Loading...
2321 MAYPORT RD - DOLLAR TREE MISC DOC - City of Atlantic Beach APPLICATION NUMBER ,•,-•- (To be as ign d by the Building Department.) r Building Department A/`0 . 3 /„ f. :` ''l 800 Seminole Road � . hk-' , - .�t'1 Atlantic Beach, Florida 32233-5445 7/3",6- ' Phone(904)247-5826 • Fax(904)247-5845 Date routed: ;,J_Y. .�< E-mail: building-dept @coab.us - ,, t City web-site http-//www coab.us APPLICATION REVIEW AND TRACKING FORM 32 itt)ei Il e• , -nt review required Yes No Property Address: — - � : . •• �= / dif Planning&Zonin• _ Applicant: ree •••ministrator (-Public Works Project: I Q I r �' 411_- • • �� Public Safety 1/i 1) 5 Review fee $ Dept Signature Review or Receipt Date Other Agency Review or Permit Required of Permit Verified B�^ Florida Dept. of Environmental Protection Florida Dept. of Transportation St. Johns River Water Management District Army Corps of Engineers Division of Hotels and Restaurants Division of Alcoholic Beverages and Tobacco �e •\ 1 Other: — 1N1 APPLICATION STATUS 1/ �" Reviewing Department First Review: []Approved. Denied. / - . (Circle one.) Comme ts: // j�,� ;7/e..- r �lQ S�l//l�j� ' A %O« 2 6. 44•- f BUILDING /vv- PLANNING &ZONING ride 61 Reviewed by: tmcLer,/ Date: 04 !S".- TREE ADMIN. Second Review: ❑Approved as revised. nDenied. PUBLIC WORKS Comments: PUBLIC UTILITIES PUBLIC SAFETY Reviewed by: Date: •E SERVICES Third Review: I 'Approved as revised. nDenied. Comments: Reviewed by: Date: Revised 07/27/10 ADDENDUM #3 (SLM REVISION #3) of Plans and Specifications for Dollar Tree—Atlantic Beach, FL CGL Project 1405-137 February 2nd, 2015 Clark, Geer, Latham & Associates, Inc. Mobile, Alabama NOTE: Addendum#3 contains SLM Revision #3 to the specifications & or drawings as listed below. Changes to the above referenced project have been made that include, but are not limited to the following. Reference specifications & or drawings included in this addendum for changes. The plans for the above referenced project shall be amended to include: 1. Drawing TT=1 has been revised and dated 1/30/15. SLM Revision#3 includes the following: A. Showed protected building per fire comment#1. 2. Drawing TT=3 has been revised and dated 1/30/15. SLM Revision#3 includes the following: A. Added fire sprinkler per fire comment#1. 3. Drawing C-9.0 has been revised and dated 1/30/15. SLM Revision#3 includes the following: A. Added fire line & hydrant per fire comment#1. 4. Drawing S-2.0 has been revised and dated 1/30/15. SLM Revision#3 includes the following: A. Raised center bay of side parapets per zoning comment#1. 5. Drawing S-3.0 has been revised and dated 1/30/15. SLM Revision#3 includes the following: A. Raised T.O parapet in section F per zoning comment#1. 6. Drawing A-1.0 has been revised and dated 1/30/15. SLM Revision#3 includes the following: A. Added fire sprinkler per fire comment#1. 7. Drawing A-1.1 has been revised and dated 1/30/15. SLM Revision#3 includes the following: A. Added fire sprinkler per fire comment#1. B. Relocated mop sink per changes related to new fire sprinkler per fire comment#1. Page 1 of 3 ADDENDUM #3 (SLM REVISION #3) of Plans and Specifications for ' Dollar Tree—Atlantic Beach,FL CGL Project 1405-137 February 2"d, 2015 Clark, Geer, Latham &Associates, Inc. Mobile,Alabama 16. Drawing MP-3.1 has been revised and dated 1/30/15. SLM Revision#3 includes the following: A. Added sprinkler riser diagram &sprinkler intent notes per fire comment#1. 17. Drawing E-1.1 has been revised and dated 1/30/15. SLM Revision #3 includes the following: A. Revised background fire comment#1. 18. Drawing E-1.2 has been revised and dated 1/30/15. SLM Revision#3 includes the following: A. Added fire alarm criteria per fire comment#2. Addendum#3 was distributed February 2, 2015 End of Addendum #3 Page 3 of 3 Clark, Geer, Latham & Associates, Inc. Engineer•Architect 3901 Spring Hill Avenue West•Mobile,Alabama 36608•251/344-7073•FAX 251/343-9179 City of Atlantic Beach Building Permit Division 800 Seminole Road Atlantic Beach, FL 32233 Attn: Rey Escanio, Ricky Carper, & Derek Reeves Subject: Dollar Tree—Atlantic Beach, FL Date: 1-30-15 Permit#: 14CNEW536 To those it may concern, The following is a list of responses to the 2nd submittal comment letter we received. Responses to Fire Marshal Comments received 1-8-15 (Rey Escanio 904-255-8561), rescanio(c@r�coj.net 1. Please provide proof of meeting minimum required fire flow requirements for proposed building per NFPA 1 18.4 and Table 18.4.5.1.2. This can be accomplished by contacting JEA and obtain hydrant flow test information conducted within the last 12 months and providing report with next submission. Flow data can also be obtained by private provider as long as it is witnessed by our office. See attached flow test results. We have revised to include a sprinkler system as required by NFPA Table 18.4.5.1.2 for a flow of less than 2250. 2. Provide the fire alarm design criteria per FAC 61G15-32.008(a-o). Your plans will not be approved without the fire alarm design criteria. We are not asking for shop drawings at this time,just answers to the criteria presented in the A-0. The fire alarm design on sheet E-1.2 has been revised to address the criteria from FAC 61 G 15-32.008(a-o) Responses to Public Works Comments received 1-20-15 (Ricky Carper 904-247-5831) rcarper @coab.us 1. Provide copy of SJRWMD ERP modification application (42-031-37016-1) or new ERP application. Drainage calculations received but need copy of application. Will forward once we have an approved permit. 2. Provide copy of FDOT ROW/Connection Permit to Public Works when received. Need copy of connection permit. Will forward once we have an approved permit. 1 Clark, Geer, Latham & Associates, Inc. Engineer•Architect 3901 Spring Hill Avenue West•Mobile,Alabama 36608•251/344-7073•FAX 251/343-9179 Responses to Zoning Comments received 1-20-15 (Derek Reeves 904-270-1605) dreeves @coab.us 1. Commercial Corridor Design Standards (Section 24-171): The exterior roof design does not meet the requirement for a roof that does not have the appearance of being flat. Please revise plans so that the roof has the appearance of a gable, hip, mansard or other design. Drawings have been revised as requested at the 1-20-15 variance meeting. Please feel free to call if you have any questions regarding these responses. Thank you, 1 Mark M. Aldred, AIA 2 p1 f '�Jiil��• January 12, 2015 Mr. Darren Eyre, P.E. Thomas Engineering RE: Fire Flow Test for Dollar Tree - 2321 Mayport Rd. Dear Mr. Loretta: Per your request, the City flow tested the above fire hydrant with the following results: Location: 2389 Mayport Rd. Tested by: Chris Walker, Division Director Test Date: 1/12/15 Test Time: 9:46 AM Port Diameter: 2.5-inch port Static Pressure: 42 psi Residual Pressure: 35 psi Test Flow Rate: 1,000 gpm The following computational results based on the above variables and NFPA section 291 (2002 edition) are as follows: 1/12/15 - Estimated flow at 20 psi: 1,856 gpm Should you need additional information, please call me at(904) 270-2535 or email me at dkaluzniak cccoab.us. Sincerely, Donna Kaluzniak Utility Director cc: Chris Walker, Division Director Public Utilities Department 1200 Sandpiper Lane Atlantic Beach, FL 32233 (904) 247-5834 City of Atlantic Beach APPLICATION NUMBER _ Building Departmei TO be assigned by the Building Department.) 800 Seminole Road �/ •- - Atlantic Beach, Florida 322:33-5445 YYY Phone(904)247-5826 Fax(904)247-5845 Z �/ •City web-site: http://www.coab.us Date routed: t 4PPLICATION REVIEW AND Pit 4t.CKIING FORM Property ddress: ei?c3 e7 1 /.//7)y Wr a Department review required Yes No Applicant: f 6 anninc :Zone ree Administrator Project: _ 4110 , is VV9lr�a _ tiliti DO//1q T L R L Public Safety • Fire Services .. Review fee $ Dept Signature CONTRACTOR EMAIL ADD ESS CONTRACTOR CONTACT APPUUCATlON STATUS Reviewing Department First Review: I (Approved. Denier (Circle one.) Comments: BUILDING PLANNING & ZONING Reviewed by: J" l Date: /2/W /1 TREE ADMIN. Second Review: H A — — ---- pproved as revised. ❑Denied. PUBLIC WORKS Comments: PUBLIC UTILITIES PUBLIC ETY Reviewed by: Date: FIRE SERVICES _. • Third Review:. IlApproved as revised. ❑Denier.. Comments: Reviewed by: Date: /ISED 09252014 BUILDING PERMIT APPLICATION pmIda6141 n. /i i4 f6, CITY OF ATLANTIC BEACH Ci 800 Seminole Road,Atlantic Beach,FL 32233 /OA • Office(904)247-5826 Fax(904)247-5845 Job Address:2321 MAYPORT ROAD ATLANTIC BEACH, FL 32233Permit Number: Legal Description SEE BOTTOM OF SHEET&ALTA SURVEY Parcel# 169398-0410 Floor Area of Sq.Ft. Sq.Ft Valuation of Work$950,000 Proposed Work heated/cooled 9,973 non-heated/cooled 0 Class of Work(circle one): Ncw Addition Alteration Repair Move Demolition pool/spa window/door Use of existing/proposed structure(s)(circle one): ommercia Residential If an existing structure,is a fire sprinkler system installe n. irc e one): Yes No N/A Florida Product Approval# For multiple products use product approval form Describe in detail the type of work to be performed: NEW BUILDING INCLUDING SITE.STRUCTURAL, ARCHITECTURAL