152 3RD ST - PUBLIC WORKS '
City of Atlantic Beach _ APPLICATION NUMBER
o's it"- Building Department ' JUN 1 0 (To be assigned by the Building Department.)
.0 800 Seminole Road k= --- J - ~'fi,[,� + /3 -7ei
A Atlantic Beach. Florida 32233-5445 T 1'.0 Ej�TED I
Phone(904)247-5826 • Fax(904)2/75845_. ._ _� �
•le E-mail: building-dept @coab.us JUN' I 1 2015 _ Date routed: 61 /C /
City web-site: http://www.coab.0
7
APPLICATION REVIEW AND-TRACKING FORM
Property Address: /5'Z' 314 Jr Qeprrtment review required Yes No
C_-Buildi i•
Applicant: 4) le la ing&Zo_Dirig
Tr-- •' u istrator
Project: 9a z 26)-71(g?L(.S 11• • A • ,
•ublie-<ilitie 2
d /11 Public Safety
Fire Services
Review fee $ Dept Signature •
Other Agency Review or Permit Required Review or Receipt Date
of Permit Verified B y
Florida Dept. of Environmental Protection
Florida Dept. of Transportation
St Johns River Water Management District
Army Corps of Engineers
Division of Hotels and Restaurants
Division of Alcoholic Beverages and Tobacco
Other:
APP ICATION STATUS '--�.-
Reviewing Department First Review: proved. enied.
(Circle one.) Comments: Jae �' 1,
BUILDING / /�
PLANNING&ZONING Reviewed by: A Date: I` /-.)
TREE ADMIN. Second Review: Approved as revised. (-1D- ied.
IC WORK Comments:
PUBLIC UTILITIES
PUBLIC SAFETY Reviewed by: Date:
FIRE SERVICES Third Review: ❑Approved as revised. ❑Denied.
Comments:
Reviewed by: Date:
Revised 07/27110
„.� CITY OF ATLANTIC BEACH
DEPARTMENT OF PUBLIC WORKS
'/ ; 1200 Sandpiper Lane
Atlantic Beach.FL 32233-4318
TELEPHONE:(904)247-5834
FAX:(904)247-5843
// www.coah.us
CONTRACTOR: DATE: 6-29-2015
Bosco Building Contractors,Inc. PERMIT# 15-RADD-1374
2158 Mayport Road ADDRESS: 152 3rd Street
Atlantic Beach,FL 32233 Atlantic Beach,FL 32233
email: todd @boscocdc.com
PERMIT APPLICATION FOR A NEW HOME
Your permit application has been denied by the Public Works Department for the reasons listed below. Please submit this information
at your earliest convenience in order that we may approve your application. If you have any questions,please contact Doug Layton,
Public Works Director at 904-247-5834 or email:dlayton @coab.us
•
PUBLIC WORKS CORRECTION ITEMS:
(Submit the following information to the Public Works Department)
**Wall in right-of-way must be fully removed.
PUBLIC WORKS CONDITIONS OF APPROVAL:
(The following comments will be printed on your permit as Conditions of Approval)
**Full erosion control measures must be installed and approved prior to beginning any earth disturbing activities.
Contact Public Works(247-5834)for Erosion and Sediment Control Inspection prior to start of construction.
**All runoff must remain on-site during construction.
**Pool—WellPoint(if used)must discharge into vegetated area 10'minimum from street or drainage feature(swale,
structure or lagoon). A separate pool permit is required.
** Roll off Container Company must be on City approved list and container cannot be placed on City Right-of-Way.
(Approved:Advanced Disposal,Realco,Republic Services,Shappel's and Waste Pro.)
**Full right-of-way restoration,including sod,is required.
** Any utility cuts in the road must be repaired using COJ Standard Detail Case X and must be overlaid 10 feet in each
direction from the center of the cut. Repair must be shown on the plans.
cc: Jennifer Walker,Bldg.Dept.