BEACH FL 32233
43-4928 (904) 247-5561
---------------------------------------------------- -----------------------
Permit . . . . . . DEV REV LANDSCAPE PLAN
Additional desc . . SITE DEVELOPMENT PERMIT 00
Permit Fee . . . . . 00 Plan Check Fee
Issue Date . . . . 2/10/14 Valuation . . . . 0
Expiration Date . . 2/10/14
---------------------
----------
Other Fees . . . . . . . . . DEV REVIEW-LANDSCAPE PLAN 100 . 00
----------------------------------------------------------------------------
Fee summary Charged Paid Credited Due
--------- ---------- ---------- -
Permit Fee Total . 00 . 00 . 00 . 00
Plan Check Total . 00 . 00 . 00 . 00
Other Fee Total 100 . 00 100 . 00 . 00 . 00
Grand Total 100 . 00 100 . 00 . 00 . 00
PERMIT IS APPROVED ONLY IN ACCORDANCE WITH ALL CITY OF ATLANTIC BEACH ORDINANCES AND THE FLORIDA
BUILDING CODES.
Walker, Jennifer
From: Chris Lambertson [chris@elitehomesfl.com]
Sent: Friday, February 07, 2014 4:24 PM
To: Walker, Jennifer
Subject: FW: Cottages of Atlantic Beach Drainage Plan
Jenny,
Does this mean I can come in and pick up a permit?
Chris
From: Carper, Rick [mailto:rcarper@coah =]
Sent: Friday, February 07, 2014 2:20 PM
To: Chris Lambertson
Subject: RE: Cottages of Atlantic Beach Drainage Plan
Chris, Site Development permit approved by PW.
Rick
Ricky L. Carper, P.E.
Public Works Director/City Engineer
City of Atlantic Beach
1200 Sandpiper Lane
Atlantic Beach, FL 32233
rcarper(d)coab.us
PH: (904) 247-5834
Fax: (904) 247-5843
Florida Public Works-First to Respond, Last to Leave
www.apwaflorida.com
From: Chris Lambertson [mailto:chris@elitehomesfl.com]
Sent: Thursday, February 06, 2014 3:13 PM
To: Carper, Rick
Subject: RE: Cottages of Atlantic Beach Drainage Plan
Rick,
Ok, will submit to building department. Hard time seeing the yard drains as plan is very detailed. I assume the drain that
I was referring to is the one that you see on this plan and it goes to Seminole?
Do you think I will get site development permit soon? My guys are on 51h root raking and would like to then proceed to
Beach Avenue.
Thanks, Chris
From: Carper, Rick [nailto:rcarper@coab.us]
Sent: Thursday, February 06, 2014 2:24 PM
To: Chris Lambertson
Subject: Cottages of Atlantic Beach Drainage Plan
1
Chris, mentioned this the other day, but forgot until your Site Development Permit showed up in my box.
Shows the two yard drains that front 2050 Beach.
For future Site Development permit applications, please submit to Building Department—they have to enter
into computer tracking system and assign permit number.
Rick
RicKy L. Carper, P.E.
Public Works Director/City Engineer
City of Atlantic Beach
1200 Sandpiper Lane
Atlantic Beach, FL 32233
rcarper(a)coab.us
PH: (904) 247-5834
Fax: (904) 247-5843
Florida Public Works-First to Respond, Lost to Leave
www.apwaflorida.com
2
" CIN OF ATLANTIC BEACH
' 800 Seminole Road 904-247-5800
��rrli3l�.
iAtlantic Beach,Florida 32233-5445 Fax 904-247-5845
SITE DEVELOPMENT PERMIT (for filling, grading or topographically altering land)
PLEASE SUBMIT`(2)COMPLETE SETS OF PLANS WITH APPLICATION.
Date 0 I t t PERMIT#
�DG n `� ISSUED BY THE CITY
Job Address J /T�'
Permitee: E`r+P_ S T-Ivr-- Telephone# i(Oy- 3
Permittee Address: 355 J`I S'I'C'e�r, ��`'�� &," t' L
-z-z3 3
Email Address a,r m) LI,{P_1,oAue5- Fax Number.
Requesting Permission to commence site development involving the following activity
1x-,i �Lt, 1 q S .�e�t cQe cQ
Location: (Reference to Cross-Street)
The following permits have been submitted _ Tree Removal ✓j' Demolition
THIS APPLI=1=NCLU?�SLL INFORMATION REQUIRED BY THE CITY'S SITE DEVELOPMENT PERMIT
CHECKLIST (Must be signed by Applicant)
1. Applicant declares that prior to filing this application he has ascertained the location of all existing
utilities, both aerial and underground and the accurate locations are shown on the sketches.