AND INTERIOR,MECHANICAL, PLUMBING AND ELECTRICAL. CONTRACT OwnerrmntormRTo(OWNER: Name: CDA HOLDINGS, LLC Address:CIO DYNAMIC COMMERCIAL -1 COMMERCIAL CENTER City VIRGINIA BEACH State VAZip 23462 Phone 757-333-7504 E-Mail or Fax#(Optional)drbusheyCa dynamiccommercial.com Contractor Information: Company Name:TBD-BIDDING Qualifying Agent: Address: City State Zip Office Phone Job Site/Contact Number Fax# State Certification/Registration# Architect Name&Phone# MARK M.ALDRED,AIA 251-344-7073 maldredt�cglengineers.eom Engineer's Name&Phone# DARREN THOMAS REASOR EYRE, P.E. 813-379-4100 deyre @thomaseg.com Fee Simple Title Holder Name and Address Bonding Company Name and Address Mortgage Lender Name and Address Application is hereby made to obtain a permit to do the work and installations as indicated. I certify that no work or installation has commenced prior to the issuance of a permit and that all work will be performed to meet the standards of all laws regulating construction in this jurisdiction. This permit becomes null and void if work is not commenced within six(6)months,or if construction or work is suspended or abandoned for a period of six(6)months at am'time after work is commenced. I understand that separate permits must be secured for Electrical{Pork,Plumbing,Signs,Wells,Pools,Furnaces,Boilers,Heaters, Tanks and Air Conditioners,etc. WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING,CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. I hereby certify that I have read and examined this application and know the same to he true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other federal,state,or local law regulating construction or the performance of construction. Signature of Owner �---'— Signature of Contractor Print Name D.RICHARD BUSHEY-MANAGING MEMBER Print Name Sworn to acid subscrl red before me ,%%%%%' 11111, Sworn to and subscribed before me �- ,r LYNN , this ,f ay ; .4 11 01;.1•A, 1 i :,�'s this Day of •20 • � u■%LLAYcIMl�9 "G;• `f Notary P d:lic`.� el 0 CO MI, - n S Notary Public LEGAL DESCRIPTION: = "1/14/s,/0A/ j< : Revised 01.26.10 A PORTION OF GOVERNMENT LOT 7, C•« J3.T�MN9 8 OUTtf,:,. L 29 EAST.DUVAL COUNTY,FLORIDA,BEING MORE PARTICULARLY DESCRIBED AS FOLLOWS:FOR A POINT OF REFER ■ -,QMMENC HEN!)-.' T CORNER OF FAIRWAY VILLAS AS RECORDED IN PLAT BOOK 39,PAGES 22 AND 22A OF THE CURRENT PUBLIC REC•:• : ID COUNTY:41-�• - '01'42'10'w,ALONG THE EASTERLY RIGHT-OF-WAY LINE OF MAYPORT ROAD (STATE ROAD AtA A 100.00 FOOT RIGHT `' , MA .: ET TO THE POINT OF BEGINNING;THENCE CONTINUE ALONG SAID EASTERLY RIGHT-OF-WAY LINE N01•42'10'W,A DISTANOVIIOF. u A SITUATE ON SAID EASTERLY RIGHT-OF-WAY LINE; THENCE N88'1T50'E,300.00 FEET; THENCE SO1'4210'E 270.00 FEET;THERe 568 1#7,%%% %O FEET TO THE POINT OF BEGINNING. -'T-�e11111 TOGETHER WITH THE EASEMENT RIGHTS GRANTED TO GRANTOR IN INSTRUMENT RECORDED AT OFFICIAL RECORDS VOLUME 6411,PAGE 148.CURRENT PUBLIC RECORDS OF DUVAL COUNTY.FLORIDA. r .l rigF `. •h T : Jacksonville Fire and Rescue Department 'yo =scab Q�� FIRE PREVENTION DIVISION i '98SCUE 0 . PROJECT NAME: Dollar Tree ADDRESS: 2321 Mayport Rd. \Lt. REVIEWED BY: RE DATE: 12/10/2014 t\\ After initial review,the following exceptions were noted in your construction plans submitted to this office as part of the building/mechanical permit process: 1. When resubmitting corrected sheets, please provide a written narrative letter responding to our comments, along with clouded areas on revised sheets clearly showing areas where changes or corrections have occurred. 2. Please provide proof of meeting minimum required fire flow requirements for proposed building per NFPA 1 18.4 and Table 18.4.5.1.2. This can be accomplished by contacting JEA and obtain hydrant flow test information conducted within the last 12 months and providing report with next submission. Flow data can also be obtained by private provider as long as it is witnessed by our office. Hydrant must be within 500' of proposed building measured via drivable fire dept. access rd. 3. Provide the fire alarm design criteria per FAC 61G15-32.008(a-o). 4. Provide exit door tactile signage (Braille) per N.F.P.A. 101, 7.10.1.3./ 5) Provide light-frame truss-type construction identification signage per FAC 69A-60.0081 or written verification from a licensed architect or engineer stating that such structure does not meet the definition of 69A-60.0081. / 6) 11.1.9.1* Means shall be provided for the fire department to disconnect the electrical service to a building, structure, or facility when the electrical installation is covered under the PHONE: (904) 255 8560 214 N HOGAN ST. JACKSONVILLE, FLORIDA 32202 FAX: (904)255-8559 ��C,K50tl���rF sscs7 ,- Jacksonville Fire and Rescue Department 'moo 'taco. 4;4' FIRE PREVENTION DIVISION It" 9fSCUt e p IZO ) S PROJECT NAME: Jo tar T28-E ADDRESS: 93 a 141947 ET R� . REVIEWED BY: er DATE: 1 /7 // 5 Air ini'ial review,the following excepirons were noted in your construc -ion plans submitted to this office as part of the building/mechanical permit process: 1. yam,,,,- r(aa.s wrl I or be grprovp.6 .f., r+kc i -rte Fire A4-4 'i Ciestiv Crrfever. (.4. Art° N 07 �5t`/NI t t/2 � h r SJ c ..‘.4.).A/5-5 4 r t- 5 ispevt J u 5 7 4 A)..5 . "10 't''fir cri't!'eht4 re /N to h"—D. I 2. -nit IA ynfra ni ! --00,42 s7" resw-ts ial( lot. iNc�.dec`II w(4I^. t-k8 e�rsc� 4./‘ ii\ ?fc\\ � 6 3. 4. PHONE: (904) 255 8560 214 N HOGAN ST. JACKSONVILLE, FLORIDA 32202 FAX: (904)255-8559 APPLICATION NUMBER (To be assiiggn( by the Building Department.) ----)I 145 ` ! ' Alt I r �� J4)247 5845 '� I -_� 5 G c Date routed: � is G b =VIEW AND TRACKING FORM ,ol\-. \\ iv, nC b Department review required Yes No \\ Buil fanning&Zonin Tree Administrator is Wor Public Utilities Public Safety s...-- Fe Services Review fee $ Dept Signature Other Agency Review or Permit Required of Permit Verified By Date Florida Dept.of Environmental Protection Review or Receipt Florida Dept. of Transportation St.Johns River Water Management District Army Corps of Engineers Division of Hotels and Restaurants Division of Alcoholic Beverages and Tobacco Other: APPLICATION STATUS Reviewing Department First Review: ❑Approved. ❑Denied. (Circle one.) Comments: BUILDING PLANNING&ZONING Reviewed by:TREE ADMIN. Date: ,,�--,,,��Second Review: Approved as revised. I —tDenied. PUBLIC WORKS Comments: PUBLIC UTILITIES PUBLIC SAFETY Reviewed by: Date: I /�/S FIRE SERVICES Third Review: [Approved as revised. enied. Comments: Reviewed by: Date: Revised 07127/10 J1O II MI— / 'G C C. o'.Jc,e I /sir ypul t ,C d CLARK,GEER,LATHAM&ASSOCIATES,INC. Engineers-Architects LLEIT T PfW OF Tram Nterf U o Ub 3901 Springhill Avenue Mobile,Alabama 36608 www.cglengineers.com DAT" 1— 5_FS +a MO.�,',1�`n / (251)344-7073 FAX(251)343-9179 ATTSNTSON . • yWw'�_ J� TO ( ,I� fr6n. 4II.La 'A 1I4 I I 1 . e, Nt ;ry1Q proA 0fkU i L F ,-;-1,- 13 WE ARE SENDING YOU ❑ Attached ❑ Under separate cover via the following items: ❑ Shop drawings ❑ Prints ❑ Plans ❑ Samples ❑ Specifications ❑ Copy of letter ❑ Change order ❑. COPIES DATE NO. w,' DESCRIPTION 5 riff /laml, ` Up C) IIIIII`�^^'�^^'.������a _I&:. A ".!"77!"7772 /y_ N' i() - 5.3 ,o, THESE ARE TRANSMITTED as checked below: yFor Approval ❑ Furnish as submitted ❑ Resubmit copies for review ❑ For you?use ❑ Furnish as noted ❑ Submit copies for distribution ❑ As requested ❑ Returned for corrections ❑ Return corrxted prints ❑ For review and comment ❑ tJ FOR BIDS DUE 20 ❑ PRINTS RETURNED AFTER LOAN TO US REMARKS COPY TO / /1 SIGNED: fiR A u •nclosur•s •r• not •e noted. kindly notify us it one*. ADDENDUM #1 (SLM REVISION #1) of Plans and Specifications for Dollar Tree—Atlantic Beach, FL CGL Project 1405-137 December 12`", 2014 Clark, Geer, Latham & Associates, Inc. Mobile, Alabama NOTE: Addendum#1 contains SLM Revision#1 to the specifications& or drawings as listed below. Changes to the above referenced project have been made that include, but are not limited to the following. Reference specifications& or drawings included in this addendum for changes. The following are clarifications to the plans and specifications for the above referenced project: 1. The bid date is being extended to December 23`d, 2014 to allow for the bidding of items added in this addendum. 2. Removal & fill of the underground storage tanks will be done by the current owner and will not be a part of this contract. The specifications for the above referenced project shall be amended to include: 1. See the FRONT END DOCUMENTS: A. Refer to page B1 Invitation for Bids: On line 2 of the second paragraph, Delete: December 17, 2014 Replace with: December 23, 2014 See attached for full revised section FRONT END DOCUMENTS The plans for the above referenced project shall be amended to include: 1. Drawing C-2.0 has been revised and dated 12/12/14. SLM Revision#1 includes the following: A. Added note clarifying removal of UST. 2. Drawing C-4.1 has been revised and dated 12/12/14. SLM Revision#1 includes the following: A. Added canopies& removed wall packs per planning comment. 