Loading...
Item 8A - Mayport Corridor CRA ContractAGENDA ITEM: SUBMITTED BY: DATE: BACKGROUND: CITY OF ATLANTIC BEACH C ITY COMMISSION MEETING STAFF REPORT Mayp ort Corrid or CRA Co ntra ct Jere my Hub sc h ;f/11 Bui lding and Zo nin g Director ( • f( Jun e 24, 20 15 AGENDA ITE M liSA JULY 13,20 15 The C it y of At lantic Beach propo ses to partn er with the firm VI-IB , th e Nor th eas t Florid a Regiona l Co un cil , and Steve Lindorff (form e r Jacksonv ill e Beach C RA Manage r) to create a CRA in the Mayport Corri dor. VHB is cmTe ntl y working o n a CRA for th e Mayport Village for t he C it y of Jack so nvill e. T he contract fo r th e Mayport Vill age CRA is $198 ,000, wh ile the p roposed fcc for th e Mayport Corrid o r CRA is $92,446 .67. The sco pe of wo rk for th e pr oposed Ma ypo rt Co rr id or CR/\ has been ta i lored to fit the nee ds of Atlan ti c Bea c h. T here we re tasks specific to th e May po rt Vill age CRA such as: environmental analys is, arc hit ec tur al rend erin gs, and deta il ed s ite s pec ifi c real esta te deve lopm e nt ana lys is th at are not as essenti al fo r the Mayport Corrid or CRA . The scope was somew hat scaled back as a resu lt. The Maypo rt Co rrid or CRA will a lso no t require as many su b cons ult ant s as the Mayport Village C RA . Additionally, th ere are so me tasks involved in th e Mayport Co rrid or CRA tha t VHB will be ab le to spend less tim e on due to th eir work on the Mayport Vill age CRA. As a re s ult of all of th ese facto rs, th e quote for the Mayp ort Corrid or CRA fo r Atlantic Beach is subs tanti all y less expens ive th an the Maypor t Vill age CRA. As a res ult o r the va lu e th e c ity is ge ttin g from the propose d Mayport Corrid o r CRA quote, the lo ca l knowledge VHB has gai ned fr om working on th e Maypo rt Village CRA , and th e fact tha t YHB wo n a competiti vely bid RFP (# 27-14) rr om Ja cksonville, th e Ci ty has not issued an RF P ror thi s project an d hopes to move fo rw ard with VHB. Per code secti o n 2-336 (6), the City docs not have to competitiv ely bid out an RrP w he n th e cos t of a co ntr ac t is at or below th e cost of anoth e r comp etiti ve ly bid co ntra ct. T he City Atl orney has revie wed th e proposed co ntract from VITB. There a re so me minor co ntractual issues that will be worked ou t w ith V l iB prior to exec ut ion of th e co ntr act. BUDGET: Ordin ance 20-15-13 1, fundin g the st ud y RECOMMENDATION: Authorize the Cit y Manager to execute cont ract with VHB ATTAC HM ENTS: Draft ofCRA co ntract; Fee proposa l REVIEWE D BY C ITY MANAGER: . -n. V'ec-;f0-:--/ ______ _ Phon e. 407.839.4006 Fax ; 407 .839.4008 w w w.vhb.com Fnglneo" 1 Sdenllsts 1 Pl •nners f 0.1ignoll Vanasse Hangen Brustlin. Inc. Land mark Ce nt er Tw o Su it e 300 225 E. Robinson Stree t Orlando, Florid a 3280 1 !ZI New Contract D Amendment No. Date Proj ect No. ACEN OA I TEM # 8A JULY 13,2015 Client Authorization Jun e 3, 2015 823 17.15 Project Name City of Atlantic Beac h Community Red evelopment Area (CRA) Plan To: City o f Atlan tic Beach As Requested By: Cli ent Cost Estimat e Amen dment Contrac t Total Labo r Expenses 181 Fixe d Fee D Cos t + Fixed Fee $92,446.67 included D Ti me & Ex p enses 0 O ther Thi s Ag r ee m ent is com p osed o f Part I, and Part II. Pa rt I i ncludes d eta il s of the se rv ices to be p erfor m ed , t i mi ng of the serv i ces, an d com p ensa ti o n. Par t II (att ac hed ) contai ns t he Terms and Co nditions of Agreem en t, which are prop osed gener al t erms o f th e engagem ent between the Ci ty o f Atlanti c Beach, her ei n after ca ll ed t he "Cli en t," and Vanasse Hangen Brust lin, In c. (VHB). PROJECT DESCRIPTION It is underst ood t h at Ci ty o f Atlantic Beac h d esi r es t he cr eati o n o f a Community Red evelop ment Area (CRA) to enco urage th e redevel opm ent of t he Hi ghway A 1 A corrid or. Th e area p re liminarily id en tifi ed by the Ci t y is wholly wi thin t he City's juri sd iction an d is gen era lly bound t o the sou th by A tl an ti c Bou levard , to t he west b y the Int ercosta l W aterway, t o the no r th by Du tton Island Ro ad , and includes multiple pa rce ls w ith fron tage on t he east si d e of Hi gh way A 1 A. VH B will co m p lete t he followin g Ta sks n ece ss ary to prep are th e Fi nding of N ecessity an d estab lish t h e CRA consist en t with leg islative r equirem ents o f t he Sta te of Flo rid a and Duval Cou n ty. SCOP E OF SERVICES 1.0 Proj ec t Start Up 1.1. Ki ck -O ff M ee t ing VH B an d the No rtheas t Flori d a Regional Council (NEFR C) w ill p repare for and f aci li tate a kick-off m eet ing with th e Ci ty Pl ann i ng and Development Depa rtment, Proj ect M an age r and o ther ap p ro p riate City staff, se rvi ng as th e Tec hni ca l Advi so ry Co mmittee (TAC). 