Loading...
Atlantic Bch - Public Safety Bldg StudyPl a z a S t . COMMISSION CHAMBERS North PUBLIC SAFETY BUILDING MUNICIPAL OFFICES CREEK PARKING PARK ORIENTATION 1 Atlantic Beach Public Safety Building Pl a z a S t . F.D. SERVICE EXISTING AREA P.D. FIRE DEPT. = 4,950 POLICE DEPT. = 5,550 TOTAL = 10,500 15 PARKING SPACES 2 15 PARKING SPACES 5,550 Atlantic Beach Public Safety Building Municipal Offices F.F.E. 9.31 Commission Chamber F.F.E. 9.39 Police / Fire Departments F.F.E. 9.38 Pl a z a S t . 100 YEAR FLOOD ELEVATION 6.7 FT. 500 YEAR FLOOD ELEVATION 8.0 FT. POLICE DEPARTMENT EXISTING FINISH FLOOR ELEVATION (FFE) IS : 1.38 FT. ABOVE 500 YEAR FLOOD ELEVATION 2.68 FT. ABOVE 100 YEAR FLOOD ELEVATION. 6.7 ft. 8.0 ft. FLOODING 3 5,550 Atlantic Beach Public Safety Building Pl a z a S t . . MAINTAIN FRONT SETBACK 20’ SETBACK. 30’ SETBACK. MAINTAIN SERVICE SETBACK. 26’ TO CL. of CREEK SETBACKS 4 5,550 1,527 5,730 Atlantic Beach Public Safety Building 1,527 S.F. 5,550 S.F. 5,730 S.F. EXISTING = 5,550 s.f. NEW = 7,257 s.f. TOTAL = 12,807 s.f. 13 PARKING SPACES SERVICE POTENTIAL ADDITION 1 - STORY 5 1,527 5,730 5,550 13 PARKING SPACES STORM WATER TANK BELOW PARKING LOT Atlantic Beach Public Safety Building EXISTING = 5,550 1st FL. = 5,000 2nd FL. = 3,473 TOTAL = 14,023 POTENTIAL ADDITION 2 STORY 6 5,550 1 STORY 1,527 2 STORY 3,473 PER FL. 6,946 TOTAL Atlantic Beach Public Safety Building FUTURE EXPANSION 7 EXISTING = 5,550 s.f. NEW = 7,257 s.f. FUTURE = 3,020 s.f. TOTAL = 15,827 s.f. 1,527 5,730 FUTURE 3,020 5,550 Atlantic Beach Public Safety Building SITEWORK 1.5 AC. $ 165,000 EXISTING 5,550 X 112 = $ 621,600 NEW 7,257 X 208 = $ 1,509,456 TOTAL = $ 2,296,056 ONE STORY COST MODEL 8 1,527 5,730 5,550 Atlantic Beach Public Safety Building SITEWORK 1.5 AC. $ 165,000 EXISTING 5,550 X 112 = $ 621,600 NEW 1 STORY 1,527 x 208 = $ 317,616 2 STORY 6,946 x 223 = $ 1,548,958 = $ 1,866,574 $ 2,653,174 TWO STORY COST MODEL 9 1 STORY 1,527 2 STORY 3,473 PER FL. 6,946 TOTAL 5,550 Atlantic Beach Public Safety Building PROJECT COST 10 DESIGN BUILD DELIVERY METHORD SOFT COST SITE SURVEY 2,100 SOIL BORINGS 3,500 DESIGN CRITERIA PROFESSIONAL 3.5% 80,362 DESIGN BUILD A/E 5.5% 126,283 HARD COST COST OF CONSTRUCTION 2,296,056 START UP COST FUNITURE, FIXTURES & EQUIPMENT 90,000 TOTAL PROJECT COST 2,598,301 SOFT COST SITE SURVEY 2,100 SOIL BORINGS 3,500 A/E FEES 7.5% 172,204 CM PRE DESIGN FEES 1% 22,961 HARD COSTS COST OF CONSTRUCTION 2,296,056 START UP COST FUNITURE, FIXTURES & EQUIPMENT 90,000 TOTAL PROJECT COST 2,586,821 CONSTRUCTION MANAGEMENT DELIVERY METHORD Atlantic Beach Public Safety Building SCHEDULE APPROVE REPORT & ADVERTISE FOR DCP 1 MONTH HIRE DESIGN CRITERIA PROFESSIONAL 1 MONTH PREPARE DESIGN CRITERIA PACKAGE ( 30% DOCUMENTS ) 3 MONTHS ADVERTISE & SELECT DESIGN BUILD CONTRACTOR 1.5 MONTHS COMPLETE CONSTRUCTION DOCUMENTS ( 100% DOCUMENTS ) 2 MONTHS PERMITTING 1.5 MONTHS 10 MONTHS CONSTRUCTION 10 MONTHS TOTAL 20 MONTHS 11 Atlantic Beach Public Safety Building