3. Drawing C-7.0 has been revised and dated 12/12/14. SLM Revision #1 includes the following: A. Revised the friction course from type S-III to SP-9.5 on the asphalt pavement section for clarity. B. Revised the detention basin control structure and underdrain inverts per SJRWMD comment. Page 1 of 3 ADDENDUM #1 (SLM REVISION #1) of Plans and Specifications for Dollar Tree—Atlantic Beach, FL CGL Project 1405-137 December 12`x', 2014 Clark, Geer, Latham& Associates, Inc. Mobile, Alabama 4. Drawing C-8.0 has been revised and dated 12/12/14. SLM Revision #1 includes the following: A. Revised cross sections A-A, B-B, & D-D per public works comment #3. B. Added underdrain detail per SJRWMD comment. 5. Drawing C-9.0 has been revised and dated 12/12/14. SLM Revision #1 includes the following: A. Added backflow preventers and connection note for the water service per public utilities comment #2. B. Revised the sanitary service to connect to the existing lateral clean out per public utilities comment#1. 6. Drawing S-2.0 has been revised and dated 12/12/14. SLM Revision#1 includes the following: A. Added blocking for canopies per planning comment. B. Corrected grids and dimensions on framing elevation at gridline 5 7. Drawing A-1.0 has been revised and dated 12/12/14. SLM Revision #1 includes the following: A. Added canopies per planning comment. 8. Drawing A-1.1 has been revised and dated 12/12/14. SLM Revision#1 includes the following: A. Added canopies per planning comment. 9. Drawing A-1.2 has been revised and dated 12/12/14. SLM Revision #1 includes the following: A. Added canopies per planning comment. 10. Drawing A-1.3 has been revised and dated 12/12/14. SLM Revision #1 includes the following: A. Added canopies per planning comment. 11. Drawing A-2.0 has been revised and dated 12/12/14. SLM Revision #1 includes the following: A. Added canopies & feaux storefront per planning comment. Page 2 of 3 ADDENDUM #1 (SLM REVISION #1) of Plans and Specifications for Dollar Tree—Atlantic Beach, FL CGL Project 1405-137 December 12`h, 2014 Clark, Geer, Latham & Associates, Inc. Mobile, Alabama 12. Drawing A-2.6 has been revised and dated 12/12/14. SLM Revision#1 includes the following: A. Added Maltese Cross signage to storefront per city fire comment#5. 13. Drawing A-3.0 has been revised and dated 12/12/14. SLM Revision#1 includes the following: A. Added blocking for canopies per planning comment. 14. Drawing A-3.1 has been revised and dated 12/12/14. SLM Revision#1 includes the following: A. Added note 15 & detail B per city fire comment#4. B. Revised door note 9 per fire comment#5. 15. Drawing A-4.1 has been revised and dated 12/12/14. SLM Revision#1 includes the following: A. Added canopy & feaux storefront per planning comment. 16. Drawing A-5.0 has been revised and dated 12/12/14. SLM Revision#1 includes the following: A. Added canopies per planning comment. Addendum#1 was distributed December 12, 2014 End of Addendum#1 Page 3 of 3 ADDENDUM #2 (SLM REVISION #2) of Plans and Specifications for Dollar Tree—Atlantic Beach, FL CGL Project 1405-137 December 30th,2014 Clark, Geer, Latham&Associates, Inc. Mobile,Alabama NOTE: Addendum#2 contains SLM Revision#2 to the specifications& or drawings as listed below. Changes to the above referenced project have been made that include,but are not limited to the following. Reference specifications&or drawings included in this addendum for changes. The plans for the above referenced project shall be amended to include: 1. Drawing C-4.0 has been revised and dated 12/30/14. SLM Revision#2 includes the following: A. Revised bike rack note to clearly label capacity per zoning comment #4. 2. Drawing C-5.0 has been revised and dated 12/30/14. SLM Revision#2 includes the following: A. Revised bike rack detail for clarity. 3. Drawing L-1.0 has been revised and dated 12/30/14. SLM Revision#2 includes the following: A. Added tree per zoning comment#2. 4. Drawing L-3.0 has been revised and dated 12/30/14. SLM Revision#2 includes the following: A. Added irrigation for new tree per zoning comment#2. 5. Drawing L-4.0 has been revised and dated 12/30/14. SLM Revision#2 includes the following: A. Added irrigation for new tree per zoning comment#2. 6. Drawing ES-1.1 has been revised and dated 12/30/14. SLM Revision#2 includes the following: A. Removed wall packs to match photometrics revised in Addendum#1 per zoning comment#1. Addendum#2 was distributed December 30,2014 End of Addendum#2 Page 1 of 1 Clark, Geer, Latham & Associates, Inc. Engineer•Architect 3901 Spring Hill Avenue West•Mobile.Alabama 36608•251/344-7073•FAX 251/343-9179 City of Atlantic Beach Building Permit Division 800 Seminole Road Atlantic Beach, FL 32233 Attn: Rey Escanio,Ricky Carper,Donna Kaluzniak, &Derek Reeves Subject: Dollar Tree—Atlantic Beach, FL Date: 12-30-14 Permit#: 14CNEW536 To those it may concern, The following is a list of responses to the 1st submittal comment letter we received. Responses to Fire Marshal Comments received 12-11-14 (Rev Escanio 904-255-8561) rescanio @coj.net 1. When resubmitting corrected sheets,please provide a written narrative letter responding to our comments, along with clouded areas on revised sheets clearly showing areas where changes or corrections have occurred. Will provide 2. Please provide proof of meeting minimum required fire flow requirements for proposed building per NFPA 1 18.4 and Table 18.4.5.1.2. This can be accomplished by contacting JEA and obtain hydrant flow test information conducted within the last 12 months and providing report with next submission. Flow data can also be obtained by private provider as long as it is witnessed by our office. The flow test has been scheduled with the City of Atlantic Beach, reports to be submitted after completion. 3. Provide the fire alarm design criteria per FAC 61G15-32.008(a-o). Fire alarm design shall be a deferred submittal to be provided by the GC. 4. Provide exit door tactile signage (Braille)per N.F.P.A. 101, 7.10.1.3. Signage is shown on sheet A-3.1, elevation B. 5. Provide light-frame truss-type construction identification signage per FAC 69A-60.0081 or written verification from a licensed architect or engineer stating that such structure does not meet the definition of 69A-60.0081. Signage is shown on sheets A-2.6 & A-3.1. 6. NFPA 101-11.1.9.1* Means shall be provided for the fire department to disconnect the electrical service to a building, structure, or facility when the electrical installation is covered under the scope of NFPA 70. 11.1.9.2 The disconnecting means shall be maintained accessible to the fire department. 11.1.9.3 Identification of Disconnecting Means. 11.1.9.3.1 Each disconnecting means shall be legibly marked to indicate its 1 • Clark, Geer, Latham & Associates, Inc. Engineer•Architect 3901 Spring Hill Avenue West•Mobile.Alabama 36608•251/344-7073•FAX 251/343-9179 purpose unless located and arranged so the purpose is evident. [70:110.22] 11.1.9.3.2 The marking shall be of sufficient durability to withstand the environment involved. [70:110.22] The disconnecting means for this building will be located outside of the building (and is accessible) as indicated in the riser diagram on sheet E-3.1. Responses to Public Works Comments received 12-11-14 (Ricky Carper 904-247-5831) rcarper @coab.us 1. Provide copy of SJRWMD ERP modification application(42-031-37016-1)or new ERP application. Drainage calculations received but need copy of application. Acknowledged, we are currently working with SJRWMD on the pre-app process and will forward the application once we make the permit modification submittal. 2. Provide copy of FDOT ROW/Connection Permit to Public Works when received. Need copy of connection permit. Will forward once we have an approved permit. 3. Driveway profiles must be modified to show sidewalk cross slope at 2%max slope. Acknowledged, drives have been revised showing 2% max cross slope at sidewalk. Responses to Public Utilities Comments received 12-11-14 (Donna Kaluzniak 904-270-2535) dkaluzniakni coab.us 1. Drawing No. C-9.0—shows the sanitary sewer service to connect to the existing sewer main to the south of the building. I would suggest just connecting the building service to the existing sewer service rather than directly to the main—as the main is very deep (about 11 ft.). There is an existing cleanout about 115 LF from the west property line, so it should be fairly easy to connect to the existing service line. Acknowledged, plans revised showing the connection to the existing sanitary service. 2. Reduced pressure zone backflow preventers need to be installed on the customer side of both of the existing meters. The backflow preventers must be tested by a certified tester and a copy of the results sent to Malcolm Clemons at Public Works. Acknowledged, backflows have been added and labeled for both domestic and irrigation services. Responses to Zoning Comments received 12-22-14 (Derek Reeves 904-270-1605) dreeves @coab.us 1. Commercial Corridor Design Standards (Section 24-171): The exterior roof design does not meet the requirement for a roof that does not have the appearance of being flat. Please revise plans so that the roof has the appearance of a gable, hip, mansard or other design. Drawings have been revised to provide sloped surfaces and application for variance was submitted on 12-29. 