Loading...
781 Cavalla EP Letter EARLY POWER AGREEMENT & RELEASE CITY OF ATLANTIC BEACH Electric power is requested now under the conditions and terms of this fully executed Agreement&Release Job Address: Service Tvpe(Circle One): Overhead Underground We,the undersigned General Crntractor and Electrician,understand and agree: 1. "Farly Power" is purely for our construction convenience, it is not required by Codes and does not substitute for Final Inspections or the C/O(Certificate of OccupancyTffiat must be issued before occupancy, and as such is at the discretion )f the Building Official. 2. The City of Atlantic Beach will make a special inspection prior to the early power energizing. All rough inspections must have prior Approval,including meter base connections. 3. Occupancy or use of the new construction before a formal CIO constitutes fraudulent use of the early electric service. Such action is expressly prohibited and penalized by The City of Atlantic Beach Ordinances. A violation of this Agreement shall result in a request for prompt removal of electric service after a twenty-four hour notice. 4. "Early Power'release authority is the Electrician and/or the Contractor and must not occur before: a. Equipment,devices and fixtures are installed(or blanked off)safely. b. Panel is complete with breakers and cover,and(labeling required at final inspection). c. Service connection and grounding is complete. d. The electric system h. :, safely passed through electrical check. e. Meter can is permane: marked with address. f Temporary address i,w,it ers displayed(Permanent numbers are required for CIO). 5. This fully completed form is t- be submitted to the Building Department by hand,mail or fax. G. Future such Agreements w -°ot be accepted from those who violate anyone of the above items. i CONTRACTOR DATE , PRINT NAME _ G_�'''J�J�C✓Z+Cs ELECTRICIAN Y`,%� DATE PRINT NAMEc1f,; C. }ri Seminole Road,Atlantic Beach Ft.32233 Phone:(904)247-5F Fax:(904)247-5845 1�nr,:.':v,��_..���a��.._., revised 01 30 09