Loading...
52 W 3rd St (vault) s Brooks, Nancy From: Doerr, Sonya Sent: Tuesday, September 01, 2009 8:31 AM To: Srooks, ,e gmail.com Cc: Nancy; Graham Shirley : W.�vd: et SubjectDale, no proble w u are proposing. We just need the standard construction documents and permit application when you get to that point. If you haven't already, you might want to get with Rick Carper in Public Works early-on to address any additional drainage needs. Sonya Sonya Doerr,AICP Planning Director City of Atlantic Beach 800 Seminole Road Atlantic Beach,Florida 32233 Phone 904.247.5826 Fax 904.247.5845 www.coab.us sdoerrcD-coab.us PLEASE NOTE: Florida has a very broad public records law. Your e-mail communications may be subject to public disclosure. From: Brooks, Nancy Sent: Tuesday, September 01, 2009 8:15 AM To: Doerr, Sonya; Graham Shirley Subject: FW: 52 W. 3rd Street FYI From: surfsource@gmail.com [mailto:surfsource@gmail.com] On Behalf Of Dale @ Surf Source Sent: Monday, August 31, 2009 5:06 PM To: Brooks, Nancy Subject: Re: 52 W. 3rd Street Thanks a bunch Nancy, This proposed expansion will be used for inventory storage and will not increase the amount of customer or employee traffic to our business. I will go ahead and proceed with gathering the needed drawings, surveys, etc to apply for a building permit within a few months. Your assistance has been greatly appreciated. Regards, Dale Christenson On Mon, Aug 31, 2009 at 4:24 PM, Brooks,Nancy <nbrooks(a�coab.us>wrote: Mr. Christenson, i r 08/31/09 From: Dale Christenson 52 W 3id. Street Atlantic Beach, FL 32233 Dale(a surfsource.net Attn: Building and Zoning Dept CC Sonya Doerr Hello Sonya, I am c ing you with proposed p a building addition to my commercial pro rty located at 52 W aid. street, lots 4,5, and 7 (see attached drawing) The currents ucture�5,000 sq. ft. m building. The addition would include an extension of 1,500 sq. ft. metal building attached to the East side of the existing building on lots 5,6,& 7. Currently lot 4 is vacant except for a partial retention pond used by my commercial building on lots 1,2,& 3. The balance of lot 4 would be used to accommodate the addition and the 5 required parking spaces. The spaces will be pervious, ie: mulch, gravel or grass. (See attached drawing). The maximum impervious surface area for lots 5,6,& 7 would not exceed 70% for this addition. There would not be any protected tree removal or additional concrete driveway added. A 900 sq. ft. slab would be added to the poured footprint of the existing structure as currently 600 sq. ft. of the 1,500 sq. ft. needed concrete pad is already existing. Could you please let me know if there are any further requirements needed to continue with this project before I start the application process? Regards, ale Chas enson � X300 / Page 2 of 2 CX ' .0U [ G -i ,., LZ )# Mrn ` rn i � to c 101 -, pMOd ° gZ )40' ic LZ NOI)GlB zv � is vr+.r.� .s s a «e.�"�a K"•osr pw V1 '_ - r z TF� ? t Q .. 3, •_ �E �, (D5L� 26 Olt • • sas 00 7 _ • LOT 5 f$LOC-c 2+ • _ LOT 6 BLf'rK 27 - �• '. _ • TWO STORY METAL tSUILMG LG' rt S?. S# &. v SACK 26 (n CA cp '� .. .. ` o = ' m a m LOT 6 BLOCK 27 O LOT 7 BLOCK i7 D C t3Locx i6 v � v d Q1 ae 2/312004 312004