1.2. CRA Dri ving and W alking Tour VHB, NEFRC, and City staff, along wi th any m embers o f th e TAC who w ish t o partici pate, along w it h key stakehold ers, w ill to ur th e iden tifie d CRA area togeth <?r to all ow the p r oject team to b ecom e fam iliar with /It'll orig i!lrd.,· uf tl/11' Atlllrori:otioll lll't'd tr' hi.' t'-H.!Culed. Out! o ri~:iualocrrl.~ l o bf! j iJJ'\1'(1/'tl!•d lri t lccmmlill)! ('cm lracll·lles. AGENDA ITEM #SA JULY 13,2015 concerns expressed by the TAC and any other specific site considerations the staff, TAC or stakeholders believe will be included preparation of the CRA Plan. 1.3. Technical Advisory Committee Meetings VHB and City Staff will work with a Technical Advisory Committee (TAC) identified by and organized by the City. Additional members may be added to the committee once the boundaries for the CRA have been identified. The TAC acts as a sounding board for ideas in the plan and for actions that must be taken by officials of the City of Atlantic Beach in the adoption of the CRA Plan. Specifically its role is to: • Represent the community and guide the establishment of the Atlantic Beach CRA Plan • Provide input and refinement for the identification of redevelopment issues and opportunities • Assist in the evaluation and selection of the CRA boundary • Assist in the development of the goals, objectives and benchmarks for implementing the CRA Plan • Participate in Community Workshops • Recommend the draft plan to City Council VHB will prepare for and facilitate up to three (3) TAC meetings to review and advise the City on project progress and deliverables. Task 1 Deliverables • Detailed Project Schedule • Project Team Directory • Identification of issues to be addressed by the CRA Plan • Kick-off Meeting Summary • Preparation for and facilitation of up to three (3) TAC meetings 2.0 Community Outreach and Stakeholder Involvement 2.1. One on One Interviews VHB and the NEFRC will conduct up to five (5) interviews, in person or by phone, with key individuals or small groups of property owners, economic development experts and other key stakeholders in the study area, especially those who have participated in preparation of past plans and guidelines. A memorandum will be prepared summarizing the feedback relating to market, CRA boundaries, development opportunities and potential barriers to development as identified in these discussions. 2.2. Community Workshops VHB and the NEFRC will prepare for and facilitate two (2) community workshops to solicit input on the proposed CRA boundary, policies, projects and action plan. 2.3. Social Media VHB and NEFRC will work with the City to employ a variety of media technology options to facilitate online input and collaboration from the community concerning various design, planning and implementation alternatives presented at key points during the project. These technologies supplement public outreach strategies to help drive increased citizen participation and obtain meaningful feedback, beyond public meetings, email lists, fliers, and other traditional methods. Social media will be employed throughout the process to build awareness, understanding and consensus on the final recommendations. Task 2 Deliverables • Stakeholder Interviews summary Two originals of this Authorization need to be executed. One original need~ to bej01warded to Accounting Contract Files. • Community Workshop promotional materials • Agenda for Community Workshop #1 and #2 • Presentation Materials for Community Workshop #1and #2 • Community Workshop #1and #2 Meeting Summary • Results Community Preference Surveys • Social Media