52 W 3rd St (vault) s
Brooks, Nancy
From: Doerr, Sonya
Sent: Tuesday, September 01, 2009 8:31 AM
To: Srooks,
,e gmail.com
Cc: Nancy; Graham Shirley
: W.�vd: et
SubjectDale, no proble w u are proposing. We just need the standard construction documents
and permit application when you get to that point. If you haven't already, you might want to get with Rick
Carper in Public Works early-on to address any additional drainage needs.
Sonya
Sonya Doerr,AICP
Planning Director
City of Atlantic Beach
800 Seminole Road
Atlantic Beach,Florida 32233
Phone 904.247.5826 Fax 904.247.5845
www.coab.us sdoerrcD-coab.us
PLEASE NOTE: Florida has a very broad public records law. Your e-mail communications may be subject to public disclosure.
From: Brooks, Nancy
Sent: Tuesday, September 01, 2009 8:15 AM
To: Doerr, Sonya; Graham Shirley
Subject: FW: 52 W. 3rd Street
FYI
From: surfsource@gmail.com [mailto:surfsource@gmail.com] On Behalf Of Dale @ Surf Source
Sent: Monday, August 31, 2009 5:06 PM
To: Brooks, Nancy
Subject: Re: 52 W. 3rd Street
Thanks a bunch Nancy, This proposed expansion will be used for inventory storage and will not increase the
amount of customer or employee traffic to our business. I will go ahead and proceed with gathering the needed
drawings, surveys, etc to apply for a building permit within a few months. Your assistance has been greatly
appreciated.
Regards,
Dale Christenson
On Mon, Aug 31, 2009 at 4:24 PM, Brooks,Nancy <nbrooks(a�coab.us>wrote:
Mr. Christenson,
i
r
08/31/09
From: Dale Christenson
52 W 3id. Street
Atlantic Beach, FL 32233
Dale(a surfsource.net
Attn: Building and Zoning Dept
CC Sonya Doerr
Hello Sonya,
I am c ing you with proposed p a building addition to my commercial
pro rty located at 52 W aid. street, lots 4,5, and 7 (see attached drawing)
The currents ucture�5,000 sq. ft. m building. The addition would include an
extension of 1,500 sq. ft. metal building attached to the East side of the existing building
on lots 5,6,& 7.
Currently lot 4 is vacant except for a partial retention pond used by my commercial
building on lots 1,2,& 3. The balance of lot 4 would be used to accommodate the
addition and the 5 required parking spaces. The spaces will be pervious, ie: mulch,
gravel or grass. (See attached drawing).
The maximum impervious surface area for lots 5,6,& 7 would not exceed 70% for this
addition. There would not be any protected tree removal or additional concrete driveway
added. A 900 sq. ft. slab would be added to the poured footprint of the existing structure
as currently 600 sq. ft. of the 1,500 sq. ft. needed concrete pad is already existing.
Could you please let me know if there are any further requirements needed to continue
with this project before I start the application process?
Regards,
ale Chas enson
� X300
/ Page 2 of 2
CX
' .0U [ G -i
,., LZ )# Mrn
` rn
i �
to c 101
-,
pMOd
° gZ )40'
ic
LZ NOI)GlB
zv � is
vr+.r.� .s s a «e.�"�a K"•osr
pw
V1 '_ - r z
TF�
? t Q .. 3, •_ �E �, (D5L� 26
Olt • • sas 00
7 _
• LOT 5 f$LOC-c 2+
• _ LOT 6 BLf'rK 27
- �• '. _ • TWO STORY METAL tSUILMG LG' rt
S?. S# &. v SACK 26
(n CA cp
'� .. ..
` o = '
m a
m LOT 6 BLOCK 27 O
LOT 7 BLOCK i7
D
C t3Locx i6
v � v
d Q1 ae
2/312004 312004