2 Clark, Geer, Latham & Associates, Inc. Engineer•Architect 3901 Spring Hill Avenue West•Mobile.Alabama 36608•251/344-7073•FAX 251/343-9179 2. Landscaping: The gap between trees along Mayport Road exceeds the maximum of 75 feet. Please revise landscape plans. The Landscape Plans have been revised - Added one tree along Mayport Road Buffer to decrease gap as requested. 3. Signage: All signage is to be permitted separately. Acknowledged 4. Bicycle Parking: The Community Development Board asked about additional bicycle parking during the variance hearing for additional surface parking. Perhaps some more could be included. Bike rack callout has been revised to clearly call out a 6 bike capacity. Please feel free to call if you have any questions regarding these responses. Thank you, Mark M. Aldred,AIA 3 City of Atlantic peach APPLICATION NUMBER 4 r Building Department (To be 77d h Y P Pull in,DepartenI) Atlantic Beach, Florida 32233-5445 _ Phone(904)247.5825 • fax(9041)217 5R/1 (�/ s:; E-mail. building-dept( coab.us Date routed: 4/ 7 City web-site htt)//www coab.us I MEW APPILICATION REVIEW AND Tl I1 ACKfNG FQ ,M Property Aciii ,-r.;5: 23 Z i 4 /.po e- 4 . ; - .r-n review required No =- ter. di�g ____1 ���tanning &Zonin.Appli ant: j trator_`---. .-_. e alo e � !i S a l .- � -- rif • ----- . ._._---- 4P.- ire Services Review fee $ Dept Signature Other Agency Review or Permit Required Review or Receipt of Permit Verified_By Date Florida Dept. of Environmental Protection - Florida Dept. of Transportation_ St.Johns River Water Management District I Army Corps of Engineers Division of Hotels and Restaurants ■� Division of Alcoholic Beverages and Tobacco Other. • APPLICATION STATUS — . .__� Reviewing Department i first Review: pproved --`-- (Circle one.) Comments: Denied —� BUILDING PLANNING&ZONING Reviewed by: 1h�1.,I 111 0 j TREE ADMIN _ Date: �' s� Second Review: Approved as revise:0 I en ied - PUBLIC WORKS Comments: 1 PUBLIC UTILITIES 1 PUBLIC SAFETY Reviewed by: - Date: I FIRE SERVICES Third Review: ``- --�� r ['Approved as revised- ❑Denied. i Comments: I I Reviewed by: — ----- - _ - area— I used 07/27/10 / MECHANICAL PERMIT APPLICATION 1 g M7 1 CITY OF ATLANTIC BEACH APR 0 J 800 Seminole Rd Atlantic Beach, FL 32233 Ph (904) 247-5826 Fax (904)247-5845 ,� l By— JOB ADDRESS: /"t 232 / A -Po' T e A..6 Ar,AIJnC ca a PERMIT# /y 1et/3 322 33 PROJECT VALUE $ ARI# REQUIRED Air Handling Equipment Only Air Handling Unit & Condenser Condenser Only NEW AIR CONDITIONING & HEATING SYSTEM INSTALLATION Air Conditioning: Unit Quantity Tons Per Unit Heat: Unit Quantity BTU's Per Unit Seer Rating Duct Systems: Total CFM REQUIRED REPLACEMENT AIR CONDITIONING & HEATING SYSTEM INSTALLATION Air Conditioning: Unit Quantity Tons Per Unit Heat: Unit Quantity BTU's Per Unit Seer Rating Duct Systems: Total CFM REQUIRED FIRE PREVENTION Fire Sprinkler System Quantity 3 (Requires 3 sets of plans) Fire Standpipe Quantity (Requires 3 sets of plans) Underground Fire Main Value (Requires 3 sets of plans) Fire Hose Cabinets Quantity (Requires 3 sets of plans) Commercial Hoods Quantity (Requires 3 sets of plans) Fire Suppression Systems Quantity (Requires 3 sets of plans) FIRE PLACES MISCELLANEOUS: Prefabricated Fireplace Qty Automobile Lifts Gas Piping Outlets _ Boilers BTU's Elevators/Escalators ALL OTHER GAS PIPING Heat Exchanger Quantity of Outlets Pumps # Vented Wall Furnaces Refrigerator Condenser BTU's #Water Heaters Solar Collection Systems Tanks (gallons) Wells OTHER: Permit becomes void if work does not commence within a six month period or work is suspended or abandoned for six months. I hereby certify that I have read this application and know the same to be true and correct. All provisions of laws and ordinances governing this work will be complied with whether specified or not. The permit does not give authority to violate the provisions of any other state or local law regulation construction or the performance of construction. Property Owners Name_b. 60600 &s fi�-fy C AC7eniT Phone Number 75.7-3 3 3-rq$�f Mechanical Company ',fayw6 Au/ omtaw. --t/ u4L 3 At-Office PhoneA8-3030 Fax_I&R-OliSt L ' Co. Address: 113 Ze tisiglet flo,) 4v W. City JAc itQ41/u►E State aC Zip 32?5re License Holder (Print): Weaver E. au/et-soy) State Certification/Re istrati n# Notarized Signature o f License Holder a ee.__� .-,„, / o � DU — / j 7 •1. , DAWN MARIE AREZZI 74.4 t NOTARY PUBLIC Before me this ,3rd day of r/L 20 /5 =STATE OF FLORIDA / / / ' / . ...• -I Comm#FFO7S1O3 Signature of Notary Public A�.. __ .1 1 • -- - #;�;i Expires 12/25/2017 SECOND REVISION TO CONSTRUCTION (SLM REVISION #5) of Plans and Specifications for Dollar Tree—Atlantic Beach, FL CGL Project 1405-137 March 30th, 2015 Clark, Geer, Latham & Associates, Inc. Mobile, Alabama NOTE: Second Revision to Construction contains SLM Revision #5 to the specifications & or drawings as listed below. Changes to the above referenced project have been made that include, but are not limited to the following. Reference specifications & or drawings included in this addendum for changes. The plans for the above referenced project shall be amended to include: 1. Drawing C-2.0 has been revised and dated 2/12/15. SLM Revision#5 includes the following: A. Revised per FDOT comments. 2. Drawing C-3.0 has been revised and dated 2/12/15. SLM Revision#5 includes the following: A. Revised per FDOT comments. 3. Drawing C-4.0 has been revised and dated 2/12/15. SLM Revision#5 includes the following: A. Revised per FDOT comments. 4. Drawing C-5.0 has been revised and dated 2/12/15. SLM Revision#5 includes the following: A. Revised per FDOT comments. 5. Drawing C-6.0 has been revised and dated 2/12/15. SLM Revision#5 includes the following: A. Revised per FDOT comments. 6. Drawing C-7.0 has been revised and dated 2/12/15. SLM Revision #5 includes the following: A. Revised per FDOT comments. 7. Drawing C-8.0 has been revised and dated 2/12/15. SLM Revision#5 includes the following: A. Revised per FDOT comments. 8. Drawing C-9.0 has been revised and dated 2/12/15. SLM Revision#5 includes the following: A. Revised per FDOT comments. B. Revised per fire comments dated 2-10. Page 1 of 2 SECOND REVISION TO CONSTRUCTION (SLM REVISION #5) of cm/ Plans and Specifications for Dollar Tree—Atlantic Beach, FL CGL Project 1405-137 March 30`", 2015 Clark, Geer, Latham & Associates, Inc. Mobile, Alabama 9. Drawing C-11.0 has been revised and dated 2/12/15. SLM Revision#5 includes the following: A. Revised per FDOT comments. 10. Drawing FP-1.1 has been revised and dated 3/27/15. SLM Revision#5 includes the following: A. Revised per fire comments dated 2-10. Second Revision to Construction was distributed March 30, 2015 End of Second Revision to Construction Page 2 of 2 Clark, Geer, Latham & Associates, Inc. Engineer•Architect 3901 Spring Hill Avenue West•Mobile,Alabama 36608.251/344-7073•FAX 251/343-9179 City of Atlantic Beach Building Permit Division 800 Seminole Road Atlantic Beach, FL 32233 Attn: Bob Ratliff Subject: Dollar Tree—Atlantic Beach, FL Date: 3-30-15 Permit#: 14CNEW536 To those it may concern, The following is a list of responses to the 4th submittal comment letter we received. Responses to Fire Marshal Comments received 2-10-15 (Bob Ratliff 904-255-8320) rescanioncoj.net 1. Water Based Fire Protection Systems include, but are not limited to, automatic sprinkler systems of wet, dry, fine water spray (mist), manual, and deluge valve controlled types, pumping systems, standpipes, fire water mains and dedicated fire protection water sources. Sprinkler system is wet pipe, NFPA 13, Ordinary Hazard Group 2. This is indicated in Notes 3 & 9 on Drawing FP-1.1 2. To ensure minimum design quality in Fire Protection System Engineering Documents, said documents shall include as a minimum the following information when applicable: a. The Point of Service for the fire protection water supply as defined by Section 633.021(18), F.S. Per City of Atlantic Beach the Point of Service is at the easement line since the existing 8" PVC is on our property. The Point of Service has been labeled on the revised sheet C-9.0 b. Applicable NFPA standard to be applied, or in the case where no such standard exists, the engineering study,judgments, and/or performance based analysis and conclusions. The required standard is NFPA 13, Ordinary Hazard, Group 2. This is reflected in Note 9 on drawing FP-1.1. c. Classification of hazard occupancy for each room or area. The space is mercantile occupancy. Both the sales are and the stock area are Ordinary Hazard, Group 2 per NFPA 13 requirements. The stock area does not have racking or other storage over 8 feet high or require additional care. 1 Clark, Geer, Latham & Associates, Inc. Engineer•Architect 3901 Spring Hill Avenue West•Mobile,Alabama 36608.251/344-7073•FAX 251/343-9179 d. Design approach, which includes system