Outreach Strategy 3.0 CRA Plan Vision, Goals and Objectives AGENDA ITEM# SA JULY 13,2015 This task describes the preparation necessary for Community Workshop #1. In conjunction with the work in Task 4 (described below), VHB will analyze existing conditions relative to the criteria for documenting blighted conditions as provided in applicable State of Florida Statutes. Based on this analysis VHB will prepare CRA boundary map alternatives for consideration by the TAC. Based on the evaluation, VHB will meet with the TAC to confirm the Vision Principles, policies and guidelines for guiding the development of the CRA Plan and confirm the CRA Boundary (preliminarily identified by the City) to be used in preparing the required Blight Study and the CRA Master Plan. As part of the analysis, VHB will prepare an existing conditions map that documents opportunities and barriers to redevelopment and suggests potential catalyst projects. Task 3 Deliverables • Healthy Community Design Framework Diagram • Vision Statement • Goals and Objectives • Definition of proposed boundaries • Identification of Initial Redevelopment Opportunities 4.0 Demographic Profile and Redevelopment Analysis 4.1 Demographic Profile and Redevelopment Analysis This task will be led by Steve Lindorff, retired director of the City of Jacksonville Beach CRA, on contract with VHB. Mr. Lindorff will be responsible for the following deliverables: • Demographic profile of City of Atlantic Beach and study area; • Economic input for Finding of Necessity; and • Review I QAQC of City's TIF projections; 4.2 Existing and Future Conditions Analysis VHB will perform the following subtasks to evaluate current and potential future conditions within the City's CRA: • Prepare a map series using GIS provided by the City or other readily available public sources. The map series will include: • Study area • Existing Land Use • Future Land Use • Transit Routes • Transportation Network • Existing and Future Levels of Service • Utilities Map • Water and Water Service Areas • Sewer and Stormwater • Ownership • Vacant/Public Land • Environmental Constraints • Parks, Public Uses and Open Spaces, Historical and cultural resources Two originals C!(this Authorization need to be executed. One original needs to befonvarded to Accounting Contract Files. AGENDA ITEM# SA JULY 13, 2015 • Evaluate overall physical conditions, including functional and physical obsolescence and blight caused by absentee property owners to understand the issues causing owners to redevelop or dispose of their properties; • Review the City's Comprehensive Plan and current development regulations and to determine where improvements can be implemented that will serve to facilitate redevelopment, such as expedited permitting. • Evaluate the overall transportation network, including pedestrian, vehicular, existing public transit options; and • Evaluate other public infrastructure that could impact development potential including water and sewer facilities, stormwater management, and other relevant systems necessary to support existing and proposed development in the study area. Task 4 Deliverables: • Demographic profile • QA/QC of TIF projections provided by City • GIS Map Series • Technical Memorandum of existing and future infrastructure conditions 5.0 DRAFT FINDING OF NECESSITY. CRA PLAN AND POLICY FRAMEWORK Using the results from the previous Tasks, VHB will prepare a preliminary draft of the Finding of Necessity, CRA Plan and Policy Framework. Mr. Lindorff, serving as Senior Community Redevelopment Plann'er, will review the draft plans prepared by VHB, providing input on programs and projects to be funded by the CRA. The Plan will address the requirements of Chapter 163, Part Ill F.S. Once the comments have been recorded, VHB will arrange for review of the draft plans by the TAC. Upon approval by the TAC, the draft plan will be considered at a City Council Workshop. Based on the direction received at the workshop, VHB will prepare a Final CRA Plan, as described in Task 6. Final public hearings will be scheduled in compliance with Chapter 163, Part 3 and applicable City ordinances. Task 5 Deliverables: • Draft Finding of Necessity • Draft Community