Loading...
675 BEACH AVE - DENIED 15-ACST-175 LETTER , CITY OF ATLANTIC BEACH <;1 DEPARTMENT OF PUBLIC WORKS SS 1200 SANDPIPER LANE J ) ATLANTIC BEACH, FLORIDA 32233-4318 TELEPHONE: (904) 247-5834 FAX: (904)247-5843 SUNCOM: 852-5834 www.coab.us CONTRACTOR: DATE: 1-27-2015 Bosco Building Contractors, Inc. PERMIT# 15-ACST-175 2158 Mayport Road ADDRESS: 675 Beach Ave. Atlantic Beach, FL 32233 FAX: 241-0326 PERMIT APPLICATION FOR CONSTRUCTION OF POOL HOUSE Your permit application has been denied by the Public Works Department for the reasons listed below. Please submit this information at your earliest convenience in order that we may approve your application. If you have any questions, please contact Rick Simmons, Deputy Public Works Director at 904-247-5834 or email rsimmons @coab.us. PUBLIC WORKS CORRECTION ITEMS: (Submit the following information to the Public Works Department) **Provide table of impervious surface calculations for entire lot (existing and post construction). **Provide drainage plans showing site topography (flow arrows, etc.). **AII runoffs must remain on-site; cannot raise lot elevation without measures to retain runoff. **Provide construction site management plan, including Right-of-Way Permit, if using right-of- way for construction parking. **Section 24-66(b) of the Land Development Regulations requires on-site storage for increased run-off if adding 400 SF or more impervious surface. Provide Delta volume calculations and on- site retention required per Section 24-66(b). PUBLIC WORKS CONDITIONS OF APPROVAL: (The following comments will be printed on your permit as Conditions of Approval) Full right-of-way restoration, including sod, is required. Full erosion control measures must be installed and approved prior to beginning any earth disturbing activities. Contact Public Works (247-5834) for Erosion and Sediment Control Inspection prior to start of construction. cc: Jennifer Walker, Bldg. Dept.