Loading...
396 11TH ST - DENIED 15-SFR-39 LETTER �s Jyi CITY OF ATLANTIC BEACH �� DEPARTMENT OF PUBLIC WORKS 1200 SANDPIPER LANE `.---t �' ,; r ATLANTIC BEACH, FLORIDA 32233-4318 TELEPHONE: (904) 247-5834 2 FAX: (904)247-5843 "!,�J1 f j SUNCOM: 852-5834 wwwcoab.us CONTRACTOR: DATE: 1-15-15 Bosco Building Contractors, Inc. PERMIT# 15-SFR-39 2158 Mayport Road ADDRESS: 396 11th St. Atlantic Beach, FL 32233 TYPE: New Home email: todd(dboscocustomhomes.com Your permit application has been denied by the Public Works Department for the reasons listed below. Please submit this information at your earliest convenience in order that we may approve your application. If you have any questions, please contact Rick Simmons, Deputy Public Works Director at 904-247-5834 or email rsimmons@coab.us. PUBLIC WORKS CORRECTION ITEMS: (Submit the following information to the Public Works Department) **Provide drainage plans showing site topography (flow arrows, etc.) **AII runoff must remain on-site. Cannot raise lot elevation without measures to retain runoff. **Provide a pre-construction topographic survey prepared by a Florida Licensed Professional Land Surveyor, showing 1' contours. **Section 24-66(b) of the Land Development Regulations requires on-site storage for increased run-off if adding 400 SF or more impervious surface. Provide Delta volume calculations and on-site retention required per Section 24-66(b). **If on-site storage is required, a post construction topographic survey documenting proper construction will be required. **A Right-of-Way Permit must be obtained for use of driveway. **A Revocable Encroachment Permit must be obtained for pavers in the right-of-way. **Separate permit required for Pool. Wellpoint (if used) must discharge into vegetated area 10' minimum from street or drainage feature (swale, structure or lagoon). **Any utility cuts in the road must be repaired using COJ Standard Detail Case X and must be overlaid 10 feet in each direction from the center of the cut. Repair must be shown on the plans. **Provide lot number for address. PUBLIC WORKS CONDITIONS OF APPROVAL: (The following comments will be printed on your permit as Conditions of Approval) *Full right-of-way restoration, including sod, is required. *Roll off container company must be on City approved list and container cannot be placed on City Right-of- Way. (Approved: Advanced Disposal, Realco Recycling, Republic Services and Shapell's.) *Full erosion control measures must be installed and approved prior to beginning any earth disturbing activities. Contact Public Works (247-5834) for Erosion and Sediment Control Inspection prior to start of construction. copy: Jennifer Walker, Building Dept.