Redevelopment Area Plan • One (1) City Council Workshop to present drafts 6.0 FINAL FINDING OF NECESSITY. CRA PLAN AND POLICY FRAMEWORK Based upon the input from the public meetings and direction from the TAC and City Council, VHB will prepare the final Finding of Necessity, CRA Plan and Policy Framework. VHB will provide electronic editable and PDF versions of the CRA Plan, and PowerPoint Presentation, as well as 20 paper copies of the Finding of Necessity and CRA Plan. Task 6 Deliverables: • Electronic Editable and PDF of Finding of Necessity and CRA Plan • Electronic PowerPoint Presentation • Twenty (20) paper copies of Finding of Necessity and CRA Plan Tll'o originals of this Authorization need to be executed. One original needs to befOJwarded to Accounting Contract Files. ASSUMPTIONS AGENDA ITEM #SA JULY 13,2015 It is understood that VHB will perform services under the sole direction of the Client. In the performance of these services, VHB will communicate its efforts with those of other project team members as required. It is understood that VHB will use the CRA boundary that has been preliminarily identified by Client and will be used as the basis for the Finding of Necessity and the Redevelopment Plan SERVICES NOT INCLUDED The following services have not been included in this Amendment at this time: • Transportation modeling • Permit applications • Environmental assessment Should work be required in these areas, or areas not previously described, VHB will prepare a proposal or amendment, at the Client's request, that contains the Scope of Services, fee, and schedule required to complete the additional work items CLIENT FURNISHED INFORMATION VHB will rely upon the accuracy and completeness of Client-furnished information in connection with the performance of services under this Agreement. Client shall provide VHB with project-related technical data including, but not limited to, the following: • Property Appraiser data for parcels within identified Community Redevelopment Area (CRA). • Tax Increment Financing (TIF) projections for identified CRA parcels. • City-wide GIS data, including parcels, public infrastructure, land use, and environmental resources. • Demand and available capacity for public infrastructure (water, wastewater, etc). SCHEDULE VHB will begin performance of the above services on the date written authorization to proceed is received. VHB will complete professional services described within 10 months of receiving written authorization to proceed. The schedule assumes receipt of the information described under "Client Furnished Information" when the authorization to proceed is received and is also subject to timely delivery of information promised by the Client and is exclusive of Client and local review of interim products. Two originals of this Authorization need to be executed. One original needs to be forwarded to Accounting Contract Files. COMPENSATION AGENDA ITEM #8A J ULY 13,201 5 VHB wi ll perform the Scope of Serv ices containe d in thi s Agreement on a lu m p sum bas is as ind ica t ed b elow. Task Lump Sum Fee Task 1: Context Analysis 1.1 Kickoff $ 1,255.00 1.2 Site Tour $ 1,585.00 1.3 TAC Meetings (3) $ 9,120.00 Prepare De live r ables $ 2,625.00 Task 1 Subtotal $ 14,585.00 Tasl< 2 : Community Engagem ent 2.1 One on One Int ervi ews $ 1,500.00 2.2 1st Publi c Workshop $ 4,540.00 2.3 2 nd Publi c Workshop $ 4,540.00 2.4 Socia l M edia $ 1,690.00 Pr epa re Deliverab les $ 8,250.00 Task 2 Subtotal $ 20,020.00 Task 3: CRA Vision, Goals and Objectives Prepare De live r a bles $ 13,790.98 Task 3 Subtotal $ 13,790.98 Task 4: Demographic Profile and Red ev elopment Analysis 4 .1 Market/Economic An a lysis $ 3,590.00 4 .2 Evaluatio n of Existing and Fut ure Co nd itions $ 12,265.57 Ta sk Subtotal $ 15,855.57 Tasl< 5 Draft Finding of Necessity and CRA Plan Prepare De liverabl es $ 12,813.44 Task Subtotal $ 12,813.44 Tasl< 6 Final Finding of Necess ity and CRA Pl an Prepare Deliverables $ 7,700.00 Tas k Subtota l $ 7,700.00 Trave l and Reprogra phic Allowances (estimat ed) $ 4,000.00 Total $ 92,446.67 In addition to th e labor compensa t ion, VHB shall be reimbursed f or expe nditures made spec ifica lly for th e project su ch as: prin