2. Any work proposed in City rights of way or easements shall be subject of a separate Right of Way and
Easement Permit Application
3. All work shall meet City of Atlantic Beach, City of Jacksonville or Florida Department of Transportation
Standards and be performed under the supervision of arl!, (Contractor's
Project Superintendent) located at 3SS itA S+_ Ad'Q.V*c,6c&z4' r-L 3LZpTelephone* 2 -moo z
4. reaisOvli,i d Qf flE',Cf}4"RICK+
;this as,_ `-n
5. All city property shall be restored to its original condition as far as practical, in keeping with city
specifications and the manner satisfactory to the city.
6. This permittee shall commence actual construction in good faith within I45 days. If the beginning
date is more than 60 days from date of permit approval, then permittee must review the permit with the
Director of Public Works to make sure no changes have occurred in the area that would affect the permitted
construction.
7. The Director of Public Works shall be notified twenty-four (24) hours prior to starting work and again
immediately upon completion.
OWNER
Signed: Date:
Before me this day of 'mt in the County of Duval, O^
State Of Florida,has personally appeared -- t s 7a fid' i
Notary Public at Large,State of Florida,County of Duval.
My commissio fires: Personally Known:
Suint Produced Identific
01
MY COMMLQ"t EE 057349
Q� ,e EXPM:May 21,2015
Sorbed ThM Notary Pti&undenwbrs
06 2 1
CITY OF ATLANTIC BEACH FEB 4
r' 800 Seminole Road 904-2 75800
Atlantic Beach, Florida 32233-5445 B ax 904-247-5845
SITE DEVELOPMENT PERMIT (for filling, grading or topographically altering land)
PLEASE SUBMIT(2)COMPLETE
OMPLETE SETS OF PLANS WITH APPLICATION.
1
Date c9 1 s I 1 ` PERMIT#
�DG D 2 ^ n n `� ISSUED BY THE CITY �p
Job Address J �lUX.��G� /-rte-�'
Permitee: I" 5 7:FlvL Telephone#qO`-/- 3
Permittee Address: X55 �� S1'rele�T` i� �r�r-� j `52-233
Email Address �1ri5 �'-�t+P-kc>,"-e5 R, Fax Number: 90L1'aL4 1- 9--?`� 3,
Requesting Permission to Commence site development involving the following activity
%,, C-lcf— 4 1I as ,– . A Q
Location: (Reference to Cross-Street) � k �'t� St ''
The following permits have been submitted _ Tree Removal Demolition_y
THIS APPLICATI INCLU S LL INFORMATION REQUIRED BY THE CITY'S SITE DEVELOPMENT PERMIT
CHECKLIST (Must be signed by Applicant)
1. Applicant declares that prior to filing this application he has ascertained the location of all existing
utilities, both aerial and underground and the accurate locations are shown on the sketches.
2. Any work proposed in City rights of way or easements shall be subject of a separate Right of Way and
Easement Permit Application
3. All work shall meet City of Atlantic Beach, City of Jacksonville orFlorida Department of Transportation
[..G�
Standards and be performed under the supervision of r15 i aMbRr T N (Contractor's
Protect Superintendent) located at 35S its 5r_ A4U bc- 6eaz. I%:, 3zz35Telephone#: 2Lj:�-Zti7-
4, tions showing d : mcreas+.= impervious area on owner's iotan4) J gr in the city Right of VVav are to
be inc, ; with this.anr,)l_ '
5. All city property shall be restored to its original condition as far as practical, in keeping with city
specifications and the manner satisfactory to the city.
6. This permittee shall commence actual construction in good faith within 45 days. If the beginning
date is more than 60 days from date of permit approval, then permittee must review the permit with the
Director of Public Works to make sure no changes have occurred in the area that would affect the permitted
construction.
7. The Director of Public Works shall be notified twenty-four (24) hours prior to starting work and again
immediately upon completion.
OWNER
Signed: __-` Date: 2.161K
Before me this day of in the County of Duval,
State Of Florida,has personally appeared &"-so r t Td � v^
Notary Public at Large,State of Florida,County of Duval.
