Loading...
Item 4D - Water Model UpdateAGENDA ITEM: SU BMITTED BY: DATE: CITY OF ATLANTIC BEACH CITY COMMISSION MEETING STAFF REPORT Water M~pdate ):,_ft-E'~L- Do ug las E. OJ ton P.E .. Publi c Wo rks Director March 20 . 20 15 ST RATEGI C PLAN LINK: N /A AGENDA I TEM # 40 APRIL 13,201 5 BACKGROUND: The City's wate r d istributi on hyd rau lic mode l was last updated in 20 07. Sin~.:c th at time , sys tem c han ges have occurred, such as co nstru cti o n ofthe At lnntic Bcuc h Co untry Club , a new schoo l o n S tate Ro ad A I A, a nd the plan ned improvements a t th e Ocea ngu tc subdiv isio n. Regular upd ates o f th e hyd ra ul ic mode l s ho uld be made to s imul ate the performance of the system. T his wi ll he lp ident ify prob lem areas in the wate r sys tem and ass is t in pri oriti z ing cn pitul improve ment s. We have prev iou s ly purc hase mode lin g so tl wa rc that will int eg rate wit h th e Cit y's G IS Sys tem . Thi s model wi ll be used by th e consu lt ant under thi s auth ori zatio n to co ns tru ct and ca lib rate the mod e l. Specifi c model run s will be com pl ete d including an ana lys is to help de tcnn im: if water plant 114 (2X4R Mayport Road) should be ph ased ou t o r improved . Aller thi s engi neerin g task the co ns truc ted model will be turned over to the Ci ty so thnt many of the future system ex pan s ion and imp rovements ca n be modeled in-house. Co ll ins Engi neering was selected ror thi s assignmen t because th ey arc fam iliar with our system fi'tH n wo rkin g o n wate r· re lated proj ects an d stud ies fo r the City and ha ve expe ri ence wi th the model ing soH ware. The cos t for the wa ter model development/con struction , speci li e model run s, pressure gra dient map and a suggested cap it al improvement pl an is $35 ,19 1. BUDG ET: $60,000 was budgeted in accoun t number 400 -5502-533-63 00 for wa ter mode li ng and oth e r ut ilit y item s. RECOMM ENDATIONS: Auth orize J. Co lli ns Eng in eeri ng, LLC to co mpl ete the Water System Hydraulic Modelin g in the amo unt or$35, I 9 1 und er th eir co ntinu ing co nt ract w ith the Cit y in accorda nce with their proposa l. ATTACHMENTS: Cos t propo sa l fi·o m Co llins Engi nee rin g dated 3/19/15 REVIEWED BY C ITY MANAGER: :h { 4et<t ~~""~ J. COLL INS fNGJNEERING ASSOCIATES . LLC 1 I 'If/, l ~.1 1 1 '""'' 131 vd l.~rk·.UII\ dk I I '~:22 ~ (111111~112 11'1 (Piilllo l f• 1 lf 11 1~l l)'l llu'llll '111111 March 19, 2015 Donna Kaluzniak Utility Director City of At lantic Beach 902 Assisi Lane Atla ntic Beach, FL 32233 AGEN DA ITEM# 4 0 A PRI L 13,20 15 Re : E ngineering Services for Ci ty of Atla nt ic Beach , FL -Preparation of Potable Water System Hydra ul ic Model Dear Donna: J . Co llin s Engineering Associates, LLC (J CEA) is pleased to provide an engineering fee proposal for the potable water system hydraulic model. The new water system hydraulic model w ill serve th e City in many ways and provide benef its i ncluding: • Analytical t ool to eva luate immediate a nd long t erms potabl e wa ter needs of th e city. • Ide ntify potential problem areas i n th e water system • Identify need f or s hort and lo ng term water capi tal improvement projects • Plan for new development by knowing accurate water pressures and capacity ava il ability throug hout the water system . A scope of work and fee proposal is attached for your consideration . If you have a ny question s, please ca ll me at 716-6282 (Ce ll ). Sincerely, John E . Co llins, Jr., P .E. Cc Kayle Moore, PE WATER SYSTEM HYDRAULIC MODELING SCOPE PROJECT NAME: City of Atlantic Beach -Water System Hydraulic Modeling AGENDA ITEM # 4D APRIL 13,2015 PART 1.0 PROJECT SUMMARY: Prepare a potable water hydraulic model of the entire City of Atlantic Beach (CoAB) service area. The service area includes both the CoAB corporate limits plus the old Buccaneer service area. The hydraulic model will be serve as a tool to analyze the immediate and long terms potable water needs of the city. The model will endeavor to identify problem areas in the water system and identify need for short and long term water capital improvement projects as well as allow City staff to plan for and address new developments or growth in the water system. PART 2.0 PURPOSE OF THE MODEL: The hydraulic model will simulate the hydraulic performance of the water distribution system under both steady-state and extended-period conditions. Specific individual scenarios for analyzing various demand and/or system configurations conditions may be included, such as: -Average day condition -Maximum day condition -Fire flow demand -Various pumps out of service -Various elevated tanks out of service -Various ground storage reservoirs out of service -Combinations of the above PART 3.0 SCOPE OF SERVICES: The