Loading...
Item 8A - Wind Shutter Replacement PanelsAGENDA ITEM: SUBMITTED BY: DATE: BACKGROUND: CITY OF ATLANTIC BEACH CITY COMMISSION MEETING STAFF REPORT Wind Shutter Replacement Panels AGENDA IT!<;M fJ 8A APRIL 13,2015 Douglas E. Layton, P.E., rz/ f"') /2 (__ Public Works Director £-Y .. U t: ~ L March 16, 2015 In December, 20 14 a storage trailer contain in g the custom fit polycarbonatc sec through wind shutter panels for the City Hall bui ldin g was sto len from the locked, fenced in area of Water Plant #1 where it was being stored. COAB Police Depa1tment has investigated and HR has the required paperwork to submit an insurance claim. A new trailer has been requisitioned. Custom Storm Shutters Direct, In c. has proposed $14,684 to supp ly clear replacement shutters to attac h to the City Hall buildings . Thi s inc ludes rep lacing existi ng hardware, supply of removable bottom track s for the entry doors, dr ill to match anchors in floors, and label all panels and tracks corresponding to the correct openings. This vendor was awarded the or iginal bid (1112 -1 0) for this project. BUDGET: There is cutTen tty$ I 8,526 in account 00 1-1009-519-64-00. A future budget modification will be needed for approval by the City Commission to replenish this account when the insurance claim is received. RECOMMENDATION: Purchase the replacements shutters in the amount of$14,684 as recommended. ATTACHMENTS: Quo te from Custom Storm Shutters Direct, Inc. REVIEWED BYCJTY MANAGER: ::?! { rJ.~ ,~u "Belter ProducJs, B etter Ser vice ...... Every day" AGENDA ITEM #SA AJ>RJL 13 ,20 15 A Golde11 Rule Compa11y Certified General Contractor CGC1516284 CBC1255541 St Augustine (904) 824-8401 Jackso nville (904) 745-9779 Amelia Island (904) 277-37970 Ormond Beach (386} 672-3737 New Smyrna Beach {386) 424-9900 Titusville (321) 268-4550 Hurricane, Security, and Decorative Shutters, Garage Doors To: Patty Drak e From: Mike O'Connell Vice President 0 2/26/15 800 Seminole Rd Atl antic Bch , Fl Re : Hurricane panels Sc ope Custom Storm Sh utter s Direct Inc. S upp ly all clear panels nee d ed to att ach to the City Hall bui l dings existing hardware . Supply removab le bo ttom tracks for the e ntry door s. Drill to m atch anchor s In f loors. Label all panels and tracks per t he openings to which they belong. Total Cost $ 14,684.00 If you have any qu estions please do not h es itate to call or email me. Thank you, Mike O'Conne ll /