Loading...
1390 Begonia Street 15-DRTV-1031 Site Plans(5.05 FND. CONC MONT MES (NO 1. D.) ELEV. (4.46) 0.4' (4.05). o 6'± D I T C H (5.05). . . . . . . . . . . . . (TYPICAL) 0 12" WOOD POST 3' HIGH n (5.01) _ (6.2) O chi WEST 14th STRE ET BENCHMARK O WOOD POWER o (50.0 FOOT RIGHT-OF-WAY) POLE (4.75) NOT PAVED PK NAIL IN POLE { ) ELEVATION (7.83) Q (6.05) ,9 6" WILD OLIVE 6 HICKORY ..,•„•............. 9, I ,�,• 7 OAK 9, FD. /2 IRON , 7" OAK 7 OAK (LB 231):: 102.00 6" OAK (5.8} ::: .. 18 INE }. 0 :a; m .: 9 f i UI ::':;:• r .................. C� 0 ;:. TWIN 23 o m J ?;:...:::;.: HI C K O R Y C3 14 HICKORY ° 99 ^_ 14 PALM • PROPOSED 1 STORY R SIDE�JCE O FF EL. - 7.00 _s 5. -. .. (6.4) 6" WILD OLIVE 90.19' ,.r�l (4.9) FD, 1/2" IRON (LB 5231) .5' PROPOSED STORMWATER STORAGE AREA N . 1 . 102.00' INSTALL SILT FENCE (SEE DERAIL) MANHOLE ELEV. (6.69) 1 @ (6.38 (6.66) z w PRE -DEVELOPMENT RUNOFF VOLUME: w 17" PAL EDL 9" MAGNOL' C3 Ll- o RATIONAL RUNOFF COEFFICIENT "C" - 0.4 8" MA NOLIA � O 13" 0 _ on HICKORY oz Lli PERVIOUS AREA - 7,143.8 S.F. - 2,985.3 S.F. = 4,158.5 S.F. Q O X (2,985.3 S.F.)/7,143.* S.F. WEIGHTED RATIONAL RUNOFF COEFFICIENT C = 0.49 U 25 YR. - 24 HR. RAINFALL DEPTH FOR ATLANTIC BEACH - 9.3 INCHES � RUNOFF VOLUME = (0.49) X (7,143.8 S.F.) X (9.3 INCHES/12 INCHES/FOOT) cO � o CA ELEVATION AREA (S.F.) 5.0 727 S.F. 12" PALM 22" LIVE OAK 545 S.F. > 512 S.F. OK PROPOSED STORMWATER MANAGEMENT SYSTEM MEET THE MINIMUM REQUIREMENTS OF THE CITY OF ATLANTIC BEACH MANHOLE ELEV. (6.69) 1 @ (6.38 (6.66) z w PRE -DEVELOPMENT RUNOFF VOLUME: w DRAINAGE AREA - 7,143.8 S.F. EDL Q 3: Ll- o RATIONAL RUNOFF COEFFICIENT "C" - 0.4 0 q � O RUNOFF VOLUME = (0.40) X (7,143.8 S, F.) X (9.3 INCHES/12 INCHES/FOOT) = 2,214.6 C.F. POST -DEVELOPMENT RUNOFF VOLUME: CD =_...� PERVIOUS AREA (ROOF, 6RIVEWAY 8c SIDEWALKS) - 2,985.3 S.F. PERVIOUS AREA - 7,143.8 S.F. - 2,985.3 S.F. = 4,158.5 S.F. O X (2,985.3 S.F.)/7,143.* S.F. WEIGHTED RATIONAL RUNOFF COEFFICIENT C = 0.49 O Li0 25 YR. - 24 HR. RAINFALL DEPTH FOR ATLANTIC BEACH - 9.3 INCHES RUNOFF VOLUME = (0.49) X (7,143.8 S.F.) X (9.3 INCHES/12 INCHES/FOOT) = 2,726.8 C.F. � o STORMWATER STORAGE VOLUME: ELEVATION AREA (S.F.) (6.47) DL 9 � ��1 8" PALM - 10 MAGNOLIA \1 19.0 ------------ 1(6-64) DRAINAGE DIVIDE (T P.) DRAINAGE AREA x1,143.8 S.F. FD. /2 IRON (RLS 3129) 4I i OPTIONAL POST POSITIONS POST (OPTIONS: 2"X4" OR 2 1/2" MIN. 20*± DIA. WOOD; STEEL 1.33 LBS./FT. MIN. < PRINCIPLE POST POSITION (CONTED 6' MAX. FILTER w 20" TOWARD FLOW) FABRIC FILTER FABRIC w SILT FLOW GRADE ----^ N iY7 °Q I U ELEVATION Li SECTION TYPE III SILT FENCE N.T.S. EROSION CONTROL NOTES: 1. ALL AREAS DISTURBED AND LEFT FOR MORE THAN 30 DAYS MUST BE SEEDED AND MULCHED UNLESS OTHERWISE NOTED, CONTRACTOR MUST MAINTAIN NEWLY GRADED AREAS AND REPAIR AREAS WHERE SETTLING AND EROSION HAVE OCCURRED, 2. CONTRACTOR MUST PROVIDE ALL MATERIALS AND TAKE WHATEVER MEANS NECESSARY TO PREVENT THE EROSION OF AND DEPOSIT OF SEDIMENT ON ADJACENT AND