Loading...
2050 Beach Ave 2014 site (tree) clearing S-,rU1jf 11 SS\ CITY OF ATLANTIC BEACH 800 SEMINOLE ROAD ATLANTIC BEACH,FL 32233 INSPECTION PHONE LINE 247-5814 Application Number . . . . . 14-00000176 Date 2/10/14 Property Address . . . . . . 2050 BEACH AVE Application type description DEV REV SGL & 2 FAM. USES Property Zoning . . . . . . . RES GEN MF DISTRICT Application valuation . . . . 0 ------------------------------------------- Application desc SITE DEVELOPMENT PERMIT ------------------------------------------------------------- Owner Contractor ------------------------ L AB LLC ELITE BUILDING CONTRACTORS INC CDL ATH ST 55 FORRESTAL CIR ATLANTIC BEACH FL 322335934 ATLANTIC BEACH FL 32233 43-4928 (904) 247-5561 ---------------------------------------------------- ----------------------- Permit . . . . . . DEV REV LANDSCAPE PLAN Additional desc . . SITE DEVELOPMENT PERMIT 00 Permit Fee . . . . . 00 Plan Check Fee Issue Date . . . . 2/10/14 Valuation . . . . 0 Expiration Date . . 2/10/14 --------------------- ---------- Other Fees . . . . . . . . . DEV REVIEW-LANDSCAPE PLAN 100 . 00 ---------------------------------------------------------------------------- Fee summary Charged Paid Credited Due --------- ---------- ---------- - Permit Fee Total . 00 . 00 . 00 . 00 Plan Check Total . 00 . 00 . 00 . 00 Other Fee Total 100 . 00 100 . 00 . 00 . 00 Grand Total 100 . 00 100 . 00 . 00 . 00 PERMIT IS APPROVED ONLY IN ACCORDANCE WITH ALL CITY OF ATLANTIC BEACH ORDINANCES AND THE FLORIDA BUILDING CODES. Walker, Jennifer From: Chris Lambertson [chris@elitehomesfl.com] Sent: Friday, February 07, 2014 4:24 PM To: Walker, Jennifer Subject: FW: Cottages of Atlantic Beach Drainage Plan Jenny, Does this mean I can come in and pick up a permit? Chris From: Carper, Rick [mailto:rcarper@coah =] Sent: Friday, February 07, 2014 2:20 PM To: Chris Lambertson Subject: RE: Cottages of Atlantic Beach Drainage Plan Chris, Site Development permit approved by PW. Rick Ricky L. Carper, P.E. Public Works Director/City Engineer City of Atlantic Beach 1200 Sandpiper Lane Atlantic Beach, FL 32233 rcarper(d)coab.us PH: (904) 247-5834 Fax: (904) 247-5843 Florida Public Works-First to Respond, Last to Leave www.apwaflorida.com From: Chris Lambertson [mailto:chris@elitehomesfl.com] Sent: Thursday, February 06, 2014 3:13 PM To: Carper, Rick Subject: RE: Cottages of Atlantic Beach Drainage Plan Rick, Ok, will submit to building department. Hard time seeing the yard drains as plan is very detailed. I assume the drain that I was referring to is the one that you see on this plan and it goes to Seminole? Do you think I will get site development permit soon? My guys are on 51h root raking and would like to then proceed to Beach Avenue. Thanks, Chris From: Carper, Rick [nailto:rcarper@coab.us] Sent: Thursday, February 06, 2014 2:24 PM To: Chris Lambertson Subject: Cottages of Atlantic Beach Drainage Plan 1 Chris, mentioned this the other day, but forgot until your Site Development Permit showed up in my box. Shows the two yard drains that front 2050 Beach. For future Site Development permit applications, please submit to Building Department—they have to enter into computer tracking system and assign permit number. Rick RicKy L. Carper, P.E. Public Works Director/City Engineer City of Atlantic Beach 1200 Sandpiper Lane Atlantic Beach, FL 32233 rcarper(a)coab.us PH: (904) 247-5834 Fax: (904) 247-5843 Florida Public Works-First to Respond, Lost to Leave www.apwaflorida.com 2 " CIN OF ATLANTIC BEACH ' 800 Seminole Road 904-247-5800 ��rrli3l�. iAtlantic Beach,Florida 32233-5445 Fax 904-247-5845 SITE DEVELOPMENT PERMIT (for filling, grading or topographically altering land) PLEASE SUBMIT`(2)COMPLETE SETS OF PLANS WITH APPLICATION. Date 0 I t t PERMIT# �DG n `� ISSUED BY THE CITY Job Address J /T�' Permitee: E`r+P_ S T-Ivr-- Telephone# i(Oy- 3 Permittee Address: 355 J`I S'I'C'e�r, ��`'�� &," t' L -z-z3 3 Email Address a,r m) LI,{P_1,oAue5- Fax Number. Requesting Permission to commence site development involving the following activity 1x-,i �Lt, 1 q S .�e�t cQe cQ Location: (Reference to Cross-Street) The following permits have been submitted _ Tree Removal ✓j' Demolition THIS APPLI=1=NCLU?