Loading...
899 ATLANTIC BLVD EP LTR EARLY POWER AGREEMENT & RELEASE CITY OF ATLANTIC BEACH Electric power is requested now under the conditions and terms of this fully executed Agreement&Release Job Address: 7'1 c 1 'i' d Permit No. -� "' Service Type(Circle One): Overhead nderground We, the undersigned General Contractor and Electrician, understand and agree: 1. "Early Power" is purely for our construction convenience, it is not required by Codes and does not substitute for Final Inspections or the C/O(Certificate of OccupancyT Tiat must be issued before occupancy, and as such is at the discretion of the Building Official. 2. The City of Atlantic Beach will make a special inspection prior to the early power energizing. All rough inspections must have prior Approval, including meter base connections. 3. Occupancy or use of the new construction before a formal C/O constitutes fraudulent use of the early electric iA violation of this Agreement shprohibited ll Ire ul d nadrequ stifor prompt removal of electric seervice after a twenty-four hour notice. 4. "Early Power" release authority is the Electrician and/or the Contractor and must not occur before: a. Equipment,devices and fixtures are installed(or blanked off)safely. b. Panel is complete with breakers and cover,and(labeling required at final inspection). c. Service connection and grounding is complete. d. The electric system has safely passed through electrical check. e. Meter can is permanently marked with address. f. Temporary address numbers displayed(Permanent numbers are required for C/O). 5. This fully completed form is to be submitted to the Building Department by hand,mail or fax. 6. Future such Agreements will not be accepted from those who violate any one of the above items. CONTRACTOR DATE� ` 2 2 �?-O PRINT NAME a I'Itit JANE l DATE .!? 114 t.u.. .. 00 Seminole Road, Atlantic Beach 1 32233 )~ 7 8 6 Fax (904)247-5845 littp://www.coab.tis revised 01 30 09