155 Pine St 2014 siding CITY OF ATLANTIC BEACH
i f 800 SEMINOLE ROAD
ATLANTIC BEACH,FL 32233
INSPECTION PHONE LINE 247-5814
�c �?
Application Number . . . . . 14-00001042 Date 7/04/14
Property Address . . . . . _ 155 PINE ST
Application type description SIDING PERMIT
Property Zoning . . . . . . TO BE UPDATED
Application valuation . . . 900
---------------------------------------
Application desc
siding
---------------------------------------
Owner Contractor
-----------------
------------------------
MCGUIRE, VINCENT J VANTAGE CONTRACTING, INC.
155 PINE ST 1825-A NORTH THIRD STREET
ATLANTIC BEACH FL 32233 AC SONVIL E BEACH FL 32250
699
-- -------------------------------------------------------------------------
Permit . . . . . . SIDING PERMIT
Additional desc . 27 . 50
Permit Fee 55 . 00 Plan Check Fee .
Issue Date . . . . 7/03/14 Valuation 900
Expiration Date . . 12/30/14
-------------------------------------
Special Notes and Comments
2010 FLORIDA BUILDING CODE, 2008 NATIONAL ELECTRIC CODE
*REPORT ANY UNFORSEEN STRUCTURAL DAMAGE TO THE BUILDING
DEPARTMENT IMMEDIATELY.
Other Fees
STATE DCA SURCHARGE 2 . 00
STATE DBPR SURCHARGE 2 . 00
----------------------------------------------------------------------------
Fee summary Charged
Paid Credited ----Due---
----------------- ---------- ---
----------
Permit Fee Total 55 . 00 55 . 00 . 00 . 00
Plan Check Total 27 . 50 27 . 50 . 00 . 00
Other Fee Total 4 . 00 4 . 00 . 00 . 00
Grand Total 86 . 50 86 . 50 . 00 . 00
PERMIT IS APPROVED ONLY IN ACCORDANCE WITH ALL CITY OF ATLANTIC BEACH ORDINANCES AND THE FLORIDA
BUILDING CODES.
I
PECTIONS REQUIRED FOR PERMITS
To i le work authorized at various points of the construction are required.The following
insl
Initial:
Date: Initial:
Poi Swimming Pool Steel ; !
*W1 *When all swimming pool steel is in place but before any gunite is placed.
Swimming Pool Safety I
Pie ----•--------�Pool- safety
City o, Atlantic Beach Electrical Grounding&Bonding
*** CUSTOMER RECEIPT ***
Un Oper: ATLBDPS Type: OC Drawer: 1 "When the pool and deck steel is in place but before it is covered.
Fol Date: 7103111 01 Receipt no: 65992
Rel Year Number Amount Swimming Pool Final I
*Wi 2014 1042 implete but
bef 155 PINE ST Additional inspections may apply to your project,if your project
ATLANTIC BEACH, FL 32233 contains these elements.
BP BUILDING PERMITS
Roy X85.50
Reinforced Concrete
Rol Tender detail
H _ X100.00 'When farms and reinforcing steel, anchor bolts, sleeves, and inserts, and all
CA CAS
Rol Total H ndered $1100.00 electrical,plumbing,and mechanical work is in place,but before concrete is placed.
`
Totalpayment $85,50 efore any work
W.
is c Change X13.50 Structural Steel
Trans date: 7103.%14 Time: 10:58:01 r—� 'When all structural steel members are in place and all connections are complete,
Ho— J.,�w but before such work is covered or concealed.
Tie-down Framing Connections
Wall Sheathing
Rough Framing
Roof Sheathing(Dry In) Permit Type
Window Installation-Door
'When all framing,windows,sheathing,shear-walls and metal connectors are in � L`J f�
place but before insulation is placed. Js
Insulation Ceiling f s�
Insulation Wall
When insulation is in place but before insulation is covered.
Exterior Lath I O
'When all backing and lathing,interior and exterior,is in place,but before any
plaster is applied or insulation is installed. Per it No.
Drywall Job A s •
"When all wallboard is in place but before joints are taped and finished. �n
Early Power con IF
'When building electrical can be safely energized and all work is substantially
complete. POST THIS CARD WITH PERMITS
Gas Test I I IN FRONT OF BUILDING
'When all gas piping is complete and wallboard is installed but before gas is
attached to any appliance.All outlets must be capped and pipe pressurized at a Building Department Fire Department
minimum of 15 lbs. Phone:904-247-5814 Phone:904-630-4789
Fax:904-247-5845 Fax:904-630-4203
Email:building.dept@coab.us
Final Plumbing
Final Electrical Public Works/Public Utilities
Phone:904-247-5834
Final HVAC Fax:904-247-5843
Final BuildingConstruction Hours per City Code
'When all construction work including electrical,plumbing,and mechanical, 7 am-7 pm Weekdays 9 am-7 pm Weekends
exterior finish grading,required paving,and landscaping are complete and the
building is ready for occupancy but before being occupied.