�SLL INFORMATION REQUIRED BY THE CITY'S SITE DEVELOPMENT PERMIT CHECKLIST (Must be signed by Applicant) 1. Applicant declares that prior to filing this application he has ascertained the location of all existing utilities, both aerial and underground and the accurate locations are shown on the sketches. 2. Any work proposed in City rights of way or easements shall be subject of a separate Right of Way and Easement Permit Application 3. All work shall meet City of Atlantic Beach, City of Jacksonville or Florida Department of Transportation Standards and be performed under the supervision of arl!, (Contractor's Project Superintendent) located at 3SS itA S+_ Ad'Q.V*c,6c&z4' r-L 3LZpTelephone* 2 -moo z 4. reaisOvli,i d Qf flE',Cf}4"RICK+ ;this as,_ `-n 5. All city property shall be restored to its original condition as far as practical, in keeping with city specifications and the manner satisfactory to the city. 6. This permittee shall commence actual construction in good faith within I45 days. If the beginning date is more than 60 days from date of permit approval, then permittee must review the permit with the Director of Public Works to make sure no changes have occurred in the area that would affect the permitted construction. 7. The Director of Public Works shall be notified twenty-four (24) hours prior to starting work and again immediately upon completion. OWNER Signed: Date: Before me this day of 'mt in the County of Duval, O^ State Of Florida,has personally appeared -- t s 7a fid' i Notary Public at Large,State of Florida,County of Duval. My commissio fires: Personally Known: Suint Produced Identific 01 MY COMMLQ"t EE 057349 Q� ,e EXPM:May 21,2015 Sorbed ThM Notary Pti&undenwbrs 06 2 1 CITY OF ATLANTIC BEACH FEB 4 r' 800 Seminole Road 904-2 75800 Atlantic Beach, Florida 32233-5445 B ax 904-247-5845 SITE DEVELOPMENT PERMIT (for filling, grading or topographically altering land) PLEASE SUBMIT(2)COMPLETE OMPLETE SETS OF PLANS WITH APPLICATION. 1 Date c9 1 s I 1 ` PERMIT# �DG D 2 ^ n n `� ISSUED BY THE CITY �p Job Address J �lUX.��G� /-rte-�' Permitee: I" 5 7:FlvL Telephone#qO`-/- 3 Permittee Address: X55 �� S1'rele�T` i� �r�r-� j `52-233 Email Address �1ri5 �'-�t+P-kc>,"-e5 R, Fax Number: 90L1'aL4 1- 9--?`� 3, Requesting Permission to Commence site development involving the following activity %,, C-lcf— 4 1I as ,– . A Q Location: (Reference to Cross-Street) � k �'t� St '' The following permits have been submitted _ Tree Removal Demolition_y THIS APPLICATI INCLU S LL INFORMATION REQUIRED BY THE CITY'S SITE DEVELOPMENT PERMIT CHECKLIST (Must be signed by Applicant) 1. Applicant declares that prior to filing this application he has ascertained the location of all existing utilities, both aerial and underground and the accurate locations are shown on the sketches. 2. Any work proposed in City rights of way or easements shall be subject of a separate Right of Way and Easement Permit Application 3. All work shall meet City of Atlantic Beach, City of Jacksonville orFlorida Department of Transportation [..G� Standards and be performed under the supervision of r15 i aMbRr T N (Contractor's Protect Superintendent) located at 35S its 5r_ A4U bc- 6eaz. I%:, 3zz35Telephone#: 2Lj:�-Zti7- 4, tions showing d : mcreas+.= impervious area on owner's iotan4) J gr in the city Right of VVav are to be inc, ; with this.anr,)l_ ' 5. All city property shall be restored to its original condition as far as practical, in keeping with city specifications and the manner satisfactory to the city. 6. This permittee shall commence actual construction in good faith within 45 days. If the beginning date is more than 60 days from date of permit approval, then permittee must review the permit with the Director of Public Works to make sure no changes have occurred in the area that would affect the permitted construction. 