ting and rep rographics; t ravel and subsistence; computer charges; telep ho ne charges; shippin g, p os tage, and co u rier service charges; p u rchase of maps and similar document s; et c. These d irect expen ses will be billed at 1.0 times their act ual cost. '/'wo rm:~ino/.1' ojth i.l' lfutl!ori=rttinll 11eerf to be executed. One origi11af 1/Ceds to bc.forll'(ll'rled to Accnllllfill~ Co/1/roc//."ifes. Prepared By: C. Ostrodka AGENDA ITEM# SA JULY 13, 2015 Department Approval: P. Yeargain Please execute this Client Authorization for VHB to proceed with the above scope of services at the stated estimated costs. No services will be provided until it is signed and returned to VHB. [Zl Subject to attached terms & conditions. Vanasse Hangen Brustlin, Inc. Authorization By Paul W. Yeargain, P.E. Title Managing Director, Orlando Date June 3, 2015 D Subject to terms & conditions in our original agreement dated Client Authorization (Please sign original and return) By Title Date 711'o originals o.fthis Authorization need to be executed. One original needs to befonvarded to Accounting Contract Files. PART II VANASSE HANGEN BRUSTLIN, INC. TERMS AND CONDITIONS OF AGREEMENT AGENDA ITEM # 8A JULY 13,2015 The engagement of Vanasse Hangen Brustlin, Inc. (VHB) by Client is under the following terms and conditions. These terms and conditions are an integral part of the collective Agreement between Client and VHB. 1. The fee estimate for the proposed Scope of Services is valid for 60 days from the date of Proposal. 2. Payment to VHB is the sole responsibility of signatory of this Agreement and is not subject to third party agreements. 3. All schedules set forth in the attached Scope of Services commence upon receipt of a signed Agreement and, if requested, a retainer. All retainer amounts will be applied to the last invoice. A RETAINER OF $ -0-IS REQUIRED BEFORE SERVICES CAN COMMENCE UNDER THE AGREEMENT. 4. Requests for additional services and any associated fee adjustment must be authorized in writing before additional services can begin. 5. Invoices will be rendered monthly and become due upon receipt. Any invoice outstanding for more than 30 days after date of invoice will be subject to a financing charge of 1-1/2 percent per month. 6. Should it become necessary to utilize legal or other resources to collect any or all monies rightfully due for services rendered under this Agreement, VHB shall be entitled to full reimbursement of all such costs, including reasonable attorneys' fees, as part of this Agreement. 7. Invoice payments must be kept current for services to continue. If the Client fails to pay any invoice due to VHB within 45 days of the date of invoice, VHB may, without waiving any other claim or right against Client, suspend services under this Agreement until VHB has been paid in full all amounts due VHB and/or any of its Consultants and Subcontractors. Sealed plans, final documents, reports, and attendance at meetings/hearings will not be provided unless payment for services is current. If VHB is performing services for the Client under multiple projects, invoice payments must be kept current on all projects for services hereunder to continue. Client acknowledges VHB's right to suspend services and withhold plans and documents, as provided above, if payments are not current on all projects. If services are suspended for 30 days or longer, upon resuming services VHB shall be entitled to expenses incurred in the interruption and resumption of its services. If services are suspended for 90 days or longer, VHB shall be entitled to expenses incurred in the interruption and resumption of its services and fees for remaining services shall be equitably adjusted. The parties agree to coordinate invoices to assure timely payment. Among other things, VHB's project manager and Client's representative will confer as often as reasonably necessary about any issues that arise involving invoicing and collections. Client's representative will contact VHB's AGENDA ITEM# SA JULY 13,2015 project manager forthwith upon receipt of an invoice about any questions or issues concerning invoiced amounts. If Client's representative and VHB's project manager are unable to resolve any