Agenda Item #8C - Sailfish Dr. Storm Sewer Point RepairAGENDA ITEM:
SUBM ITIED BY:
DATE:
CITY OF ATLANTIC BEACH
CITY COMMISSION MEETING
STAFF REPORT
Sailfish Drive Storm Sewer Point Repair
Rick Carper, P.E ., Public Works Director f2-C
March 17, 2014
STRATEGIC PLAN LINK: None.
AGE NDA ITEM II BC
MAY 12,20 14
BACKGROUND: Following the heavy rainfalls this winter, Staff noted i ndications of road
deterioration along the 400 and 500 Blocks of Sailfish Drive East, apparently caused by
problems with the storm sewer system. This indication was confirmed following
cleaning and televising of the affected pipe section, which documented leakage at both
joints and longitudinal cracks along the entire segment.
To minimize impact to residents of digging up nearly 600 LF of pipe, Staff proposes to
piggyback on an exi sting ln situfo rm stormwater repair bid (City of Melbourne) and have the
affected segment of storm pipe lined using their Cu r ed in Plac e Pipe (CIPP) process . Th e
lnsituform cost estima te for this repair is$ 57,237.46.
BUDGET: There are no funds budgeted for a repair of this magnitude. A transfer of
budgeted funds will be required.
RECOMMENDATION: Staff recommends the Commission authorize the City Manager to
transfer $62,000 from the PW Stormwater Account 470-0000-538-63 -00, Project
Number PW 1407 (Seminole Road Drainage Improvements) to PW Stormwater Account
470-0000-538-34-00, Other Contractual Ser vic es, to allow a 10% contingency on the
proposed repairs
ATIACHMENT: (1) Florida Pipe Tech Report of Television In spection
(2) lnsituform Cost Estimate Summary
.
REV IEWED BY CITY MANAGER: _--?"'?: ___ ._V:._ao:_-_._-_~-~------
l.Treen Cove Springs, Fl32043
Office (904) 284-2141
Fax (904) 284-1938
PIPE INSPECTION LOG
AGENDA ITEM# SC
MAY 12,2014
Client: CITY OF ATLANTIC BEACH
Project: SAILFISH & TRITON PO# 140840
VIDEO DATA
TAPING YES I X I NO c=J
DVD# 1
PIPE DATA
Type: vc
PVC
00
DI
RCP A2000
ERCP LINER
ADS ELIP
CONDITION: WATER ADD
Good B Yes Ed
Fair NO X
Poor
\.f.H. DATA
TYPE: CONDITION
Precast B Good B Brick Fair
Liner Poor
Remarks:
DEFLECTION TEST DATA
TESTING: 5% PASS
YES CJ FAIL L.f
7.50% PASS -NO CTI FAIL L.f
MH# M.H.
G (!)
MHDEPTH: MHDEPTH:
CAMERA TRAVEL FLOW DIRECTION
MEASUREMENT FROM CENTER TO
CENTER OF M.H'S
OPERATOR M'I' ----INSPECTOR MARKLYON
LINE SECTION
Date: 2/10/2014
Ref.# Footage Remarks
1
2 7.5 JOINT
3 15 JOINT
4 23 JOINT
5 32 JOINT
6 39 JOINT
7 48 !JOINT
8 56 JOINT
9 64 JOINT
10 72 [OINT
11 80 GOINT
12 88 JOINT
13 96 JOINT
14 104 fOINT
15 112 JOINT
16 120 !JOINT
17 125 PIN HOLE WITH STAINING AT 10 O'CLOCK
18 128 JOINT
19 137 JOINT
20 142 HAIRLINE CRACK/STAIN. -LEAKING WATER
21 144 JOINT
22 152 JOINT
23 155 PINHOLE WITH STAINING AT 3 O'CLOCK
24 159 IJOINT
25 168 IJOINT
26 176 !JOINT
27 189 IJOINT
28 192 GOINT
2fJ 200 IJOINT
30 208 IJOINT
31 216 IJOINT
32 223 HAIRLINE CRACK-8 -12 O'CLOCK
33 225 ENDOFUNE
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
41}
CONTINUATION LOG SHEETS MAY BE USED
2
lireen Cove Springs, Fl 32043
Office (904) 284-2141
Fax (904) 284-1938
PIPE INSPECTION LOG
AGENDA ITEM# 8C
MAY 12,2014
Client: CITY OF ATLANTIC BEACH
Ptoject: SAILFISH & TRITON PO# 140840
VIDEO DATA
TAPING YES I X I NO
DVD# 1
PIPE DATA
Type: vc
PVC
00
DI
RCP A2000
ERCP LINER
ADS ELIP
CONDITION: WATER ADD
Good § Yes @ Fair NO
Poor
VI.H. DATA
TYPE: CONDITION
Precast § Good B Brick Fair
Liner Poor
Remarks:
DEFLECTION TEST DATA
TESTING: 5% PASS
YES CJ FAIL L.f
7.50% PASS
NO CTI FAIL r---L.f
MH# M.H.