My commissio fres: Personal) Known:
Su/1 G Produced Identiric
� pEgOFlpNAMpNDANMRE
I MY OOWASSION#EE 057349
FJ(PIRES:May 21,2015
h Bonded Thru NdM Pok UwW"wWs
City of Atlantic Beach
Site Development Permit Checklist
Provide 2 sets of Site Plans including Site Management, Erosion Control and Stormwater
Plans. (for filling, grading, excavating or topographically altering land)
❑Cover Page:
® Address of project
• Printed name, contact info,date and signature of person responsible for the plans. R?
❑ Site Plan (Legal Survey):
® Driveways, walkways, patios...
® Impervious Surface Area (lot coverage)calculations—tabulation of all impervious areas required
• Including location of all easements on property. n
• All existing and proposed structures 5" '`t.(S
. Any jurisdictional wetlands or coastal construction control line, water bodies, any required buffers or significant
environmental features.
❑ Erosion&Sediment Control Plans(Can be included on Site Plan/Survey):
Silt fence location, construction detail and maintenance plan
Installation must be inspected and ar poDved by Public 'Norks before any site work is started. Site Operator
or Construction Supervisor must be present for initial inspection. �
O Inlet protection (if existing storm water inlets are adjacent to property
❑ Construction Site Management Plan (Cate included on Site Plan/Survey):
• Location of any proposed demolition
• Onsite&offsite parking for construction workers
Location of temporary fencing with height and screening indicated
Location of(Atl. Beach franchise approved)dumpster Location of construction trailer&chemical toilet.,
COAB Code of Ordinances—Sec.6-18
p/free removal permit
• An approved site development permit is required if land is being filled and/or re-graded prior to the issuance of a
Tree removal permit.
Ed/ Demolition permit
An approved site development permit is required if land is being filled and/or re-graded prior to the issuance of a
Tree removal permit f/c z
❑/brainage plan
On-site water storage calculations (required if increasing lot impervious surface coverage by 400 SF or more)
Plan for providing required storage.
(Contact Public Works for information on On-Site Storage requirements for added impervious surface area).
sI
l
Comp. By: RLC
7 J Date: 1/21/2014
Public Works Department
City of Atlantic Beach
Permit No:
Address: 2050 Beach Avenue
Required Storage Volume
Criteria:
Section 24-66 of the City of Atlantic Beach's Zoning, Subdivsion, and Land Development Regulations
requires that the difference between the pre-and postdevelopment volume of stormwawter runoff be
stored on site. Volume of Runoff is defined as follows:
V= CAR/12
Where: V=Volume of Runoff
C = Coefficient of Runoff
A=Area of lot in square feet
R=25-yr/24-hr rainfall depth(9.3-inches for Atlantic Beach)
Predevelopment Runoff Volume:
Lot Area (A) _
ft2
Runoff Coefficient
Area Lot Area
Description (ft2) (ft 1.00
"C" Md "C"
Impervious 3,473 9,389 1.00 0.37
Pervious 5,916 9,389 0.20 0.13
Runoff Coefficient(C)= 0.50
Runoff Volume 12
V= 0.50 x 9,389 x 9.3
V= 3,609 ft3
Postdevelopment Runoff Volume:
Lot Area (A) _ `'
Runoff Coefficient
Area Lot Area
2
Description (ft ) l "C"
) Wtd"C"
Impervious 4,694 9,389 1.00 0.50
Pervious 4,695 9,389 0.20 0.10
Runoff Coefficient(C)= 0.60
Runoff Volume12
V= 0.60 x x 9.3 /
V= 4,366 ft
Required Storage Volume
DV= Postdevelopment Runoff Volume- Predevelopment Runoff Volume
DV= 4,366 -
DV= 757 ft
Retention-310w-pool beachavenueonsiteretention 2/7/2014
)
r, Comp. By: RLC
Date: 1/21/2014
Public Works Department
City of Atlantic Beach
Permit No:
Address: 2050 Beach Avenue
Provided Storage:
Elevation Area Storage
(ft) (ft ) (ft)
15.7 320 E0 BOTTOM Average 3" Depression +/-
16.0 320 TOB
Elevation d Storage
(ft) (ft2) (ft 3)
0 BOTTOM
0 TOB
Elevation Area Storage
(ft) (ft) (ft3)
BOTTOM
0 ; TOB
Inground storage=A*d*pf
A=Area= 320.0
d= depth to ESHWT= 8.0
pf= pore factor= 0.3
Inground Storage= 768.0 ft3
Required Treatment Volume= 757 ft3
Supplied Treatment Volume= 864 ft3
Retention-310w-pool beachavenueonsiteretention 2/7/2014