questions or issues, Client's representative will line item any disputed or questionable amount and pay VHB. VHB, at its option, may revise and resubmit disputed amounts at a later date. 8. VHB agrees to carry the following insurance during the term of this Agreement: • Workmen's Compensation and Employer's Liability Insurance in compliance with statutory limits. • Comprehensive General Liability Insurance including Products Completed, Contractual, Property, and Personal Injury coverage with combined single limits of $1,000,000 per occurrence and $ 2,000,000 in the aggregate. • Professional Liability Insurance with a limit of $1,000,000 per claim and in the aggregate • Automobile Liability Insurance including non-owned and hired automobiles with a combined single limit of $1,000,000 per occurrence. Certificates of insurance will be furnished upon request. If the Client requires additional insurance coverage, and it is available, Client agrees to reimburse VHB for such additional expense. 9. The Client and VHB shall at all times indemnify and save harmless each other and their officers, and employees on account of any claims, damages, losses, litigation, expenses, counsel fees, and compensation arising out of any claims, damages, personal injuries and/or property losses sustained by any person or entity, to the extent caused by the negligent acts, errors or omissions of the indemnifying party, its employees, or subcontractors in connection with the Project, and/or under this Agreement. 10. VHB shall not be responsible for failure to perform or for delays in the performance of services which arise out of causes beyond the control and/or without the fault or negligence of VHB. 11. VHB shall be entitled to rely on the accuracy and completeness of data, reports, suNeys, requirements, and other information required to be provided by Client under this Agreement. 12. Client agrees to the fullest extent permitted by law, to indemnify and hold harmless VHB, its officers, employees and sub-consultants from and against any and all claims, suits, demands, liabilities costs, including reasonable attorneys fees and defense costs caused by, arising out of or in any way connected with the detection, presence, handling, removal, abatement, or disposal of any asbestos or hazardous or toxic substances, products or material that exist on, about or adjacent to the job site. Two originals of this Authorization need to be executed. One original needs to be forwarded to Accounting Contract Files. AGENDA ITEM #8A JULY 13, 2015 13. VHB's services will be performed on behalf of and solely for the benefit and exclusive use of Client for the limited purposes set forth in the Agreement. Client acknowledges that VHB's services require decisions that are not based upon science, but rather upon judgmental considerations. Client may not delegate, assign, sublet, or transfer its duties or interest in this Agreement without the written consent of VHB. 14. In the performance or furnishing of professional services hereunder, VHB, and those it is responsible for, shall exercise the degree of skill and care customarily accepted as good professional practices and procedures by members of the same profession currently practicing under similar conditions in the same locality ("Standard of Care"). Consistent with this Standard of Care, the services shall conform to applicable laws, codes, ordinances, and regulations of any governmental agency having jurisdiction over the project, at the time services are rendered. VHB shall perform its services as expeditiously as is consistent with the Standard of Care and with the orderly progress of the Work. 15. VHB shall not be required to sign any documents, no matter by whom requested, that would result in VHB's having to certify, guaranty or warrant the existence of conditions whose existence VHB cannot ascertain. Any certification provided by VHB shall be so provided based on VHB's knowledge, information, and belief subject to the preceding sentence, and shall be given in VHB's professional opinion consistent with the Standard of Care. VHB shall be compensated for any work necessary to verify project compliance with regulatory standards for purposes of such certification. 