Loading...
5500 FLEET LANDING BLVD - PIPING TEST i benderAmodlin tFRRE SPRINI(L_ER,INC. CONTRACTOR'S MATERIAL & TEST CERTIFICATE FOR ABOVEGROUND PIPING PROCEDURE Upon completion of work,inspection and tests shall be made by the contractor's representative and witnessed by an owner's representative.All defects shall be corrected and system left in service before contractors personnel finally leave the job. A certificate shall be filled out and signed by both representatives.Copies shall be prepared for approving authorities,owners and contractor.It is understood the owners representative's signature in no way prejudices any claim against contractor for faulty material,poor workmanship,or failure to comply with approving authority's requirements or local ordinances. PROPERTY NAME DATE FLEET LANDING - NANCY HOUSE 9/15/14 PROPERTY ADDRESS 5500 FLEET LANDING BLVD ACCEPTED BY APPROVING AUTHORITIES(NAMES) City of Atlantic Beach ADDRESS PLANS INSTALLATION CONFORMS TO ACCEPTED PLANS YES ® NO ❑ EQUIPMENT USED IS APPROVED IF NO,EXPLAIN DEVIATIONS YES ® NO ❑ HAS PERSON IN CHARGE OF FIRE EQUIPMENT BEEN INSTRUCTED AS TO LOCATION OF CONTROL VALVES AND YES 0 NO ❑ CARE AND MAINTENANCE OF THIS NEW EQUIPMENT. IF NO,EXPLAIN. INSTRUCTIONS HAVE COPIES OF THE FOLLOWING BEEN LEFT ON THE PREMISES: YES 0 NO ❑ 1.SYSTEM COMPONENTS INSTRUCTIONS YES 0 NO ❑ 2.CARE AND MAINTENANCE INSTRUCTIONS YES 0 NO ❑ 3.NFPA 25 YES 0 NO ❑ LOCATION SUPPLIES BUILDINGS OF SYSTEMS Wet Pipe System YEAR OF ORIFICE TEMPERATURE MAKE MODEL MANUFACTURER SIZE QUANTITY RATING GLOBE GL5641 2014 1 6 200 GLOBE GL5635 2014 1 2 200 SPRINKLERS GLOBE GL5601 2014 1/2 220 155 GLOBE GL5615 2014 1/2 267 155 PIPE AND TYPE OF PIPE Sch 40 & Sch 10 FITTINGS TYPE OF FITTINGS Threaded & Grooved ALARM DEVICE MAXIMUM TIME TO OPERATE THROUGH TEST CONNECTION ALARM VALVE OR TYPE MAKE MODEL MIN. SEC. FLOW INDICATOR Water Flow Device Potter VSR DRY VALVE Q.O.D. MAKE MODEL SERIAL NO. MAKE MODEL SERIAL NO. TIME TO TRIP' WATER AIR TRIP POINT TIME WATER ALARM THROUGH TEST PRESSURE PRESSURE AIR PRESSURE REACHED TEST OPERATED CONNECTION _ OUTLER' PROPERLY DRY PIPE MIN. SEC. PSI PSI PSI MIN. SEC. YES NO OPERATING WITHOUT ❑ ❑ TEST Q.O.D. WITH ❑ ❑ Q.O.D. IF NO,EXPLAIN 'MEASURED FROM THE TIME INSPECTOR'S TEST CONNECTION IS OPENED OPERATION ❑ PNEUMATIC ❑ ELECTRIC ❑ HYDRAULIC ❑ PIPING SUPERVISED YES ❑ NO ❑ I DETECTING MEDIA SUPERVISED YES ❑ NO ❑ DOES VALVE OPERATE FROM THE MANUAL TRIP AND/OR REMOTE CONTROL STATIONS YES ❑ NO ❑ IS THERE AN ACCESIBLE FACILITY IN EACH CIRCUIT FOR TESTING IF NO,EXPLAIN DELUGE& PREACTION YES ❑ VALVES NO ❑ i- DOES EACH CIRCUIT OPERATE DOES EACH CIRCUIT MAXIMUM TIME TO OPERATE SUPERVISION LOSS ALARM