type, densities, device temperature rating, and spacing for each separate hazard occupancy. The Density requirements are indicated on drawing FP-1.1, note 9 for maximum 130 sq. ft. head coverage. Sprinkler performance information is also included accordingly. e. Characteristics of water supply to be used, such as main size and location, whether it is dead-end or circulating; and if dead-end, the distance to the nearest circulating main, as well as its minimum duration and reliability for the most hydraulically demanding design area. The existing water main is 8" PVC circulating, approximately 36.5' east of the existing concrete sidewalk as shown on the plans. Water service is provided by the existing 8 inch Utility main along the street. The site is not a dead end, see drawing C-9.0. The municipal water supply maintains capacity to address the 90 minute duration noted on drawing FP-1.1, Note 9. With the Ordinary 2 hazard, preliminary hydraulic calculations would require 39 PSI at 300 GPM to serve the sprinkler system. The preliminary calculations have been added to drawing FP-1.1. f. When private or public water supplies are used, the flow test data, including date and time of test, who conducted test or supplied information, test elevation, static gauge pressure at no flow, flow rate with residual gauge pressure, hydrant butt coefficient, and location of test in relation to the hydraulic point of service. Water flow and pressure information is included on drawing C-9.0. g. Valving and alarm requirements to minimize potential for impairments and unrecognized flow of water. Alarm valve requirements have been added to drawing FP-1.1. h. Microbial Induced Corrosion (MIC). The Engineer of Record shall make reasonable efforts to identify water supplies that could lead to Microbial Induced Corrosion (MIC). Such efforts may consist of discussions with the local water purveyor and/or fire official, familiarity with conditions in the local area, or laboratory testing of water supplies. When conditions are found that may result in MIC contamination of the fire protection piping, the engineer shall design corrective measures. Water supply for the sprinkler system is provided from the Floridan Aquifer. Currently there are no known concerns from the utility for Microbial Induced Corrosion (MIC). i. Backflow prevention and metering specifications and details to meet local water purveyor requirements including maximum allowable pressure drop. See details drawings C-9.0 and drawing FP-1.1. 2 Clark, Geer, Latham & Associates, Inc. Engineer•Architect 3901 Spring Hill Avenue West•Mobile,Alabama 36608•251/344-7073•FAX 251/343-9179 j. Quality and performance specifications of all yard and interior fire protection components. Interior piping will be black carbon steel per NFPA 13, Schedule 10 for distribution as noted on FP-1.1. Exterior piping will be C900 PVC as indicate on drawing C-9.0. All components shall conform to NFPA 13 and local requirements as noted on drawing FP-1.1, notes 3, 6, & 7. 3. Contractor submittals which deviate from the above minimum design parameters shall be considered material deviations and require supplemental engineering approval and documentation. Acknowledged 4. In the event the Engineer of Record provides more information and direction than is established above, he or she shall be held responsible for the technical accuracy of the work in accordance with applicable codes, standards, and sound engineering principles. Acknowledged Please feel free to call if you have any questions regarding these responses. Thank you, / ,1'1 Mark M. Aldred, AIA 3 Ratliff, Bob To: 'Graham, Shirley' Cc: 'Hubsch,Jeremy'; 'Walker,Jennifer; 'Arlington, Daniel'; 'Jones, Mike' Subject: RE: 2321 Mayport Road Dollar Tree Shirley, The plans for this project have been reviewed with the following comments: 1. Provide Fire Hydrant within 500'of remote point of building 2. Minimum required fire flow of 1500 gpm @ 20 psi required 3. Provide Tactile Signage at each exit NFPA 101 -7.10.1.3 Exit Door Tactile Signage.Tactile signage shall be provided to meet the following criteria, unless otherwise provided in 7.10.1.4: (1)Tactile signage shall be located at each exit door requiring an exit sign. (2)Tactile signage shall read as follows: EXIT. (3)Tactile signage shall comply with ICC/ANSI A117.1,American National Standard for Accessible and Usable Buildings and Facilities. 4. Page E-1.2 Indicates a fire alarm system for this building.The fire alarm system requires a separate plan review and permit as well as the design criteria submitted per Florida Administrative Code 61G15-32.008 Design of Fire Alarms and Detection Systems. I hope to have the plans returned before you close this afternoon. Thanks, Mali 3305 %, CFPS Jacksonville Fire& Rescue Department Fire Prevention Division Office of Plan Review 214 N. Hogan Street Room 281 Jacksonville, FL 32202 (904) 255-8320 Office (904) 255-8559 Fax CONFIDENTIALITY NOTICE Please note that under Florida's very broad public records law,e-mail communications to and from city officials are subject to public disclosure. 1 Graham, Shirley From: Ratliff, Bob [BRatliff @coj.net] Sent: Tuesday, February 10, 2015 1:02 PM To: Graham, Shirley; Johnson, Charles Cc: Walker, Jennifer; Jones, Mike; Hubsch, Jeremy; Arlington, Daniel Subject: Design Criteria for Dollar Tree Attachments: a-j criteria.doc Shirley, The plans that were picked up yesterday by Lt.Johnson do not meet the requirements for the attached design criteria required by the Florida Administrative Code. If you have an email address for the engineer,can you forward this information for their attention. Thank you, Captain 34 1Rat&i1(, CFPS Jacksonville Fire& Rescue Department Fire Prevention Division Office of Plan Review 214 N. Hogan Street Room 281 Jacksonville, FL 32202 (904) 255-8320 Office (904) 255-8559 Fax CONFIDENTIALITY NOTICE: Please note that under Florida's very broad public records law,e-mail communications to and from city officials are subject to public disclosure. Connect with Mayor Brown and the City of Jacksonville! For general information, contact 630-CITY(2489). View our calendar, sign up for newsletters or learn about volunteer opportunities. ***Please note that under Florida's very broad public records law, email communications to and from city officials are subject to public disclosure. *** 1 Clark, Geer, Latham & Associates, Inc. Engineer•Architect 3901 Spring Hill Avenue West•Mobile,Alabama 36608•251/344-7073•FAX 251/343-9179 City of Atlantic Beach Building Permit Division 800 Seminole Road Atlantic Beach, FL 32233 Attn: Rey Escanio, Ricky Carper, & Derek Reeves n jl�j Subject: Dollar Tree—Atlantic Beach, FL D 11 U - Date: 2-5-15 Permit#: 14CNEW536 FE' 9 To those it may concern, By__._____ _ The following is a list of responses to the 2nd submittal comment letter we received. Responses to Fire Marshal Comments received 2-4-15 (Rey Escanio 904-255-8561) rescanio@coj.net 1. Provide design criteria for fire sprinkler system FAC 61615-32. Sheet FP-1.1 has been added to show intent. Responses to Public Works Comments received 1-20-15 (Ricky Carper 904-247-5831) rcarper @coab.us 1. Provide copy of SJRWMD ERP modification application (42-031-37016-1) or new ERP application. Drainage calculations received but need copy of application. Will forward once we have an approved permit. 2. Provide copy of FDOT ROW/Connection Permit to Public Works when received. Need copy of connection permit. Will forward once we have an approved permit. Please feel free to call if you have any questions regarding these responses. Thank you, Mark M. Aldred, AIA 1 )ôii 7eEE ,,,,)3,2 i /ThA 0 arr Pd CLARK,GEE E, ATHAM ASSOCIATES,INC. Engineers-Ar chitects LLIE U TW UI OF Inultvis EillOTTa 3901 Springhill Avenue Mobile,Alabama 36608 DATE JON NO.JL1I www.cglengineers.com — 5— 5 (251)344-7073 FAX(251)343-9179 ATTIMTSOM ; •• • ' .v t '1 n`_L TO ( ,11-y /c , L' `, No.\) 11 N 1 e. 141144kL NoLizi\ �;-' -- '� " WE ARE SENDING YOU ❑ Attached ❑ Under separate cover via the following items: ❑ Shop drawings ❑ Prints ❑ Plans ❑ Samples ❑ Sp•cifications ❑ Copy of letter ❑ Change order ❑ • COPIES DATE NO. DESCRIPTION 5 CD� . s 1/,-la 5 d i (I 5 .fits ..5 iwi -4I chis S ,• • It 2_ n--% 47 5 At. dungy -r-� 3 i /V— /1/ i() — 6 -3 , THESE ARE TRANSMITTED as checked below: yFor Approval ❑ Furnish as submitted ❑ Resubmit copies for review ❑ For you use ❑ Furnish as noteo ❑ Submit copies for distribution ❑ As requested ❑ Returned for corrections ❑ Return corrected prints ❑ For review and comment ❑ ❑ FOR BIDS DUE 20 ❑ PRINTS RETURNED AFTER LOAN TO US REMARKS COPY TO / / SIGNED: I/ II •nelosurel are not •s noted. kindly notify u• •It once. -P&P?! IT' 4-4 l4^ ^/f hl- S3 ADDENDUM #1 (SLM REVISION #1) of Plans and Specifications for Dollar Tree—Atlantic Beach, FL CGL Project 1405-137 December 12`h, 2014 Clark, Geer, Latham & Associates, Inc. Mobile, Alabama NOTE: Addendum#1 contains SLM Revision#1 to the specifications& or drawings as listed below. Changes to the above referenced project have been made that include, but are not limited to the following. Reference specifications& or drawings included in this addendum for changes. The following are clarifications to the plans and specifications for the above referenced project: 1. The bid date is being extended to December 23rd, 2014 to allow for the bidding of items added in this addendum. 