DOWNSTREAM PROPERTIES, CONTRACTOR MUST IMPLEMENT AND PROVIDE SUITABLE EROSION CONTROL MEASURES (I.E. SEDIMENTATION BARRIERS, HAYBALES, SILTATION CURTAINS, TEMPORARY DETENTION DISTILLING BASINS, ETC.) TO ENSURE THE CONTROL OF STORMWATER RUNOFF, THIS PLAN DESCRIBES THE MINIMUM AMOUNT OF EROSION PROTECTION REQUIRED BY PROPOSED ACTIVITIES. IN THE EVENT OF UNFORSEEN EROSION, OTHER MEASURES OF EROSION CONTROL (EROSION CONTROL ACTIVITIES SUCH AS THOSE LISTED ABOVE), WILL BE REQUIRED. 3. TURBIDITY BARRIERS MUST BE INSTALLED AT ALL LOCATIONS WHERE THE POSSIBILITY OF TRANSFERRING SUSPENDED SOLIDS INTO THE RECEIVING WATERBODY EXISTS DUE TO THE PROPOSED WORK. TURBIDITYBARRIERS MUST REMAIN IN PLACE AT ALL LOCATIONS UNTIL CONSTRUCTION IS -COMPLETED AND SOILS ARE STABILIZED AND VEGETATION HAS BEEN ESTABLISHED. TREREAFTER THE PERMITTEE WILL BE RESPONSIBLE FOR THE REMOVAL OF THE BARRIERS. 4, PERMANENT VEGETATIVE COVER MUST BE ESTABLISHED ON ALL EXPOSED LAND SURFACES WITHIN ONE YEAR FROM THE DATE THE CONSTRUCTION IS COMPLETE. 5. CONTRACTOR SHALL PLACE SILT FENCE ALONG PROPERTY LINE AROUND THE ENTIRE SITE PRIOR TO COMMENCEMENT OF CONSTRUCTION. ' REQUIRED STORMWATER STORAGE VOLUME (PER CITY OF ATLANTIC BEACH) PRE -DEVELOPMENT RUNOFF VOLUME: DRAINAGE AREA - 7,143.8 S.F. THE ENTIRE SITE DRAINS FROM BEGONIA STREET TO THE WEST OR REAR THE ENTIRE SITE IS UNDEVELOPED WOODED RATIONAL RUNOFF COEFFICIENT "C" - 0.4 ENTIRE PRE -DEVELOPMENT SITE IS PERVIOUS 25 YR. - 24 HR. RAINFALL DEPTH FOR' ATLANTIC BEACH = 9.3 INCHES RUNOFF VOLUME = (0.40) X (7,143.8 S, F.) X (9.3 INCHES/12 INCHES/FOOT) = 2,214.6 C.F. POST -DEVELOPMENT RUNOFF VOLUME: DRAINAGE AREA - -7,143.8 =_...� PERVIOUS AREA (ROOF, 6RIVEWAY 8c SIDEWALKS) - 2,985.3 S.F. PERVIOUS AREA - 7,143.8 S.F. - 2,985.3 S.F. = 4,158.5 S.F. WEIGHTED RATIONAL RUNOFF COEFFICIENIT ;;Ci: _ (.2) X (4,158.5 S.F.) + (.9) X (2,985.3 S.F.)/7,143.* S.F. WEIGHTED RATIONAL RUNOFF COEFFICIENT C = 0.49 25 YR. - 24 HR. RAINFALL DEPTH FOR ATLANTIC BEACH - 9.3 INCHES RUNOFF VOLUME = (0.49) X (7,143.8 S.F.) X (9.3 INCHES/12 INCHES/FOOT) = 2,726.8 C.F. REQUIRED STORAGE VOLUME: 2,726.8 C,,F. - 2,214.6 C.F. = 512 C.F. STORMWATER STORAGE VOLUME: ELEVATION AREA (S.F.) 5.0 727 S.F. 4.0 364 S.F. TOTAL STORMWATER STORAGE VOLUME = 727 S.F. + 364 S.F./2 X 1.0 FT. = 545 S.F. > 512 S.F. OK PROPOSED STORMWATER MANAGEMENT SYSTEM MEET THE MINIMUM REQUIREMENTS OF THE CITY OF ATLANTIC BEACH CONSTRUCTION PLANS OF Z� SITE DRAINAGE IMPROVEMENTS Q F QR, PROPOSED RESIDENCE z ATI BEGONIA STREET WEST 1 th STREET p ATLANTIC BEA•,CH, FLORIDA � DATE i LEGEND (6.4) EXISTING SPOT ELEVATIONS 5.0 FINAL GRADING CONTOURS 310" MAGNOLIA EXISTING TR�ES Dt EXISTING TREES TO BE REMOVED i �j F. SILT FENCE 1 POST -DEVELOPMENT DRAINAGE PLAN DESIGNED BY: PROJECT No DRAWING: R, I . B . SITE\ \POSTAN MARTIN DEV P ABEGONIA DRAWN BY: J. u FIELD BOOK No; PAGE(S) y R.J.B. _ SCALE: C 1 9i 9 PROFE$_SkONAL ENGINEER: 1_10 RONALD J, BONGIOVANNI DATE: REVISION BY FLA. AUTHE X514355 4/27/2015