G C)
MHDEPTH: MHDEPTH:
CAMERA TRAVEL FLOW DIRECTION
MEASUREMENT FROM CENTER TO
CENTER OF M.H'S
OPERATOR MT ----INSPECTOR MARKLYON
LINE SECTION
Date: 2/10/2014
Ref.# Footage Remarks
1
2 8 JOINT
3 16 JOINT-LEAKING WATER@ 11 O'CLOCK
4 24 JOINT
5 30 JOINT
6 38 JOINT
7 46 JOINT
8 54 JOINT
9 62 }OINT
10 70 JOINT
11 78 JOINT
12 86 JOINT
13 94 JOINT
14 102 !JOINT
15 110 JOINT
16 118 UOINT
17 126 UOINT LEAKING WATER@ 10 O'CLOCK
18 135 IJOINT
19 143 !JOINT
20 151 IJOINT
21 159 !JOINT
22 167 JOINT
23 175 JOINT
24 183 JOINT
25 191 JOINT LEAKING WATER@ 2 O'CLOCK
26 199 JOINT
27 207 JOINT
28 215 JOINT
2~ 223 JOINT LEAKING WATER@ 11 O'CLOCK
30 229 ENDOFLINE
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
~
CONTINUATION LOG SHEETS MAY BE USED
3
ureen cove ~prings, Fl 32043
Office (904) 284-2141
Fax (904) 284-1938
PIPE INSPECTION LOG
AGENDA ITEM# 8C
MAY 12,2014
Client: CITY OF ATLANTIC BEACH
Project: SAILFISH & TRITON PO# 140840
VIDEO DATA
TAPING YES I X I NO
DVD# 1
PIPE DATA
Type: vc
PVC
00
DI
RCP A2000
ERCP LINER
ADS ELIP
CONDITION: WATER ADD
Good B Yes Ed
Fair NO X
Poor
\1.H. DATA
TYPE: CONDITION
Precast B Good B Brick Fair
Liner Poor
Remarks:
DEFLECTION TEST DATA
TESTING: 5% PASS f----
YES c=J FAIL L.f
7.50% PASS
NO [I] FAIL L.f
MH# M.H.
C) G
MHDEPTH: MHDEPTH:
CAMERA TRAVEL FLOW DIRECTION
MEASUREMENT FROM CENTER TO
CENTER OF M.H'S
OPERATOR MT LINE SECTION 5 ----INSPECTOR MARKLYON Date: 2/10/2014
Ref.# Footage Remarks
1
2 7 OINT PINEHOLE LEAK@ 10 O'CLOCK
3 9 OINT
4 17 JOINT
5 26 OINT
6 36 OINT LEAKING WATER 6-7 O'CLOCK
7 39 ENDOFLINE
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
2f)
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
~
CONTINUATION LOG SHEETS MAY BE USED
ITEM
NO.
PROJECT NAME: City of Melbourne
CIPP Rehabilitation Services
RFP # 10-118-0-2009
Expires: 3-31-15
Project Name: Atlantic Beach Storm Drains
DATE: 3-6-14
DESCRIPTION
CIPP Rehab. Storm Sewer Mains
1511 diameter
6.0 mm normal thickness (.236)
7.5 mm normal thickness (.0295)
9.0 mm normal thickness (.354)
Charge for 1.5mrn increaser per LF
18" diameter
6.0 mm normal thickness (.236)
7.5 mm normal thickness (.0295)
9.0 mm normal thickness (.354)
10.5 mm normal thickness (.413)
Charge for 1 .5rnm increaser per LF
24" diameter
9.0 mm normal thickness (.354)
10.5 mm normal thickness (.413)
12.0 mm normal thickness (.472)
13.5 mm normal thickness (.531)
15.0 mm normal thickness (.591)
Charge for 1.5rnrn increaser per LF
Clean & Inspection -Storm
Light Cleaning and inspection
8" -12" diameter
14" -18" diameter
20"-24" diameter
Traffic Control -City Right of Way
Flagman
Arrow Board
Barricades
Lane Dividers
Mobilization
UNIT
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
setup
setup
setup
setup
lump sum
CONTRACT VALUE
UNIT
PRICE QTY
$63.24
$66.30
$69.36 39
$1.53
$65.28
$75.48
$79.56
$87.72 227
$3.06 1
$100.98
$107.10
$112.20 0
$117.30 233
$125.46
$3.26
$2.14
$3.26 266
$5.10 233
$306.00 4
$183.60 0
$255.00 3
$15.30
$2,550.00 1
0:\Public Works\Projects\Point Repairs\lnsituform Stm Cost Sheet FY 2014_Sailfish.xls
AGENDA ITEM# 8C
MAY 12,2014
$57,237.46
TOTAL
AMOUNT
$0.00
$0.00
$2,705.04
$0.00
$0.00
$0.00
$0.00
$19,912.44
$694.62
$0.00
$0.00
$0.00
$27,330.90
$0.00
$0.00
$0.00
$867.16
$1,188.30
$1,224.00
$0.00
$765.00
$0.00
$2,550.00
57,237.46