2. Removal & fill of the underground storage tanks will be done by the current owner and will not be a part of this contract. The specifications for the above referenced project shall be amended to include: 1. See the FRONT END DOCUMENTS: A. Refer to page B1 Invitation for Bids: On line 2 of the second paragraph, Delete: December 17, 2014 Replace with: December 23, 2014 See attached for full revised section FRONT END DOCUMENTS The plans for the above referenced project shall be amended to include: 1. Drawing C-2.0 has been revised and dated 12/12/14. SLM Revision#1 includes the following: A. Added note clarifying removal of UST. 2. Drawing C-4.1 has been revised and dated 12/12/14. SLM Revision#1 includes the following: A. Added canopies & removed wall packs per planning comment. 3. Drawing C-7.0 has been revised and dated 12/12/14. SLM Revision#1 includes the following: A. Revised the friction course from type S-III to SP-9.5 on the asphalt pavement section for clarity. B. Revised the detention basin control structure and underdrain inverts per SJRWMD comment. Page 1 of 3 ADDENDUM #1 (SLM REVISION #1) of Plans and Specifications for Dollar Tree—Atlantic Beach, FL CGL Project 1405-137 December 12th, 2014 Clark, Geer, Latham & Associates, Inc. Mobile, Alabama 4. Drawing C-8.0 has been revised and dated 12/12/14. SLM Revision#1 includes the following: A. Revised cross sections A-A, B-B, & D-D per public works comment #3. B. Added underdrain detail per SJRWMD comment. 5. Drawing C-9.0 has been revised and dated 12/12/14. SLM Revision#1 includes the following: A. Added backflow preventers and connection note for the water service per public utilities comment#2. B. Revised the sanitary service to connect to the existing lateral clean out per public utilities comment#1. 6. Drawing S-2.0 has been revised and dated 12/12/14. SLM Revision#1 includes the following: A. Added blocking for canopies per planning comment. B. Corrected grids and dimensions on framing elevation at gridline 5 7. Drawing A-1.0 has been revised and dated 12/12/14. SLM Revision#1 includes the following: A. Added canopies per planning comment. 8. Drawing A-1.1 has been revised and dated 12/12/14. SLM Revision #1 includes the following: A. Added canopies per planning comment. 9. Drawing A-1.2 has been revised and dated 12/12/14. SLM Revision#1 includes the following: A. Added canopies per planning comment. 10. Drawing A-1.3 has been revised and dated 12/12/14. SLM Revision #1 includes the following: A. Added canopies per planning comment. 11. Drawing A-2.0 has been revised and dated 12/12/14. SLM Revision#1 includes the following: A. Added canopies& feaux storefront per planning comment. Page 2 of 3 ADDENDUM #1 (SLM REVISION #1) of C„ Plans and Specifications for Dollar Tree—Atlantic Beach, FL CGL Project 1405-137 December 12`", 2014 Clark, Geer, Latham & Associates, Inc. Mobile, Alabama 12. Drawing A-2.6 has been revised and dated 12/12/14. SLM Revision#1 includes the following: A. Added Maltese Cross signage to storefront per city fire comment#5. 13. Drawing A-3.0 has been revised and dated 12/12/14. SLM Revision#1 includes the following: A. Added blocking for canopies per planning comment. 14. Drawing A-3.1 has been revised and dated 12/12/14. SLM Revision#1 includes the following: A. Added note 15 & detail B per city fire comment#4. B. Revised door note 9 per fire comment#5. 15. Drawing A-4.1 has been revised and dated 12/12/14. SLM Revision#1 includes the following: A. Added canopy & feaux storefront per planning comment. 16. Drawing A-5.0 has been revised and dated 12/12/14. SLM Revision#1 includes the following: A. Added canopies per planning comment. Addendum#1 was distributed December 12, 2014 End of Addendum#1 Page 3 of 3 ADDENDUM #2 (SLM REVISION #2) of Plans and Specifications for Dollar Tree—Atlantic Beach, FL CGL Project 1405-137 December 30`", 2014 Clark, Geer, Latham &Associates, Inc. Mobile, Alabama NOTE: Addendum #2 contains SLM Revision#2 to the specifications & or drawings as listed below. Changes to the above referenced project have been made that include,but are not limited to the following. Reference specifications & or drawings included in this addendum for changes. The plans for the above referenced project shall be amended to include: 1. Drawing C-4.0 has been revised and dated 12/30/14. SLM Revision#2 includes the following: A. Revised bike rack note to clearly label capacity per zoning comment #4. 2. Drawing C-5.0 has been revised and dated 12/30/14. SLM Revision#2 includes the following: A. Revised bike rack detail for clarity. 3. Drawing L-1.0 has been revised and dated 12/30/14. SLM Revision#2 includes the following: A. Added tree per zoning comment#2. 4. Drawing L-3.0 has been revised and dated 12/30/14. SLM Revision#2 includes the following: A. Added irrigation for new tree per zoning comment#2. 5. Drawing L-4.0 has been revised and dated 12/30/14. SLM Revision#2 includes the following: A. Added irrigation for new tree per zoning comment#2. 6. Drawing ES-1.1 has been revised and dated 12/30/14. SLM Revision#2 includes the following: A. Removed wall packs to match photometrics revised in Addendum#1 per zoning comment#1. Addendum #2 was distributed December 30, 2014 End of Addendum #2 Page 1 of 1 Clark, Geer, Latham & Associates, Inc. Engineer•Architect 3901 Spring Hill Avenue West•Mobile,Alabama 36608•251/344-7073•FAX 251/343-9179 City of Atlantic Beach Building Permit Division 800 Seminole Road Atlantic Beach, FL 32233 Attn: Rey Escanio, Ricky Carper, Donna Kaluzniak, & Derek Reeves Subject: Dollar Tree—Atlantic Beach, FL Date: 12-30-14 Permit#: 14CNEW536 To those it may concern, The following is a list of responses to the 1st submittal comment letter we received. Responses to Fire Marshal Comments received 12-11-14 (Rev Escanio 904-255-8561) rescanio @coj.net 1. When resubmitting corrected sheets, please provide a written narrative letter responding to our comments, along with clouded areas on revised sheets clearly showing areas where changes or corrections have occurred. Will provide 2. Please provide proof of meeting minimum required fire flow requirements for proposed building per NFPA 1 18.4 and Table 18.4.5.1.2. This can be accomplished by contacting JEA and obtain hydrant flow test information conducted within the last 12 months and providing report with next submission. Flow data can also be obtained by private provider as long as it is witnessed by our office. The flow test has been scheduled with the City of Atlantic Beach, reports to be submitted after completion. 3. Provide the fire alarm design criteria per FAC 61G15-32.008(a-o). Fire alarm design shall be a deferred submittal to be provided by the GC. 4. Provide exit door tactile signage (Braille) per N.F.P.A. 101, 7.10.1.3. Signage is shown on sheet A-3.1, elevation B. 5. Provide light-frame truss-type construction identification signage per FAC 69A-60.0081 or written verification from a licensed architect or engineer stating that such structure does not meet the definition of 69A-60.0081. Signage is shown on sheets A-2.6 & A-3.1. 6. NFPA 101-11.1.9.1* Means shall be provided for the fire department to disconnect the electrical service to a building, structure, or facility when the electrical installation is covered under the scope of NFPA 70. 11.1.9.2 The disconnecting means shall be maintained accessible to the fire department. 11.1.9.3 Identification of Disconnecting Means. 11.1.9.3.1 Each disconnecting means shall be legibly marked to indicate its 1 P ;, Clark, Geer, Latham & Associates, Inc. Engineer•Architect 3901 Spring Hill Avenue West•Mobile,Alabama 36608•251/344-7073•FAX 251/343-9179 purpose unless located and arranged so the purpose is evident. [70:110.22] 11.1.9.3.2 The marking shall be of sufficient durability to withstand the environment involved. [70:110.22] The disconnecting means for this building will be located outside of the building (and is accessible) as indicated in the riser diagram on sheet E-3.1. Responses to Public Works Comments received 12-11-14 (Ricky Carper 904-247-5831) rcarper @coab.us 1. Provide copy of SJRWMD ERP modification application(42-031-37016-1)or new ERP application. Drainage calculations received but need copy of application. Acknowledged,we are currently working with SJRWMD on the pre-app process and will forward the application once we make the permit modification submittal. 2. Provide copy of FDOT ROW/Connection Permit to Public Works when received. Need copy of connection permit. Will forward once we have an approved permit. 