scope of services to be performed by J. Collins Engineering Associates, LLC (JCEA) includes: Task 1-Model Development/Construction • CoAB will purchase new hydraulic modeling software,"WaterCAD" (latest version available) as manufactured by Bentley Systems, Inc. JCEA will utilize the City's software and set up the data files. • Historical Document Review-Review current Water Master Plan prepared by CDM in 2001 and revised in 2007 (Water Model Update) and 2009 Water Facilities Plan Update -Well 2R, as well as City historical and maintenance records on the water system (distribution piping, water wells, water treatment, pumping and storage). In addition, previous studies, planning documents or reports (Comprehensive Plan, CUP, Capacity Analysis Reports, etc) that address population growth, development projections, or change in land use shall be provided by CoAB. CoAB will attempt to obtain a copy of the computer model data file from the consultant that prepared the 2007 Water Model Update. • CoAB shall assist JCEA in obtaining the computer model data file from designer of new potable water system for Atlantic Beach County Club for the new water system. This will be verified and included in the new model. • Develop Future Population Projections/Water Demand. City to provide historical water plant and water meter records. Review and update as required based on population projection included in 2014 Water Master Plan Update. • Model Construction: AGENDA ITEM # 4D APRIL 13, 2015 1. JCEA will work with designated city staff to ascertain the type of model to be constructed ("all pipes" vs. "reduced" vs. "skeletonized"). 2. Physical facilities data: a. Pipe and appurtenances -JCEA will utilize information contained in the City's geographic information system (GIS). It will be incumbent upon CoAB to verify the accuracy of the information contained in the various system component databases (i.e. -pipe sizes, lengths, materials, ages, end node locations, etc.). Horizontallocational information will be taken directly from the CoAB GIS. Verticallocational information will be taken from the CoAB GIS if available. Should vertical locational information be incomplete/nonexistent, JCEA will attempt to utilize digital elevation model (DEM) information with assistance as required by CoAB GIS personnel utilizing CoAB GIS software. This proposal does NOT include the purchase of any digital dataset information. b. Pumps & Tanks-JCEA will utilize information obtained from CoAB and from the recently completed Water Master Plan Update. Field verification may be required in case of missing/conflicting information. JCEA will make a reasonable effort to obtain physical information such as make, model number, pump curve, etc., but cannot guarantee that all such information is available. c. Demand data: JCEA will utilize CoAB demand data exclusively. This data will be imported from CoAB water billing data and spatially allocated via the modeling software as "Average Daily" flow values. Obviously incorrect demand data allocations will be corrected. System water loss will be included in the model. Water loss data will be provided by CoAB and will be spatially allocated to demand nodes proportionally. d. Demand Scenario Construction: JCEA will construct various demand scenarios as described in the following paragraphs. JCEA will work with city staff to construct differing scenarios to address potential problem areas within the system. e. Steady-State Simulations -Average Day Flow-this is the "base" scenario. -Maximum Day Flow-typically a multiple of the base scenario, but may be based on actual system historical data. -Peak Hour Flow-typically a multiple of the base scenario, but may be based on actual system historical data. -Fire Flow-typically based on a required minimum flow and pressure impressed at a particular point in the system on top of the Maximum Day Flow. -Seasonal Variations-typically based on historical data documenting system-wide seasonal demand fluctuations. -Other -Other scenarios may be included based on conversations with city staff. f. Extended-Period Simulation (EPS) -EPSs typically attempt to mirror the operation of the system over some defined period of time. EPSs typically require the addition of control schema to turn pumps on and off (or vary their speed if driven by variable speed motors), tank fill valves to open AGENDA ITEM# 4D APRIL 13, 2015 and close, and (possibly) system valves to open and close, in response to demand and/or pressure fluctuations. Demand changes over time can be programmatically accomplished using diurnal curves. JCEA proposes to use the diurnal curve set forth in AWWA M32-"Computer Modeling of Water Distribution Systems", figure 2-12. -Average demand using diurnal curve -Fire flow-average