Loading...
2nd page of BLDG DENIAL a. Two copies required. b. Please list metal roof and wall products. c. Both conventional and synthetic stucco are shown on plans. Please clarify all stucco details and provide synthetic stucco Numbers, if applicable. 4. 0.K. 5. Fire-resistant rated door assemblies do not comply with FBC-B, Table 715.4. Please review all doors in 2-hour rated fire barriers. 6. O.K. 7. Please provide electrical details for charging batteries and electric vehicles, per 2008 NEC, Articles 511.10 and 625. Dan Arlington 247-5813 darlington@coab.us 2