3. Driveway profiles must be modified to show sidewalk cross slope at 2%max slope. Acknowledged, drives have been revised showing 2% max cross slope at sidewalk. Responses to Public Utilities Comments received 12-11-14 (Donna Kaluzniak 904-270-2535) dkaluzniak @coab.us 1. Drawing No. C-9.0—shows the sanitary sewer service to connect to the existing sewer main to the south of the building. I would suggest just connecting the building service to the existing sewer service rather than directly to the main—as the main is very deep (about 11 ft.). There is an existing cleanout about 115 LF from the west property line, so it should be fairly easy to connect to the existing service line. Acknowledged, plans revised showing the connection to the existing sanitary service. 2. Reduced pressure zone backflow preventers need to be installed on the customer side of both of the existing meters. The backflow preventers must be tested by a certified tester and a copy of the results sent to Malcolm Clemons at Public Works. Acknowledged, backflows have been added and labeled for both domestic and irrigation services. Responses to Zoning Comments received 12-22-14 (Derek Reeves 904-270-1605) dreeves @coab.us 1. Commercial Corridor Design Standards(Section 24-171): The exterior roof design does not meet the requirement for a roof that does not have the appearance of being flat. Please revise plans so that the roof has the appearance of a gable,hip, mansard or other design. Drawings have been revised to provide sloped surfaces and application for variance was submitted on 12-29. 2 Clark, Geer, Latham & Associates, Inc. Engineer•Architect 3901 Spring Hill Avenue West•Mobile,Alabama 36608•251/344-7073•FAX 251/343-9179 2. Landscaping: The gap between trees along Mayport Road exceeds the maximum of 75 feet. Please revise landscape plans. The Landscape Plans have been revised - Added one tree along Mayport Road Buffer to decrease gap as requested. 3. Signage: All signage is to be permitted separately. Acknowledged 4. Bicycle Parking: The Community Development Board asked about additional bicycle parking during the variance hearing for additional surface parking. Perhaps some more could be included. Bike rack callout has been revised to clearly call out a 6 bike capacity. Please feel free to call if you have any questions regarding these responses. Thank you, kikkAA, Mark M. Aldred, AIA 3 • r ADDENDUM #3 (SLM REVISION #3) of Plans and Specifications for Dollar Tree—Atlantic Beach, FL CGL Project 1405-137 February 2"d, 2015 Clark, Geer, Latham & Associates, Inc. Mobile, Alabama NOTE: Addendum#3 contains SLM Revision#3 to the specifications & or drawings as listed below. Changes to the above referenced project have been made that include, but are not limited to the following. Reference specifications & or drawings included in this addendum for changes. The plans for the above referenced project shall be amended to include: 1. Drawing T-1 has been revised and dated 1/30/15. SLM Revision#3 includes the following: A. Showed protected building per fire comment#1. 2. Drawing TT=3 has been revised and dated 1/30/15. SLM Revision#3 includes the following: A. Added fire sprinkler per fire comment#1. 3. Drawing C-9.0 has been revised and dated 1/30/15. SLM Revision #3 includes the following: A. Added fire line &hydrant per fire comment#1. 4. Drawing S-2.0 has been revised and dated 1/30/15. SLM Revision#3 includes the following: A. Raised center bay of side parapets per zoning comment#1. 5. Drawing S-3.0 has been revised and dated 1/30/15. SLM Revision #3 includes the following: A. Raised T.O parapet in section F per zoning comment#1. 6. Drawing A-1.0 has been revised and dated 1/30/15. SLM Revision#3 includes the following: A. Added fire sprinkler per fire comment#1. 7. Drawing A-1.1 has been revised and dated 1/30/15. SLM Revision#3 includes the following: A. Added fire sprinkler per fire comment#1. B. Relocated mop sink per changes related to new fire sprinkler per fire comment#1. 4 Page 1 of 3 ADDENDUM #3 (SLM REVISION #3) of Plans and Specifications for Dollar Tree—Atlantic Beach, FL CGL Project 1405-137 February 2nd, 2015 Clark, Geer, Latham & Associates, Inc. Mobile, Alabama 16. Drawing MP-3.1 has been revised and dated 1/30/15. SLM Revision#3 includes the following: A. Added sprinkler riser diagram & sprinkler intent notes per fire comment#1. 17. Drawing E-1.1 has been revised and dated 1/30/15. SLM Revision#3 includes the following: A. Revised background fire comment#1. 18. Drawing E-1.2 has been revised and dated 1/30/15. SLM Revision#3 includes the following: A. Added fire alarm criteria per fire comment#2. Addendum #3 was distributed February 2, 2015 End of Addendum#3 Page 3 of 3 Clark, Geer, Latham & Associates, Inc. Engineer•Architect 3901 Spring Hill Avenue West•Mobile,Alabama 36608•251/344-7073•FAX 251/343-9179 City of Atlantic Beach Building Permit Division 800 Seminole Road Atlantic Beach, FL 32233 Attn: Rey Escanio, Ricky Carper, &Derek Reeves Subject: Dollar Tree—Atlantic Beach, FL Date: 1-30-15 Permit#: 14CNEW536 To those it may concern, The following is a list of responses to the 2nd submittal comment letter we received. Responses to Fire Marshal Comments received 1-8-15 (Rev Escanio 904-255-8561) rescanio @coj.net 1. Please provide proof of meeting minimum required fire flow requirements for proposed building per NFPA 1 18.4 and Table 18.4.5.1.2. This can be accomplished by contacting JEA and obtain hydrant flow test information conducted within the last 12 months and providing report with next submission. Flow data can also be obtained by private provider as long as it is witnessed by our office. See attached flow test results. We have revised to include a sprinkler system as required by NFPA Table 18.4.5.1.2 for a flow of less than 2250. 2. Provide the fire alarm design criteria per FAC 61G15-32.008(a-o). Your plans will not be approved without the fire alarm design criteria. We are not asking for shop drawings at this time,just answers to the criteria presented in the A-0. The fire alarm design on sheet E-1.2 has been revised to address the criteria from FAC 61G15-32.008(a-o) Responses to Public Works Comments received 1-20-15 (Ricky Carper 904-247-5831) rcarper@,coab.us 1. Provide copy of SJRWMD ERP modification application (42-031-37016-1) or new ERP application. Drainage calculations received but need copy of application. Will forward once we have an approved permit. 2. Provide copy of FDOT ROW/Connection Permit to Public Works when received. Need copy of connection permit. Will forward once we have an approved permit. 1 Clark, Geer, Latham & Associates, Inc. Engineer•Architect 3901 Spring Hill Avenue West•Mobile,Alabama 36608•251/344-7073•FAX 251/343-9179 Responses to Zoning Comments received 1-20-15 (Derek Reeves 904-270-1605) dreeves @coab.us 1. Commercial Corridor Design Standards (Section 24-171): The exterior roof design does not meet the requirement for a roof that does not have the appearance of being flat. Please revise plans so that the roof has the appearance of a gable, hip, mansard or other design. Drawings have been revised as requested at the 1-20-15 variance meeting. Please feel free to call if you have any questions regarding these responses. Thank you, • 1 ' Mark M. Aldred, AIA 2 ,s :1 •:)% ri �Jfi >r January 12, 2015 • Mr. Darren Eyre, P.E. Thomas Engineering RE: Fire Flow Test for Dollar Tree - 2321 Mayport Rd. Dear Mr. Loretta: Per your request, the City flow tested the above fire hydrant with the following results: Location: 2389 Mayport Rd. Tested by: Chris Walker, Division Director Test Date: 1/12/15 Test Time: 9:46 AM Port Diameter: 2.5-inch port Static Pressure: 42 psi Residual Pressure: 35 psi Test Flow Rate: 1,000 gpm The following computational results based on the above variables and NFPA section 291 (2002 edition) are as follows: 1/12/15 - Estimated flow at 20 psi: 1,856 gpm Should you need additional information, please call me at(904) 270-2535 or email me at dkaluzniak@tcoab.us. Sincerely, Donna Kaluzniak Utility Director cc: Chris Walker, Division Director Public Utilities Department 1200 Sandpiper Lane Atlantic Beach, FL 32233 (904) 247-5834 p SECOND REVISION TO CONSTRUCTION (SLM REVISION #5) of qd , Plans and Specifications for Dollar Tree–Atlantic Beach, FL CGL Project 1405-137 March 30th, 2015 Clark, Geer, Latham & Associates, Inc. Mobile, Alabama NOTE: Second Revision to Construction contains SLM Revision#5 to the specifications & or drawings as listed below. Changes to the above re -renced •roject have been made that include, but are not limited to the following. Ref ce t ? �' Q g Vii :. , lye � specifications & or drawings included in this addendum for changes. 1) 41?,R Q , The plans for the above referenced project shall be amended to includ . ' J 1. Drawing C-2.0 has been revised and dated 2/12/15. SLM .6y__ ' - -5.1- — includes the following: A. Revised per FDOT comments. 2. Drawing C-3.0 has been revised and dated 2/12/15. SLM Revision#5 includes the following: A. Revised per FDOT comments. 3. Drawing C-4.0 has been revised and dated 2/12/15. SLM Revision#5 includes the following: A. Revised per FDOT comments. 