Loading...
Item 4C Russell Park Concesssion Stand Sidewalk ReplacementCITY OF ATLANTIC BEACH CITY COMMISSION MEETING STAFF REPORT AGENDA ITEM 114 C .JULY 27,2015 AGENDA ITEM: Russell Park Concession Stand Sidewalk Replacement SUBMITTED BY: Douglas E. Layton, PE Public Works Director DATE: 7/15/15 BACKGROUND: 2 bids for the Russell Park Concession Area Concrete Replacement were received on 7/15/15. Both bids were found to be responsive. A mathematical error was found and corrected in the Core Construction Company bid in accordance with the requirements of the bid documents. The low adjusted bid received was from Core Construction Company in the amount of $52,154.85 including contingency. The bid includes replacement of most of the existing concrete between the two baseball field backstops west of the concession building. The purpose of this work is to minimize existing ponding of stormwater in front of the concession windows by allowing the water to rea ch the new swale re ce ntly completed connecting the north side of the concession building to the existing ditch along the parking lot area . BUDGET: The current City budget includes $250,000 for improvements to Russell Park. RECOMMENDATION: Approve the award of Bid No . 1415-07 "Russell Park Concession Stand Sidewalk Replacement" to Core Construction Company in the amount of$ 52, 154.85. ATTACHED: Adjusted Core Construction Bid Bid Tabulation REVIEWED BY: -11, 1/~ 2~ Nelson Van Liere, City Manager BID FORM AGEN DA ITEM# 4C J U L Y 27,201 5 RU SS ELL PA RK CO NCESSIO N STAND SIDE WA LK REP LA CE M ENT PROJECT CITY BID NO. 14 15-07 Bid Item DE SCRIPTI ON QTY UNIT UNI T COST EXTENDE D COS T No. BASE BID -CONCRETE WORK 1 M obil iza t ion 1 LS 7 ()(}{) 8 &kJ_ 2 Site Wor k 1 LS ~t ' s 55-oo ' 3 Excava ti on 1 LS 5 ,/J uf\ S 2ou 4 Slit Fence 200 LF g,z_~ (j)]j 5 Quality Co ntro l Tes ti ng (All owa nce) 1 AL $ 250.00 $ 250.00 6 Co ncrete, fl be rm es h r einforced, 5" thick 275 SY CJi1.1L(_ -t-~tdLt&-'24,713 -- Subtotal Ba se Bid {Items 1-6) '}.-, .-::::::~ .... , L.f. 7, 'I~ ")\ IVl) 7 Te n Per ce nt (1 0%) Conti ngency of Subtota l /', ~.....,~ .;\ -~ 1'11 ) 1.. Total (Ba se Bid Plu s 10% Contingency) J-H-: b.l 9tJ Sl ;5 I SUBM ITIAL IN FORMATION : jruJA:n ln' tlr fL 3 od5LP City, St at e & Zip c6d e Titl e Date ']l iS/ JS I ' Bu sin ess Tel epho ne BF U-2 BID 1415-07 uired Documents Submission in Triplicate (All Documents) Document Requirements Checklist Bid Form Bid Bond -5% of Bid Drug Free Workplace Public Entity Crimes Statement W-9 Form New Vendor Information Form Pr oof of Experience-5 years City of Atlantic Beach Russell Park Concession Stand Sidewalk Replacement 7/15/2015 Core Construction License-General Contractor or Underground Utilfty Financials (2 years) Insurance References (5) Documentation of Receipt of Addenda Total Bas e Bid with 10% Contingency Aw ard of Bid base d on Department Ana lys is and Com mission Approva l J.D. Hinson I 9 5 I, ~c;o --