OPERATE VALVE RELEASE RELEASE MAKE MODEL YES NO YES NO MIN. SEC. ❑ ❑ ❑ ❑ TEST HYDROSTATIC:Hydrostatic tests shall be made at not less than 200 psi(13.6 bars)for two hours or 50 psi(3.4 bars)above static pressure in excess ad 150 psi(10.2 bars)for two hours.Differential dry-pipe valve clappers shall be left open during test to prevent damage.All aboveground piping leakage shall be stopped. DESCRIPTION PNEUMATIC:Establish 40 psi(2.7 bars)air pressure and measure drop which shall not exceed 1%pas(0.1 bars)in 24 hours.Test pressure tanks at normal water level and air pressure and measure air pressure drop which shall not exceed 1% psi(0.1 bars)in 24 hours. ALL PIPING HYDROSTAICALLY TESTED AT 200 PSI 2 HOURS IF NO,STATE REASON FOR DRY PIPE PNEUMATICALLY TESTED. YES ❑ NO ❑ EQUIPMENT OPERATES PROPERLY YES ❑ NO ❑ DO YOU CERTIFY AS THE SPRINKLER CONTRACTOR THAT ADDITIVES AND CORROSIVE CHEMICALS,SODIUM SILICATE OR DERIVATIVES OF SODIUM SILICATE,BRINE,OR OTHER CORROSIVE CHEMICALS WERE NOT USED FOR TESTING SYSTEMS OR STOPPING LEAKS? YES ® NO ❑ TESTS DRAIN READING OF GUAGE LOCATED NEAR WATER SUPPLY TEST PIPE: RESIDUAL PRESSURE WITH VALVE IN TEST PIPE OPEN WIDE TEST STATIC PSI PSI PRESSURE Underground mains and lead in connections to system risers flushed before connection made to sprinkler piping. VERIFIED BY COPY OF THE U FORM YES ❑ NO ❑ OTHER EXPLAIN NO.85B FLUSHED BY INSTALLER OF UNDER- YES ❑ NO ❑ GROUND SPRINKLER PIPING BLANK TESTING NUMBER USED LOCATIONS NUMBER REMOVED GASKETS 0 WELDED PIPING YES 0 NO ❑ IF YES... DO YOU CERTIFY AS THE SPRINKLER CONTRACTOR THAT WELDING PROCEDURES COMPLY WITH THE YES 0 NO ❑ REQUIREMENTS OF AT LEAST AWS D10.9,LEVEL AR-3 WELDING DO YOU CERTIFY THAT WELDING WAS PERFORMED BY WELDERS QUALIFIED IN COMPLIANCE WITH THE YES 0 NO ❑ REQUIREMENTS OF AT LEAST AWS D10.9,LEVEL AR-3 DO YOU CERTIFY THAT WELDING WAS CARRIED OUT IN COMPLIANCE WITH A DOCUMENTED QUALITY CONTROL YES ® NO ❑ PROCEDDURE TO INSURE THAT ALL DISCS ARE RETRIEVED,THAT OPENINGS IN PIPING ARE SMOOTH,THAT SLAG AND OTHER WELDING RESIDUE ARE REMOVED,AND THAT THE INTERNAL DIAMETERS OF PIPING ARE NOT PENETRATED CUTOUTS DO YOU CERTIFY THAT YOU HAVE A CONTROL FEATURE TO ENSURE THAT ALL CUTOUTS(DISKS)ARE YES 0 NO ❑ (DISKS) RETRIEVED HYDRAULIC DATA NAMEPLATE PROVIDED IF NO,EXPLAIN NAMEPLATE YES 0 NO ❑ DATE LEFT IN SERVICE WITH ALL CONTROL VALVES OPEN: REMARKS NAME OF SPRINKLER CONTRACTOR Bender& Modlin Fire Sprinklers, Inc. TESTS WITNESSED BY FOR PROPERTY OWNER(SIGN ) TITLE DATE SIGNATURES `iM✓ ^ 1 _4041.T"'-t 6'•/5 " /1-/ FOR FIRE SPRINKLER CO. R•ETOR IGNED) TITLE DATE t-1/2&T:j / 411r-.7.4:....' fit Szfe"--i, Beiii,74.39a,A, 5.-25----ry ADDITIONAL EXPLANATIONS AND NOTES