16. Client hereby agrees that to the fullest extent permitted by law, VHB's total liability to Client and any persons or entities claiming by, through or under the Client, for any and all injuries, claims, losses, expenses, or damages whatsoever arising out of or in any way related to the Project and/or this Agreement from any cause or causes including, but not limited to VHB's negligence, errors, omissions, strict liability, statutory liability, indemnity obligation, breach of contract or breach of warranty shall not exceed $50,000 (fifty thousand dollars). 17. All documents including Drawings and Specifications (whether in hard or electronic form) prepared by VHB pursuant to the Agreement are instruments of service with respect to the Project. They are not intended or represented to be suitable for reuse by the Client or others on extensions of the Project or on any other Project. Any reuse by Client or a third person or entity authorized by Client without written verification or adaptation by VHB for the specific purpose intended will be at the Client's sole risk and without liability or legal exposure to VHB; and the Client, shall release, indemnify and hold harmless VHB from all claims, damages, losses and expenses including attorneys' fees arising out of or resulting therefrom. Any such verification or adaptation will entitle VHB to additional compensation at rates to be agreed upon by VHB and the third person or entity seeking to reuse said documents. If any information hereunder is provided in electronic format, Client recognizes that such plans, documents or other information recorded on or transmitted as electronic media, including CADD documents ("Electronic Documents") are subject to undetectable alteration, either intentional or unintentional, due to, among other causes, transmission, conversion, media degradation, software error, or human alteration. Accordingly, the Electronic Documents are provided to Client for informational purposes only and not as record documents. 711'o originals of this Authorization need to be executed. One origliw!needs to be forwarded to Accounting Contract Files. AGENDA ITEM# SA JULY 13,2015 18. To the extent permitted by law, VHB retains the copyright in all written work products, including plans, specifications, calculations, computer programs, and computer generated materials in any form, produced in connection with the work under this agreement, unless otherwise agreed to in writing by an authorized VHB representative. Subject to Term No. 17 above, VHB licenses to Client the use of all written work products, including plans, specifications, calculations, and computer generated materials in any form, produced in connection with the work under this agreement on a non-exclusive basis. 19. All questions in dispute under this Agreement shall be submitted to non-binding mediation. On the written notice of either party to the other of the election to submit any dispute under this Agreement to mediation, each party shall designate their representative and shall meet within ten (1 0) days after the service of the notice. The parties themselves shall then attempt to resolve the dispute within ten (1 0) days of meeting. Should the parties themselves be unable to agree on a resolution of the dispute, then the parties shall proceed with mediation in accordance with the mediation rules of the American Arbitration Association. The cost of mediation shall be borne equally by both parties. This process shall be considered as a condition precedent to moving to a more formal or judicial process. 20. Notwithstanding any other provision of this Agreement, neither party shall be liable to the other for any incidental, special, indirect or other consequential damages incurred due to the fault of the other party regardless of the nature of the fault or whether it was committed by the Client or VHB, or their employees, sub-consultants, or subcontractors. Consequential damages include, without limitation, liability for loss of use of the Project or existing property, loss of profits, loss of production or business interruption; however, the same may be caused. 