Loading...
355 6th St Revision o 31'-9' 26'-7° S.SEE ALL-HREADTHROTES FOR INSTALLATION m 3'J' 11'-0° SPECIFICATIONS,SPACING AND EMBEDMENT g 20 SPF STUDS AT I6°O.C. _ Zx6 N0.2 SYP PT BOTTOM PLATE.FASTEN I --------------____________________________________________________________ I 2x BAND BELOW WITOM NAILS ATS' H I&d r- -- r----------------- ---- ---------------,,� � D.C. f RA NA V CONENTIOL FRAMING-FLOOR I 7 I 2 j 2X JOISTS WITH LIKE SIZED 2X BAND 57,01 I 2X FLOOR JOISTS.SEE 51.01 I BOARD.314'PLYWOOD DECKING, $ p u y i I I TABLE FOR SIZE AND I MAX FLOOR SPANS WITH 40 PSF LIVE LOAD,10 PSF DEAD LOAD, FASTENED WITH 8d NAILS AT 6'O.C.ON O w I I I SPACING. 2 I AND 1.00 DURATION FACTOR. EDGE,12'O.C.IN FIELD. o w I 51.01 I No.t No.2 I GRADE, BAND BOARD TOE-NAILED TO 2X8 BASE I I I T-04.�8`842. I ' I SYP PLATE WITH 10d NAILS AT 12'O.C. I SPACING 16' 24' 16' 24' 1 I L- -- ' L---------- ------- 1 2%B PT N0.2SAS E PLATE. 2x8 14'-1' 8'-6' iw-5- T-T d J' 8'%i6'CMU STEMWALL.CELLS FILLED � I ---- --- 1 2x8 18.6- 111-3" 171-1' 91-8' WITH 3000psi CONCRETE AND(1)#5 BAR o 1 I 1 (3)2X12 I I I AT48'O.C. p 51.01 61 At I I 1 I 2x10 23'-2' 13'-7' 20'-3' 11'{' I 1 I I—III=III —III=- ONE STORY: d=8',b=76',(2)#4 BARS , 1 I I I 2x12 26'-0' 15'-T 23'-10' 13'-B" = — — — TWO STORY: d=10',b=20',(3)#4 BARS 1 I I I ONE STORY. d=12',b=24',(2)#5 BARS 4 ZXFL00 JOISTS.SEE 2X FLOOR JOISTS.SEE I°' ILII 1 I TABLE FOR SIZE AND TABLE FOR SIZE ANDI— I SPACING SPACING. VERTICAL WALL REINFORCEMENT TO I L -7 1 I I I ,• III= BEND W INTO FOOTING. � FOOTING TO BEAR ON FIRM O —= I ( I I I -III, iI III-I UNDISTURBED SOIL. v Z 1 I L L.L L 51.01 OFF-GRADE SECTION (3)2X12 1 --- I 11- 3/4•=1'-0• Z p W Aa O p w u Q U I st.ot y Q (2)2X12 j I I ' Z m m PAVERS ON COMPACTED FILL- L---- — N g ----- =I —' 8'BOND BEAM WITH(1)#5 CONTINUOUS co Q G a =III= 8'X16'CMU STEMWALL CELLS FILLED O p 51.01 i I III—III- WITH 3000ps1 CONCRETE AND(1)#5 BAR U I "4v AT 48'O.C. 1 X22 L —III= III=III - ONE STORY: d=8',b-16',(2)#4 BARS m TWO STORY: d=10°,b=20',(3)#4 BARS .. �„�� T� `•" �� III • 8 `.•. p .IIIA ONE STORY: d 12'.6=24',(2)#5 BARS VERTICAL WALL REINFORCEMENT TO L'`F: :;,xJ-* BEND 8'INTO FOOTING. 