385 Mayport Rd JEA POLES CITY OF ATLANTIC BEACH
CONSTRUCTION PERMIT WITHIN CITY RIGHTS OF WAY AND EASEMENTS
= 904-247-5800
800 Seminole Road
Atlantic Beach,Florida 32233-5445 Fax 904-247-5845
PLEASE SUBMIT(3)COMPLETE SETS OF PLANS WITH APPLICATION.
Date /'30-20/S PERMIT#
ISSUED BY THE CITY
Job Address 3RS �.�/�a1i'f QiA�
Permitee: SE,Q Et6�2/c �rST2i8�T/a�✓ Telephone#
Permittee Address: 2/ Ir./ C'11k1'ec00V 511T -_r4e+CS'4A1✓19' Ai. 32Z-02
Requesting Permission to Construct: AE'iCACZ -I-VI 9 wCIC i=bc.ES
Location: (Reference to Cross-Street) 64sT sa-e- AvF' AUVA'Xf lep 'OeR.&t FAPM '7 s L✓
1. Applicant declares that prior to filing this application he has ascertained the location of all existing utilities,
both aerial and underground and the accurate locations are shown on the sketches.
A Letter of Notification was mailed to the following Utilities/Municipalities:-,XO���� Ldlu, /,-dfED,
Jacksonville Electric Authority Yes( ) No ( ) Date:
Bell South Telephone Company Date:
Ferrell Gas Yes( ) No ( ) Date:
Comcast Yes( ) No ( ) Date:
2. Whenever necessary for the construction, repair, improvement, maintenance, safe and efficient operation,
alteration or relocation of all, or any portion of said street or easement as determined by the Director of Public
Works, any or all of said poles, wires, pipes, cables or other facilities and appurtenances authorized
hereunder, shall be immediately removed from said street or easement or reset or relocated hereon as
required by the Director of Public Works, and at the expense of the Permittee unless reimbursement is
authorized.
3. All work shall meet City of Atlantic Beach or Florida Department of Transportation Standards and be
performed under the supervision of 140f' SZ405 ,50 (Contractor's Project
Superintendent)located at ?Ee SSSC ?.5V5 E'MER orwl SI. Telephone#: YWY-GGs-7fyy
4. All materials and equipment shall be subject to inspection by the Director of Public Works or his designee.
5. All city property shall be restored to its original condition as far as practical, in keeping with city specifications
and the manner satisfactory to the city.
6. A sketch of plans covering details of this installation, as well as, a copy of a recent survey shall be made a
part of this permit. Calculations showing any increase in impervious area on owner's lot or in the cid
Right of Way are to be included with this application.
7. This permittee shall commence actual construction In good faith with S days. If the beginning date is
more than 60 days from date of permit approval, then permittee must review the permit with the Director of
Public Works to make sure no changes have occurred in the area that would affect the permitted construction.
8. It is understood and agreed that the rights and privileges herein set out are granted only to the extent of the
City's right, title and interest in the land to be entered upon and used by the holder, and the Holder will, at all
times, assume all risk of and indemnify, defend, and save harmless the City of Atlantic Beach from and
against any and all loss, damage, and cost of expenses arising in any manner of the exercise or attempted
exercises by the holder of the aforesaid rights and privileges.
9. The Director of Public Works shall be notified twenty-four (24) hours prior to starting work and again
immediately upon completion.
OWNER
Signed: Date:
Before me this day of in the County of Duval,
State Of Florida,has personally appeared
Notary Public at Large,State of Florida,County of Duval. Personally Known:
My commission expires:
Produced Identification:
DISTRIBUTION ENGINEERING
Svc MODIFIED_
MWOs 22710786 LO': OH MAP's CENTER
SUB-STA. NEPTUNE CIR. NO. 561 EXIST. JEA UG TREE TRIMMING REO'D N
CUSTOMERS COPY TO UTILITIES
LOCATION OCEANGATE TOWNHOMES - OVERHEAD —
33
0
Q
r� 6e o
8f
i el eis�
ser ti 04 19
01 ti S8i3c 389
x 02 2`801
3 jQ r' .�"4Si3c OS 3�s
�5a x Os 38>
RD W S?' Sac
07 N 3,61l
25 c 82 r 3�s
3
0
s2 14
a� 2g o 09
4a 26s � 2g�
41:
CONSTRUCTION NOTES:
REMOVE FLYING TAP AT 4TH ST AND TRANSFER
too BOTH TAPS TO POLE 400
� N
LOCATION 02: TAP BOTH CUTOUTS TO THE
OVERHEAD 8 PHASE
136 FUTURE OH TEMP SERVICE TO CONSTRUCTION
�o SSC TRAILER TO BE FED FROM LOCATION 10
n ALL OVERHEAD PRIMARY SHOULD BE PULLED
AT REDUCED TENSION.
PHONE NOs 665-6583 DATE REL CONSTs 1.23.15
ENGINEERsBELANGER RADIO NO. AS-BUILT RECEIVED
CONST. COMPLETED BY DATE
oceangate.dgn 1/23/2015 1:10:28 PM