2321 MAYPORT RD - EARLY POWER S
•j.
t, EARLY POWER AGREEMENT & RELEASE
CITY OF ATLANTIC BEACH
Electric power is requested now under the conditions and terms of this fully executed Agreement&Release
Job Address:el 3 2 I M Ay poR.T Roicb , 7`1ft 4-ic cts-k , FL 3ZR33
Permit No. 111 - C M E W - 536 Service Type(Circle One): Overhead Underground
We,the undersigned General Contractor and Electrician,understand and agree:
1. "Early Power" is purely for our construction convenience, it is not required by Codes and does not
substitute for Final Inspections or the C/O(Certificate of Occupancyjifiat must be issued before occupancy,
and as such is at the discretion of the Building Official.
2. The City of Atlantic Beach will make a special inspection prior to the early power energizing. All rough
inspections must have prior Approval, including meter base connections.
3. Occupancy or use of the new construction before a formal C/O constitutes fraudulent use of the early
electric service. Such action is expressly prohibited and penalized by The City of Atlantic Beach
Ordinances. A violation of this Agreement shall result in a request for prompt removal of electric service
after a twenty-four hour notice.
4. "Early Power"release authority is the Electrician and/or the Contractor and must not occur before:
a. Equipment,devices and fixtures are installed(or blanked off)safely.
b. Panel is complete with breakers and cover,and(labeling required at final inspection).
c. Service connection and grounding is complete.
d. The electric system has safely passed through electrical check.
e. Meter can is permanently marked with address.
f. Temporary address numbers displayed(Permanent numbers are required for C/O).
5. This fully completed form is to be submitted to the Building Department by hand,mail or fax.
6. Future such Agreements will not be accepted from those who violate any one of the above items.
CONTRACTOR DATE Y /z i/
PRINT NAME STEVEN RtttA! -- I`tUTTON Cand-RtAc.�/� /
ELECTRICIAN DATE G /A V T
fff
PRINT NAME Ai ( p, a.% 1-{-
800 Seminole Road,Atlantic Beach FL 32233
Phone:(904)247-5826 Fax:(904)247-5845 http://www.coab.us revised 01 30 09
,
LA.r7 r
i,, 800 Seminole Road
j4 s\ Atlantic Beach,Florida 32233
?,,:;' Telephone(904)247-5800
".-. '`F,s.1 FAX(904)247-5845
,_______..)
.47-pitIT-fl-
Minimum Requirements for Early Electrical Power Release
For Single-Family Dwellings
I. Form for "Early Power Agreement & Release" must be
completed.
II. Inspection Requirements:
1. Address numbers shall be posted per City Ordinance.
2. All entrances, exits, windows and garages doors must be
lockable.
3. All electrical circuits on exterior of building must
terminate in a weatherproof cover. Same applies to
disconnects. If circuits are at or above 7'-6" from grade
they may be capped and taped.
4. All electrical breakers must 1 ' ' "- A �-, 1,.1.-...,1, o„�^P
must be closed by a breaker
5. Interior wiring: All receptaci _ L �L eT must be terminated properly `l
from floor or mezzanine wh t✓k— �,1�,
of inspection must have an 2 N-(4.-`Z
Fixtures at or above 7'-6” m U K -�t
6. All smoke detectors must be
7. Sewer and water connection 8/2 6 //
approved. /
8. Exterior construction must 1
including stucco, siding, roc
9. All permit work must be su _