1 III=III _FOOTING TO BEAR ON FIRM33 UNDISTURBED SOILIR D p c7 8 XXX111111 I //A�4'� i -III III—III- 4 ,y% lll••• ' - DOFF-GRADE SECTION EXISTING FOUNDATION 3'46' A r s /fes nr -- -1 . NI WHERE YP DECK ARE, FASTEN TO ' 63 •. STEM WALL WITH(2)ROWS E 12• ' J 1 a 0 I VIII ILII I III WALL AT I2EO.C.STAGGEREDM 7 L I _ FLOOR JOISTS.SEE TABLES FOR I j I �—III— FASTEN JOIST TO LEDGER WITH SIZE AND SPACING.FASTEN TO O LUS28. BEAM WITHLUS28 ' (3)2X12 PT NO.2 SYP FLOOR I BEAM.FASTEN TO CMU WIH 2 ———— 6 �4ECTION (, W520 MAX FIVE COURSES TALL. 7 L I 51.01 j I 8'XB'CMU PIER.FILL CELLS WITH 3000 psi CONCRETE AND#5 I I I LL O VERTICAL BAR .. ...y_ .. I 1 VERTICAL REINFORCEM N I 51.01 E T TO I I I } HAVE 9'BEND AT B(,�7T00 - _ BE EMBEDDED4 IN OT P 6X6 PT N025YP POST. — COURSE I ��' 28 JOISTS AT 16' 8 I I I III III- �' O.0.,TYP ALL $t,pt 2X8 LEDGER.SEE -J I PERIMETER BEAM CONNECTED WITH = } i � FLOOR JOISTS. SECTION FOR DETAILS. I BOLT THROUGH 6X6 POST. - 24"-4 X2 III— — TINDWITH 3),#5_ # I. -------------_ -----------------' --- J L--- -- � 9" =III=III=III=II _BARBEACHWAY Dc8 JOISTS AT 16'O.C.FASTEN EACH END WITH LUS28,ALL HOLES FILLED WITH 10d FOOTING TO BEARD FIRM­f - - - - - - - - - - - - -- - - - - - NAILS. UNDISTURBED$OIL^ FOOTING $j ABU66.USE 7/2-ANCHOR EMBEDDED 6' I E R " AND ALL HOLES FILLED WITH 10d NAILS. _ 12-X12'CMU BLOCK FILLED SOLID WITH 3000PSI GROUT. —III—III F° - 24-X2'X FOOTING WITH(3)#S BARS 3/4'PLYWOOD DECKING,FASTENED 1' �_ 1 = I III—III—III EACH WAY. WITH Bd NAILS AT WO.C.ON EDGE �1 '� m L —J L--J J 1 O$-a� (2)2x8 DECK BEAM I (2)2x8 DECK BEAM L- J (2)2x8 DECK BEAM L-I-J IIIIII-III—III- 12'O.C.IN FIELD. Cry v J L - 2X12 JOISTS AT I6'OC t ll,ilr. -8'-0' FOOTING TO BEAR ON FIRM UNDISTURBED SOIL `-•'� ! I> 'tIFIp•" a: 24'S' J Sts 1 I EX STING WITH A(2)ROWSO 12'j G ✓-"° �fJ( (z] � ��'•• •Zm ECTION SCREWS AT I2'O.C.STAGGEREDI 5 )*. EXISTING BASE PLATE. 1 EXISTING STEM WALL. h� i•4 'I�' •••ALE.•� FOUNDATION PLAN I �;w ,aam F/ LOOR SECTION Sh.t N.. 8'x8'THICKENED EDGE WIH (1)#4 CONTINUOUS I Ij. 12'x12'.12'DEEP FOOTING S1 .01 WITH(2)#5 BARS EACH WAY ) ®. 2 of 4 b d ua o a� CD d o o 0 d CD o Er z . co '1 eo rnn f" cn a Ll`I �i vx h c D C4 CD CD \ 3 � � _ � coo � v°I � •-�.. � � t CD ti /- ID CD CD z c S CD allCD � f