Loading...
195 15TH ST COMMENTS PX 195 15th St. 14-sfr-161 1. Architectural plans were revised, per plan review comments, but engineering pages were not revised to match. Please submit revised engineering plans. 2. Plan review terminated. Plan review cannot be done without a complete plan. Engineering and truss engineering were not reviewed. General Notes: Your re-submittal should include two complete sets of plans. Please insert the revised pages into the plan sets, and pages removed from the stamped "Job copy" set, should be marked as "old set" and should be included in the re-submittal. If old "Job copy" drawings, are not resubmitted there will be additional plan review fee charged due to the amount of time necessary to review entire drawing again. ALL ITEMS changed or revised on plans and documents shall be identified by circling, clouding or identified by some other legible method. ADDITIONAL ITEMS MAY BE REQUIRED - DEPENDING ON NEW INFORMATION AND CLARITY OF FINAL PLANS SUBMITTED FOR REVIEW. 3. Second submittal indicates second-floor plate height of 22'-10"; max plate height is 22'-0". Additional loose pages were submitted (third submittal) indicating 21'-10". The third submittal can be approved. Please insert new pages into plans and submit a complete, organized plan set. 4. Door 6 must be clear 29", per FBC-R320. 5. Exterior Decks and balconies. Please submit all details for outside decks and balconies; including decking; slope of deck; flashing at walls, edges, and posts; treatment of fastener penetrations; moisture resistant membrane brand, type, and installation instructions; and final surface. Moisture resistant membrane must be approved for the conditions shown on plans, including slope, walking surface, and/or installed under other deck materials. 6. Metal roof requires a separate permit. 7. Please provide attic ventilation calculations and locations. 8. The 2010 FBC has additional flashing requirements for window flashing. Please review FBC-R703.8 and the new referenced standards AMMA 711, 100, 200, and 250, and provide details on plans that meet the new requirements. Two window flashing details that comply with R703.8 can be found at www.firstcoastchapter.org, under Codes/Standards, window flashing. 9. Please provide details for all exterior lumber, per FBC-R317. 10. Energy Sheets. Please provide complete energy package, including Jurisdiction Number on page 1, Air Barrier and Insulation Inspection Checklist (checked off to acknowledge the requirements) , complete Manuals J, D, and S, and complete and sign EPL Display Card. 11. Florida Product Approval. This location is in Wind Exposure 'D' . Some products that usually qualify in Exposure 'B' will not qualify in this location; that is the case with several products on this project, including garage door. Please review all products and verify that they meet the wind pressures indicated on Engineering pages and revise Florida Product Approval Sheets to show decimal places of Numbers. Product Approval Numbers usually include more than one product. Specific products are identified by the decimal places. 12. Due to incomplete submittal, this not a complete list. Other issues may be discovered in next submittal.