21. In entering into this Agreement, Client has relied only upon the representations set forth in this Agreement. No verbal warranties, representations, or statements shall be considered a part of this Agreement or a basis upon which the Client relied in entering into this Agreement. No statements, representations, warranties, or understandings, unless contained herein, exist between Client and VHB. 22. Nothing contained in this Agreement shall create a contractual relationship with, or a cause of action in favor of, a third party against either the Client or VHB. VHB's services under this Agreement are being performed solely for the benefit of the Client and no person or other entity shall have any claim against VHB because of this Agreement. In addition, nothing herein shall be construed as creating a contractual relationship between the Client and any VHB employee, representative or consultant. The Client agrees that in the event of a dispute regarding this Agreement or the services rendered by VHB hereunder, the Client shall only seek recourse against VHB and waives any right to pursue a claim against VHB's individual directors, officers or employees. 23. Any taxes or fees, enacted by local, state, or federal government and based on gross receipts or revenues, will be invoiced to and payable by Client as an additional amount due under this Agreement. 24. This Agreement shall be governed and construed in accordance with the laws of the Commonwealth of Massachusetts. Two originals of this Authorization need to be executed. One original needs to be forwarded to Accounting Contract Files. AGENDA ITEM #SA JULY 13,2015 25. VHB's commitments as set forth in this Agreement are based on the expectation that all of the services described in this Agreement will be provided. In the event Client later elects to reduce VHB's scope of services, Client hereby agrees to release, hold harmless, defend and indemnify VHB from any and all claims, damages, losses or costs associated with or arising out of such reduction in services. 26. Client understands that the requirements of the Americans with Disabilities Act ("ADA") are evolving and will be subject to various, potentially contradictory interpretations and applications. VHB will use its reasonable professional efforts and judgment to interpret applicable ADA requirements and other federal, state and local laws, rules, codes, ordinances and regulations as they apply to the project. VHB cannot and does not warrant or guarantee that Client's project will comply with all ADA requirements or ADA interpretations. Two originals of this Authorization need to be executed. One original needs to befon!'arded to Accounting Contract Files. Atlantic Beach CRA Plan VHB Principal in Project Task Charge Manager Planner Sr Trans Planner Trans Planner Sr Engineer Loaded Rates $ 250.00 $ 145.00 $ 75 .00 $ 131.89 $ 72.74 $ 185.52 1.1 Kickoff Meeting 4 4 1.2 Site Tour 4 4 1.3 TAC Meetings (3) 24 34 Prepare Deliverables 2 4 12 Task Subtotal 2 36 54 0 0 0 2.1 Conduct One-on-One Interviews 2.2.1 Community Workshop #1 12 20 2.2.2 Community Workshop #2 12 20 2.3 Social Media 2 4 Prepare Deliverables 2 4 16 Task Subtotal 0 30 60 0 0 0 3 CRA Vision Plan 4 8 24 2 Task Subtotal 4 8 24 2 0 0 4 .1 Market/Economic Analysis 2 4 4.2 Evaluation of Existing and Future Conditions 4 8 40 8 12 8 Task Subtotal 4 10 44 8 12 8 5 Draft Finding of Necessity and CRA Plan 8 20 60 Task Subtotal 8 20 60 0 0 0 6 Final Finding of Neces sity and CRA Plan 8 16 30 Task Subtotal 8 16 30 0 0 0 Labor Total 26 120 272 10 12 16 ~ Community Redevelopment & Planning Consultants, LLC Senior Community Sr . Env Redevelopment Engineer Scientist Planner Principal $ 95.47 $ 187.20 $ 150.00 $ 125.00 3 3 12 3 0 0 0 21 12 4 4 24 0 0 0 44 0 0 0 0 20 23 8 23 8 20 0 10 0 0 10 0 8 0 0 8 0 39 8 42 65 NEFRC Planner/ Media Admin Graphics $ 110.00 $ 90 .00 3 12 3 3 15 6 4 4 4 4 10 18 11 36 19 0 0 0 0 0 0 0 0 51 25 Ex pen sese Total AGENDA ITEM #8A JULy 13, 2015 TOTALS $ 1,255.00 $ 1,585.00 $ 9,120.00 $ 2,625.00 $ 14,585.00 $ - $ 1,500.00 $ 4,540 .00 $ 4,540.00 $ 1,690.00 $ 8,250.00 $ 20,020.00 $ - $ 13,790.98 $ 13,790.98 $ - $ 3,590 .00 $ 12,265.57 $ 15,855.57 $ - $ 12,813.44 $ 12,813.44 $ - $ 7,770.00 $ 7,770.00 $ 88,446.67 $ 4,000.0D $ 92,446.67