4. Drawing C-5.0 has been revised and dated 2/12/15. SLM Revision#5 includes the following: A. Revised per FDOT comments. 5. Drawing C-6.0 has been revised and dated 2/12/15. SLM Revision#5 includes the following: A. Revised per FDOT comments. 6. Drawing C-7.0 has been revised and dated 2/12/15. SLM Revision#5 includes the following: A. Revised per FDOT comments. 7. Drawing C-8.0 has been revised and dated 2/12/15. SLM Revision#5 includes the following: A. Revised per FDOT comments. 8. Drawing C-9.0 has been revised and dated 2/12/15. SLM Revision#5 includes the following: A. Revised per FDOT comments. B. Revised per fire comments dated 2-10. Page 1 of 2 SECOND REVISION TO CONSTRUCTION (SLM REVISION #5) of Col Plans and Specifications for Dollar Tree—Atlantic Beach, FL CGL Project 1405-137 March 30t, 2015 Clark, Geer, Latham & Associates, Inc. Mobile, Alabama 9. Drawing C-11.0 has been revised and dated 2/12/15. SLM Revision#5 includes the following: A. Revised per FDOT comments. 10. Drawing FP-1.1 has been revised and dated 3/27/15. SLM Revision#5 includes the following: A. Revised per fire comments dated 2-10. Second Revision to Construction was distributed March 30, 2015 End of Second Revision to Construction Page 2 of 2 Clark, Geer, Latham & Associates, Inc. Engineer•Architect 3901 Spring Hill Avenue West•Mobile,Alabama 36608.251/344-7073•FAX 251/343-9179 City of Atlantic Beach Building Permit Division 800 Seminole Road Atlantic Beach, FL 32233 Attn: Bob Ratliff Subject: Dollar Tree—Atlantic Beach, FL Date: 3-30-15 Permit#: 14CNEW536 To those it may concern, The following is a list of responses to the 4`" submittal comment letter we received. Responses to Fire Marshal Comments received 2-10-15 (Bob Ratliff 904-255-8320) rescanio @coj.net 1. Water Based Fire Protection Systems include, but are not limited to, automatic sprinkler systems of wet, dry, fine water spray (mist), manual, and deluge valve controlled types, pumping systems, standpipes, fire water mains and dedicated fire protection water sources. Sprinkler system is wet pipe, NFPA 13, Ordinary Hazard Group 2. This is indicated in Notes 3 & 9 on Drawing FP-1.1 2. To ensure minimum design quality in Fire Protection System Engineering Documents, said documents shall include as a minimum the following information when applicable: a. The Point of Service for the fire protection water supply as defined by Section 633.021(18), F.S. Per City of Atlantic Beach the Point of Service is at the easement line since the existing 8" PVC is on our property. The Point of Service has been labeled on the revised sheet C-9.0 b. Applicable NFPA standard to be applied, or in the case where no such standard exists, the engineering study,judgments, and/or performance based analysis and conclusions. The required standard is NFPA 13, Ordinary Hazard, Group 2. This is reflected in Note 9 on drawing FP-1.1. c. Classification of hazard occupancy for each room or area. The space is mercantile occupancy. Both the sales are and the stock area are Ordinary Hazard, Group 2 per NFPA 13 requirements. The stock area does not have racking or other storage over 8 feet high or require additional care. 1 Clark, Geer, Latham & Associates, Inc. Engineer•Architect 3901 Spring Hill Avenue West•Mobile,Alabama 36608•251/344-7073•FAX 251/343-9179 d. Design approach,which includes system type,densities, device temperature rating, and spacing for each separate hazard occupancy. The Density requirements are indicated on drawing FP-1.1, note 9 for maximum 130 sq. ft. head coverage. Sprinkler performance information is also included accordingly. e. Characteristics of water supply to be used, such as main size and location, whether it is dead-end or circulating; and if dead-end, the distance to the nearest circulating main, as well as its minimum duration and reliability for the most hydraulically demanding design area. The existing water main is 8" PVC circulating, approximately 363' east of the existing concrete sidewalk as shown on the plans. Water service is provided by the existing 8 inch Utility main along the street. The site is not a dead end, see drawing C-9.0. The municipal water supply maintains capacity to address the 90 minute duration noted on drawing FP-1.1, Note 9. With the Ordinary 2 hazard, preliminary hydraulic calculations would require 39 PSI at 300 GPM to serve the sprinkler system. The preliminary calculations have been added to drawing FP-1.1. f. When private or public water supplies are used,the flow test data, including date and time of test,who conducted test or supplied information,test elevation, static gauge pressure at no flow,flow rate with residual gauge pressure,hydrant butt coefficient,and location of test in relation to the hydraulic point of service. Water flow and pressure information is included on drawing C-9.0. g. Valving and alarm requirements to minimize potential for impairments and unrecognized flow of water. Alarm valve requirements have been added to drawing FP-1.1. h. Microbial Induced Corrosion(MIC). The Engineer of Record shall make reasonable efforts to identify water supplies that could lead to Microbial Induced Corrosion(MIC). Such efforts may consist of discussions with the local water purveyor and/or fire official, familiarity with conditions in the local area,or laboratory testing of water supplies. When conditions are found that may result in MIC contamination of the fire protection piping,the engineer shall design corrective measures. Water supply for the sprinkler system is provided from the Floridan Aquifer. Currently there are no known concerns from the utility for Microbial Induced Corrosion (MIC). i. Backflow prevention and metering specifications and details to meet local water purveyor requirements including maximum allowable pressure drop. See details drawings C-9.0 and drawing FP-1.1. 2 ADDENDUM #3 (SLM REVISION #3) of Plans and Specifications for Dollar Tree-Atlantic Beach, FL CGL Project 1405-137 February 2"d,2015 Clark, Geer, Latham& Associates, Inc. Mobile,Alabama 8. Drawing A-1.2 has been revised and dated 1/30/15. SLM Revision #3 includes the following: A. Added mop sink wall per changes related to new fire sprinkler per fire comment#1. 9. Drawing A-1.3 has been revised and dated 1/30/15. SLM Revision#3 includes the following: A. Added fire sprinkler per fire comment#1. B. Relocated mop sink per changes related to new fire sprinkler per fire comment#1. 10. Drawing A-1.4 has been revised and dated 1/30/15. SLM Revision #3 includes the following: A. Added fire sprinkler per fire comment#1. B. Relocated mop sink per changes related to new fire sprinkler per fire comment#1. 11. Drawing A-2.0 has been revised and dated 1/30/15. SLM Revision#3 includes the following: A. Raised center bay of side parapets 2' per zoning comment#1. 12. Drawing A-2.4 has been revised and dated 1/30/15. SLM Revision#3 includes the following: A. Added fire sprinkler per fire comment#1. B. Revised mop sink&utility cabinet elevation per changes related to new fire sprinkler per fire comment#1. 13. Drawing A-4.1 has been revised and dated 1/30/15. SLM Revision#3 includes the following: A. Raised top of parapet 2' in wall section 2 per zoning comment#1. 14. Drawing A-5.0 has been revised and dated 1/30/15. SLM Revision#3 includes the following: A. Raised center bay of side parapets per zoning comment#1. 15. Drawing MP-1.1 has been revised and dated 1/30/15. SLM Revision#3 includes the following: A. Revised background per fire comment#1. Page 2 of 3 ADDENDUM #3 (SLM REVISION #3) of Plans and Specifications for Dollar Tree—Atlantic Beach, FL CGL Project 1405-137 February 2nd, 2015 Clark, Geer, Latham & Associates, Inc. Mobile, Alabama NOTE: Addendum#3 contains SLM Revision #3 to the specifications & or drawings as listed below. Changes to the above referenced project have been made that include, but are not limited to the following. Reference specifications & or drawings included in this addendum for changes. The plans for the above referenced project shall be amended to include: 1. Drawing TT=1 has been revised and dated 1/30/15. SLM Revision#3 includes the following: A. Showed protected building per fire comment#1. 2. Drawing TT=3 has been revised and dated 1/30/15. SLM Revision#3 includes the following: A. Added fire sprinkler per fire comment#1. 3. Drawing C-9.0 has been revised and dated 1/30/15. SLM Revision#3 includes the following: A. Added fire line & hydrant per fire comment#1. 4. Drawing S-2.0 has been revised and dated 1/30/15. SLM Revision #3 includes the following: A. Raised center bay of side parapets per zoning comment#1. 5. Drawing S-3.0 has been revised and dated 1/30/15. SLM Revision#3 includes the following: A. Raised T.O parapet in section F per zoning comment#1. 6. Drawing A-1.0 has been revised and dated 1/30/15. SLM Revision #3 includes the following: A. Added fire sprinkler per fire comment#1. 7. Drawing A-1.1 has been revised and dated 1/30/15. SLM Revision#3 includes the following: A. Added fire sprinkler per fire comment#1. B. Relocated mop sink per changes related to new fire sprinkler per fire comment#1. Page 1 of 3