7. The Director of Public Works shall be notified twenty-four (24) hours prior to starting work and again immediately upon completion. OWNER Signed: __-` Date: 2.161K Before me this day of in the County of Duval, State Of Florida,has personally appeared &"-so r t Td � v^ Notary Public at Large,State of Florida,County of Duval. My commissio fres: Personal) Known: Su/1 G Produced Identiric � pEgOFlpNAMpNDANMRE I MY OOWASSION#EE 057349 FJ(PIRES:May 21,2015 h Bonded Thru NdM Pok UwW"wWs City of Atlantic Beach Site Development Permit Checklist Provide 2 sets of Site Plans including Site Management, Erosion Control and Stormwater Plans. (for filling, grading, excavating or topographically altering land) ❑Cover Page: ® Address of project • Printed name, contact info,date and signature of person responsible for the plans. R? ❑ Site Plan (Legal Survey): ® Driveways, walkways, patios... ® Impervious Surface Area (lot coverage)calculations—tabulation of all impervious areas required • Including location of all easements on property. n • All existing and proposed structures 5" '`t.(S . Any jurisdictional wetlands or coastal construction control line, water bodies, any required buffers or significant environmental features. ❑ Erosion&Sediment Control Plans(Can be included on Site Plan/Survey): Silt fence location, construction detail and maintenance plan Installation must be inspected and ar poDved by Public 'Norks before any site work is started. Site Operator or Construction Supervisor must be present for initial inspection. � O Inlet protection (if existing storm water inlets are adjacent to property ❑ Construction Site Management Plan (Cate included on Site Plan/Survey): • Location of any proposed demolition • Onsite&offsite parking for construction workers Location of temporary fencing with height and screening indicated Location of(Atl. Beach franchise approved)dumpster Location of construction trailer&chemical toilet., COAB Code of Ordinances—Sec.6-18 p/free removal permit • An approved site development permit is required if land is being filled and/or re-graded prior to the issuance of a Tree removal permit. Ed/ Demolition permit An approved site development permit is required if land is being filled and/or re-graded prior to the issuance of a Tree removal permit f/c z ❑/brainage plan On-site water storage calculations (required if increasing lot impervious surface coverage by 400 SF or more) Plan for providing required storage. (Contact Public Works for information on On-Site Storage requirements for added impervious surface area). sI l Comp. By: RLC 7 J Date: 1/21/2014 Public Works Department City of Atlantic Beach Permit No: Address: 2050 Beach Avenue Required Storage Volume Criteria: Section 24-66 of the City of Atlantic Beach's Zoning, Subdivsion, and Land Development Regulations requires that the difference between the pre-and postdevelopment volume of stormwawter runoff be stored on site. Volume of Runoff is defined as follows: V= CAR/12 Where: V=Volume of Runoff C = Coefficient of Runoff A=Area of lot in square feet R=25-yr/24-hr rainfall depth(9.3-inches for Atlantic Beach) Predevelopment Runoff Volume: Lot Area (A) _ ft2 Runoff Coefficient Area Lot Area Description (ft2) (ft 1.00 "C" Md "C" Impervious 3,473 9,389 1.00 0.37 Pervious 5,916 9,389 0.20 0.13 Runoff Coefficient(C)= 0.50 Runoff Volume 12 V= 0.50 x 9,389 x 9.3 V= 3,609 ft3 Postdevelopment Runoff Volume: Lot Area (A) _ `' Runoff Coefficient Area Lot Area 2 Description (ft ) l "C" ) Wtd"C" Impervious 4,694 9,389 1.00 0.50 Pervious 4,695 9,389 0.20 0.10 Runoff Coefficient(C)= 0.60 Runoff Volume12 V= 0.60 x x 9.3 / V= 4,366 ft Required Storage Volume DV= Postdevelopment Runoff Volume- Predevelopment Runoff Volume DV= 4,366 - DV= 757 ft Retention-310w-pool beachavenueonsiteretention 2/7/2014 ) r, Comp. By: RLC Date: 1/21/2014 Public Works Department City of Atlantic Beach Permit No: Address: 2050 Beach Avenue Provided Storage: Elevation Area Storage (ft) (ft ) (ft) 15.7 320 E0 BOTTOM Average 3" Depression +/- 16.0 320 TOB Elevation d Storage (ft) (ft2) (ft 3) 0 BOTTOM 0 TOB Elevation Area Storage (ft) (ft) (ft3) BOTTOM 0 ; TOB Inground storage=A*d*pf A=Area= 320.0 d= depth to ESHWT= 8.0 pf= pore factor= 0.3 Inground Storage= 768.0 ft3 Required Treatment Volume= 757 ft3 Supplied Treatment Volume= 864 ft3 Retention-310w-pool beachavenueonsiteretention 2/7/2014