demand with fire flow(s) impressed at various locations within the system -Other-Other EPS scenarios requested by city staff as may be reasonably accommodated. g. Model Calibration: JCEA will endeavor to calibrate the base model based on best available information and best practices. In general JCEA will utilize CoAB- provided information. This information may be supplemented with specific field tests. JCEA will provide 16 man-hours for field testing. JCEA will require the assistance of CoAB staff in planning and coordinating field testing plus test equipment. JCEA cannot guarantee model accuracy. h. Water Quality Simulation: No water quality simulation or modeling is included. i. Transient Analyses: No transient analyses (such as water hammer) are included. j. Storage Tank Mixing and Water Age: No storage tank mixing or water age analyses are included. Task II -Conduct Specific Model Runs • Conduct average daily and maximum day plus fire flow hydraulic modeling across the entire CoAB potable Water System to determine specific areas where the potable water system has needs or deficiencies. Based on various computer model runs, develop options to eliminate the deficiencies in the water system. • Conduct average daily and maximum day plus fire flow hydraulic modeling to determine the need for capital improvements related to WTP#4 (if WTP#4 should be phased out or improved). Determine if the other three City WTPs can provide sufficient water supply for the service area of WTP#4. Determine if piping improvements can eliminate the need for, or improve the performance of, WTP#4. Summarize capital costs and present options to the city to determine the most cost-effective solution for WTP#4. • Conduct average daily and maximum day plus fire flow hydraulic modeling to address hydraulic concerns addressed in the 2007 Water Distribution System Model Update (indicated that the current water distribution system did not meet Maximum Day Flow plus Fire Flow in several areas of the City). Determine if these areas have hydraulic concerns at the present time and what specific upgrades are required. Based on various computer model runs, develop options to eliminate the deficiencies in the water system. Task Ill -Deliverables & Recommendations AGENDA ITEM # 4D APRIL 13, 2015 • Plot of map of current water system Pressure Gradients (hard copies to be printed out by CoAB) • All Model runs shall be provided in digital pdf format (no hard copies or printed out by CoAB) • Deliver computer model and CoAB's software back to the City. Assist with installation on city computer if required. Provide overview of model and software to city staff. Assist in one day modeling training if requested by the city. • Based on results of Task II, provide summary ofwater system improvements-New Water Distribution System Capital Improvement Program. • Attend up to four (4) City meetings for purposes to include but not limited to: review with city personnel -scheduling of field work/testing; update on construction of model; list of critical water distribution piping projects; scheduling of capital improvements projects; etc. MANHOUR & REIMBURSEABLES BREAKDOWN March 19, 2015 City of Atlantic Beach FL ·Water System Hydraulic Model ' LABOR COSTS Man Hours/Labor Rates WORK BREAKDOWN Principle PM PE TECH Clerical Hourly Rate $58.00 $50.00 $46.00 $30.00 $18.00 Task 1-Model Development 1. Review Exist. Reports -Water Demand/Supply/ Population Data & Future Growth Projections 1 4 0 0 2 2. Develop Future Population Projections/Water Demands 1 4 0 0 0 3. Setup of Hydraulic Model: 1 8 0 2 0 Model Construction & Develop Physical Facilities Data: 4. Piping & Appurtances 1 80 0 0 0 5. Pumps & Tanks 2 10 0 0 0 6. Water Demand Data 2 12 0 0 0 7. Demand Scenario Construction 1 15 0 0 0 9. Field Testing 0 16 0 0 0 10. Model Calibration 1 16 0 2 0 Task 11-Conduct Various Model Runs 1. Conduct Various Model Runs 6 16 0 2 0 Task Ill-Deliverables 1. Preparation of Digital Documents 4 8 0 0 2 2. Deliver Model & Setup w/City 4 8 0 0 0 3. Summarize Findings Into Water CIP 2 4 0 0 2 3. Review Meetings with City 6 10 0 0 0 Totals 32 211 0 6 6 Principle Project Manager PE -Engineer Technician Clerical SUBTOTAL DIRECT LABOR COSTS OVERHEAD at 2.5 PROFIT ON OH/DL -9% TOTAL LABOR FEE REIMBURSABLE COSTS Quantity Unit Price Mileage 500 Ml $0.55 Courier & Postage 1 $45.00 Copying 1 LS $200.00 Plottting 40 SHTS $2.00 SUBTOTAL REIMBURSABLE COSTS TOTAL ENGINEERING COST I AGENDA ITEM# 4D APRIL 13. 2015 TOTAL $294.00 $258.00 $518.00 $4,058.00 $616.00 $716.00 $808.00 $800.00 $918.00 $1,208.00 $668.00 $632.00 $352.00 $848.00 $12,694.00 $1,856.00 $10,550.00 $0.00 $180.00 $108.00 ----------------- $12,694.00 $31,735.00 $2,856.15 $34,591.15 $275.00 $45.00 $200.00 $80.00 $600.00 $35,191