89 Nicole Ln 2014 foundation repair (2) I ,y -N- N rRETE 6.5 {,1 i r w. r � h P4 Work Scope: - - - - - - - - - - - - - - - - - - - -I i FlUkTFORM r, Install four(4) Std 2 Pc. Std Bracket 2.875 min. dia. I P3 PIER I a J I Atlas Resistance Piers (P1—P4) Two Story CMU & Wood Frame w/ Stucco Wall Pin Design Notes: Fieri i %ZiI ( 65/ Estimated Wall Line Load = 2.0 klf 2.PIECE ME PIlam`PIP FOOTING PIE t Pin Pile Spacing = 6.5 feet (typ) EM rA�g �;� Pin Working Load=2 klfx 6.5ft = 13 kip SYS7Be01e 11171 Req d Pin Installation Load=2x13 kips=26 kips, or struct. lift. I (P2 Estimated Pier Depth below footing = 21 ft. AP-2—UFB-2875 LINDER FOOTING BRACKET I I 6,5' CATALOG NO: PS 1034 [P] OR PSA1055 [G] Manufacturer's Rated Allowable Working Loads Atlas Std. 2 Piece Bracket 2.875" Resistance Pier=30 kips )NCRETE ,;•: =00TING� PIER Other Notes: v BRACKET O -y .,. t: Piers may be moved to avoid underground conflicts. - � , ,SP1 0 Piers are treated to prevent corrosion. FILE COP "' I � r �aTFORM PIER Piers installation records will be kept by the Contractor. I EXTENSION - O isd8 r s Attempt will be made to lift the settled exterior wall. Void grouting beneath footer will be performed. - 1 INTERNAL k:+ ry . IIJ—iV COUPLER �-yTYY �s SEE t3EINHT`�E ii ADDITIONAL PIER QUff FAffiN f T11D C01" i '101.;.15 STARTER f FRICTION DOM-('�r� REDUCTION REVWYY _ COLLAR —NOTES— TYPICAL OTES—TYPICAL INSTALLATION 1. BRAC ET FINISH AVAILABLE IN PLAIN [P] OR HOT DIP GALVANIZED [G] PER ASTM A153—(LATEST REVISION). � `,`,MCMgH����� a attest has been Building Code usinin gest standard 2. BRACKET MATERIAL J" THICK HOT ROLLED STEEL PER �� C,••,, q ASTM A572 MIN. YEILD STRENGTH 50 KSI. � ,•°�(,E!�/g' .� �i� engineering practices. The repair plan has been prepared using � FOUNDATION SYSTEMS, INC. 3. ALL WELDING TO BE DONE BY WELDERS CERTIFIED UNDER SECTION F ,•,v ,.� the best available soils information and our experience on similar { <b•� •,� i projects in the area. The pier design is based upon a working 5 OF THE AWS CODE D1.1. No 42677 : stress methodology using estimated structural loads. The pier 4. MAN FACTURER TO HAVE IN EFFECT INDUSTRY RECOGNIZED o *; * system and its various components have been rated by the WRITTEN QUALITY CONTROL FOR ALL MATERIALS AND MANUFACTURING * = Manufacture to safely carry the anticipated loads necessary to Atlantic Beach, Florida PROCESSES. =-p: (' � &-to-q. z support the affected portion of this structure. FOUNDATION REPAIR PLAN 5. TWO /8 DIA PIER PINS (PART# PSA1030) CONFORMING TO ASTM :9 STATE OF : 441 $9 Nicole Lane A29 GRADE 1OB21 ARE REQUIRED FOR EACH PIER. ' 6. LIFT SHIMS PART# PSA1031 OR PSA1032 SHALL BE USED AS *'�� •• Atlantic Beach, Florida REQUIRE UP TO A MAXIMUM HEIGHT OF 4 INCHES. ���i sS/ ��� 7. REFER TO DRAWING SA1002 FOR TOP PIER PLATFORMS. ����°NA,-`.%% Bill C. McMahan Jr,VP.E. DRAWN: BCM DATE: 6/1$/14 SCALE: 8. REFER TO DRAWING SA1003 FOR PIER SECTIONS. "=5' Registered A. 42677 CHECKED: BCM JOB N0: