Loading...
1 FLEET LANDING FIRE SPRINKLER PERMIT r\,,y r f_ ✓;; �s, CITY OF ATLANTIC BEACH 800 SEMINOOAD j "�' ATLANTIC BEACH,FL LE R 32233 INSPECTION PHONE LINE 247-5814 MECHANICAL FIRE SPRINKLER MUST CALL BY 4PM FOR NEXT DAY INSPECTION: 247-5814 70B INFORMATION: Job ID: 15-MCHF-561 Job Type: MECHANICAL FIRE PERMIT Description: FIRE SPRINKLER Estimated Value: Issue Date: 4/1/2015 Expiration Date: 1/18/2016 PROPERTY ADDRESS: Address: 1 FLEET LANDING BLVD RE Number: 169397-0200 PROPERTY OWNER: Name: NAVAL CONTINUING CARE Address: 1 FLEET LANDING BLVD 1 FLEET LANDING BOULEVARD GENERAL CONTRACTOR INFORMATION: Name: BENDER & MODLIN FIRE SPRINKLER Address: 170 -G C COLLEGE DR CHARLES BENDER Phone: - - FEES: Fire Sprinkler System $70.00 State Mech DBPR Surcharge $2.00 State Mech DCA Surcharge $2.00 Trade Permit Base Fee $55.00 Total Payments: S129.00 PERMIT IS APPROVED ONLY IN ACCORDANCE WITH ALL CITY OF ATLANTIC BEACH ORDINANCES AND THE FLORIDA BUILDING CODES. V`s\ CITY OF ATLANTIC BEACH s) 800 SEMINOLE ROAD ATLANTIC BEACH,FL 32233 a"<< 904 247-5800 �J13J9� (904) Revision Request Sheet Date: /7y//S----- Received by: Resubmitted: ji Ne. 24( Permit Number: /,I,C-S"OI Clearance Sheet Number: rA/4\ Original Plans Examiner: I KE Yo,A€J Project Name: /VA.1/, 0„p,V 1 A.)lJt n)C/ CA-RF Project Address: / /4C,7 Gr4Nbi&k, avp Contractor: gP7N)QE(2_ 4-AAoOLLAV Contact Name: )64CE EA jt Contact Phone Number: 9014-Z9 c- 26,37 Contact Fax Number: 90 zc -- 3 goo Revision/Plan Check/Permit Fee(s)Due:$ Description of Proposed Revision to Existing Permit: nn Pending Hold: u 11 JUN 2 Structural: _ 41- Ry AMINO� _ Plumbing: Mechanical: A '7/Tio tv/ & P44.is rl e,4t s Shbww, ieF- J1 ZEie REAcy10I0✓✓ ^>o %//E 4sI7-/c Electrical: Misc.: Additional Increase in Building Value:$ /\ 2 Additional Square Footage: /t Clearance Sheet/Site Plan Revised: Environmental Health Approval: By signing below,I(printname) A 0∎E T,-k7F(Z affirm that the above revision is inclusive of the proposed changes. 0/04-///5r-- Si?: ,ture of Contractor/Agent(Contractor must sign if increase in valuation) Date Office Use Only Date: Approved: Rejected: Notified by: Plan Review Comments: 2Zc Plans Examinee Date Created osrosrosato _ I bende99modhn AFIRE SPRINKLER, INCA \\\\\ REVISION BP#_IS= MG _ y--41 SIGNED ç 7 S'`Kc F . . . Fire Protection by Computer Design bender& modlin FIRE SPRINKLER 170-G College Drive Orange Park, FL 32065 (904) 298-2637 Job Name : Fleet Landing-Skilled Nursing Phase#2 Attic Area#1 Building : Skilled Nursing Location : Fleet Landing System : Contract : Data File : Fleet Landing Skilled Nursing Phase#2 Attic Area#1.WX1 170 66 WA_ Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 bender& modlin FIRE SPRINKLER Page 1 Fleet Landing -Skilled Nursing Phase#2 Attic Area#1 Date 4/27/2015 Hydraulic Design Information Sheet Name - Skilled Nursing BLDG Phase #2 Attic Area #1 Date - 4/27/2015 Location - Fleet Landing Building - Skilled Nursing System No. - Contractor - bender & modlin FIRE SPRINKLER INC Contract No. - Calculated By - Marcel Ardelean Drawing No. - Construction: (X) Combustible ( ) Non-Combustible Ceiling Height - Occupancy - Attic S (X) NFPA 13 (X) Lt. Haz. Ord.Haz.Gp. ( ) 1 ( ) 2 ( ) 3 ( ) Ex.Haz. Y ( ) NFPA 231 ( ) NFPA 231C ( ) Figure Curve S Other T Specific Ruling Made By Date E M Area of Sprinkler Operation - 1170 System Type Sprinkler/Nozzle Density - .10 (X) Wet Make D Area Per Sprinkler - 120max ( ) Dry Model E Elevation at Highest Outlet - ( ) Deluge Size 1/2" S Hose Allowance - Inside - ( ) Preaction K-Factor 5. 6 I Rack Sprinkler Allowance - ( ) Other Temp.Rat.200 G Hose Allowance - Outside - N Note Calculation Flow Required - 489.1 Press Required - 109.8 at PUMP Summary C-Factor Used: 120 Overhead 140 Underground W Water Flow Test: Pump Data: Tank or Reservoir: A Date of Test - 6/11/14 Cap. - T Time of Test - Rated Cap.- 750 Elev.- E Static Press - @ Press - 155 R Residual Press - Elev. - Well Flow - Proof Flow S Elevation - U P Location - Pump Test P L Source of Information - L. Daniel Technician Y C Commodity Class Location O Storage Ht. Area Aisle W. M Storage Method: Solid Piled $ Palletized g Rack M ( ) Single Row ( ) Conven. Pallet ( ) Auto. Storage ( ) Encap. S R ( ) Double Row ( ) Slave Pallet ( ) Solid Shelf ( ) Non T A ( ) Mult. Row ( ) Open Shelf O C R K Flue Spacing Clearance:Storage to Ceiling A Longitudinal Transverse G E Horizontal Barriers Provided: Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 0 - N NN N(,.) N d'LO CO LOU) . N V O) 00 c-(,,) .(3)O)O O) C CO O CO 00(0, O O MN- _ . (6 N 0_ 0 a) a . C u) (0 . m E C LL Q_ c 0 C . 0 O E E E E m c) (3 a) a) O a) co <-- W U)0 >,>, >, W U)U) ) . I i . C,—NN OM (o (o000IOU) E - a) 0 . N- co O co . O , O Q O V) (O D Z (n u-) E Lo h Ln ca (O(.()OON L ( ' O(O LO c O 0 ' O LL -cr a) x ' = o N 3 - 0 CL LL O -p-O ()LL cc (Q a)� (nx _r3 2 co o UCf 0'a_2 CZ Q.CZ Q.Q N z �' E E E E E a m a n E @0_CLCLCL� 0 @ (O i i I II J O',—N N CO CO - U o 0_0_0_0_0_0 0_ * = . O N (o O a a) E Q O C) U Q N 4t a) CL o EY as W _c J CL • Y . Z 2 U ate' 0 cD (0 a) u) Z N . i W a 0 _ D cC a) M O V a -0 0 n CE o 0_ O C ' O n E -6 ... N (/) off$ C N 0 (0 (fl V' N 0 CO a) J CD a0 (O LO V CO N O CO 'Cr N 0 CO CO V N <— . . . . . O) CO I— CO 'tT co N CL LL 0 W U) U) Z 0 W ✓ '-co N U•) N O CO N 0 N ti N'. O.O N ,O N M CO LO O V N C) CD w C).. 03 CL (0' O O) OVA a0 ✓ U7 ti • co M' r` N r M O NNE (0 O O)N. 0 N•• M) CO 04 O) M O CO O r-o V o Q co; N.-.-r- M D N U) U7 o).-U) N E (0 L N- D V N a O C 'Cr C (Li t` a) MO CO M N Q) U = O' ELL > N CO a)Lr)M N°hM 'C - L L - C' U) C r)•)-• U 7 03 a) 1:3 To C• t` O CV r_ O.) _ N U Q N `ti CO M (6 a • •• O U N (O U)C'4 N >'d o a Q) C aa) 0_u_ u) o- T o L as 0 U p L v N� = v ✓ O V N w co � C 13-0 co m COL @ a) N U) a) U .�..' ` U) a) -co O) 0 C 4- s O L u) 2 oM.--o c a) o =_ C a 3 N . 7•LL � � LN- 3C ( a as r ON N)A aC/) co'D a a) L a) E 0 CD Q C •N N > Y .- O a ▪ as .-. r ON' a)V ° U) aN Ua N ma .- a) o Q m a) C� o °. `o u) o Y a) cv C- U a (O oo Cw' C 0_ c C a) \ o.-.-LLC,) C LL. D W (0 C o d as cc •� c ) 0 = a JQ" a) u) a) ma) V) C 0) 3 U) 11) 41• 0) = Z C no a) a) L .. N Z. CO L I- f0 a. = >-0 N. > C •- `O C E WZ >v >Y oa =CL E tnw 3 Ct WLEmn U= o cO NU)W 0LL a O 8 (� Y a mC)v C) U) C ~- CO L w C > C U 0) U) o a N M M M'�M rtU.) .N. a) O) CO (O 4- a) 72 co a'--- ,.— J C Q O co 03 O C 0 €QQQ`)Q E u E a) fl. £ en E a � (aU Lt.II- oU E C to - V _o C O U) o6 C wz Qzzztiz . N D •C N w X O a) U 0) a) � W v) a, _CD o �oo •0 E o 11 11) 0)2 W E CD v) 1141 •- N 11.30 � � C a E g o oa`- LL .0 L. LLQ <asWu.(if- D 6J LLQ Z W O U) (0w Pressure / Flow Summary - STANDARD bender&modlin FIRE SPRINKLER Page 4 Fleet Landing -Skilled Nursing Phase#2 Attic Area#1 Date 4/27/2015 I 1%1111 Al Node Elevation K-Fact Pt Pn Flow Density Area Press No. Actual Actual Req. D001 0.0 5.6 7.0 na 14.82 0.1 20 7.0 D002 0.0 5.6 7.0 na 14.82 0.15 20 7.0 27 18.958 5.6 7.9 na 15.74 0.1 120 7.0 28 18.958 5.6 8.57 na 16.39 0.1 120 7.0 29 18.958 5.6 9.23 na 17.01 0.1 120 7.0 30 18.958 5.6 10.67 na 18.29 0.1 120 7.0 31 18.958 5.6 13.27 na 20.4 0.1 120 7.0 32 18.958 5.6 17.5 na 23.42 0.1 120 7.0 33 18.958 24.73 na 20 15.917 5.6 7.0 na 14.82 0.1 120 7.0 21 15.917 5.6 7.6 na 15.44 0.1 120 7.0 22 15.917 5.6 8.19 na 16.02 0.1 120 7.0 23 15.917 5.6 9.48 na 17.24 0.1 120 7.0 24 15.917 5.6 11.8 na 19.24 0.1 120 7.0 25 15.917 5.6 15.59 na 22.11 0.1 120 7.0 26 15.917 24.27 na 9 11.0 34.41 na 2A 10.25 5.6 9.08 na 16.87 0.1 120 7.0 1 11.0 5.6 9.43 na 17.2 0.1 120 7.0 2 11.0 9.97 na 3 11.0 5.6 10.2 na 17.89 0.1 120 7.0 3B 11.0 5.6 10.85 na 18.45 0.1 120 7.0 4 11.0 5.6 13.66 na 20.7 0.1 120 7.0 5 11.0 5.6 16.35 na 22.64 0.1 120 7.0 6 11.0 5.6 23.18 na 26.96 0.1 120 7.0 7 11.0 5.6 33.29 na 32.31 0.1 120 7.0 8 11.0 33.93 na 10 11.0 34.41 na 11 11.0 34.69 na 12 11.0 35.04 na 13 11.0 88.18 na TOR 11.0 92.8 na BOR 3.0 105.62 na UG1 0.0 108.41 na 100.0 PUMP 0.0 109.83 na The maximum velocity is 30.18 and it occurs in the pipe between nodes 6 and 7 Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 Final Calculations - Hazen-Williams bender& modlin FIRE SPRINKLER Page 5 Fleet Landing -Skilled Nursing Phase#2 Attic Area#1 Date 4/27/2015 Hyd. Qa Dia. Fitting Pipe Pt Pt Ref. "C" or Ftng's Pe Pv ******* Notes ****** Point Qt Pf/Ft Eqv. Ln. Total Pf Pn D001 14.82 1.049 E 2.0 1.000 7.000 K Factor= 5.60 to 120.0 0.0 2.000 0.0 EQ01 14.82 0.0747 0.0 3.000 0.224 Vel = 5.50 0.0 14.82 7.224 K Factor= 5.51 D002 14.82 1.049 T 5.0 1.000 7.000 K Factor= 5.60 to 120.0 0.0 5.000 0.0 EQ02 14.82 0.0747 0.0 6.000 0.448 Vel = 5.50 0.0 14.82 7.448 K Factor= 5.43 27 15.74 1.049 0.0 8.000 7.901 K Factor= 5.60 to 120.0 0.0 0.0 0.0 28 15.74 0.0835 0.0 8.000 0.668 Vel = 5.84 28 16.39 1.38 0.0 8.000 8.569 K Factor= 5.60 to 120.0 0.0 0.0 0.0 29 32.13 0.0822 0.0 8.000 0.658 Vel = 6.89 29 17.01 1.38 0.0 8.000 9.227 K Factor= 5.60 to 120.0 0.0 0.0 0.0 30 49.14 0.1806 0.0 8.000 1.445 Vel = 10.54 30 18.30 1.38 0.0 8.000 10.672 K Factor= 5.60 to 120.0 0.0 0.0 0.0 31 67.44 0.3242 0.0 8.000 2.594 Vel = 14.47 31 20.40 1.38 0.0 8.000 13.266 K Factor= 5.60 to 120.0 0.0 0.0 0.0 32 87.84 0.5288 0.0 8.000 4.230 Vel = 18.84 32 23.42 1.38 0.0 8.833 17.496 K Factor= 5.60 to 120.0 0.0 0.0 0.0 33 111.26 0.8187 0.0 8.833 7.232 Vel = 23.87 33 0.0 1.38 0.0 7.958 24.728 to 120.0 0.0 0.0 3.447 11 111.26 0.8188 0.0 7.958 6.516 Vel = 23.87 0.0 111.26 34.691 K Factor= 18.89 20 14.82 1.049 0.0 8.000 7.000 K Factor= 5.60 to 120.0 0.0 0.0 0.0 21 14.82 0.0748 0.0 8.000 0.598 Vel = 5.50 21 15.43 1.38 0.0 8.000 7.598 K Factor= 5.60 to 120.0 0.0 0.0 0.0 22 30.25 0.0735 0.0 8.000 0.588 Vel = 6.49 22 16.02 1.38 0.0 8.000 8.186 K Factor= 5.60 to 120.0 0.0 0.0 0.0 23 46.27 0.1616 0.0 8.000 1.293 Vel = 9.93 23 17.25 1.38 0.0 8.000 9.479 K Factor= 5.60 to 120.0 0.0 0.0 0.0 24 63.52 0.2902 0.0 8.000 2.322 Vel = 13.63 24 19.23 1.38 0.0 8.000 11.801 K Factor= 5.60 to 120.0 0.0 0.0 0.0 25 82.75 0.4735 0.0 8.000 3.788 Vel= 17.75 Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 Final Calculations - Hazen-Williams bender& modlin FIRE SPRINKLER Page 6 Fleet Landing -Skilled Nursing Phase#2 Attic Area#1 Date 4/27/2015 Hyd. Qa Dia. Fitting Pipe Pt Pt Ref. "C" or Ftng's Pe Pv *"*"*** Notes """"` Point Qt Pf/Ft Eqv. Ln. Total Pf Pn 25 22.11 1.38 E 3.0 8.833 15.589 K Factor= 5.60 to 120.0 0.0 3.000 0.0 26 104.86 0.7338 0.0 11.833 8.683 Vel= 22.49 26 0.0 1.38 T 6.0 4.917 24.272 to 120.0 0.0 6.000 2.130 10 104.86 0.7338 0.0 10.917 8.011 Vel= 22.49 0.0 104.86 34.413 K Factor= 17.88 9 161.22 2.635 6E 49.423 598.500 34.411 to 120.0 6T 98.845 172.979 0.0 13 161.22 0.0697 6F 24.711 771.479 53.766 Vel= 9.49 0.0 161.22 88.177 K Factor= 17.17 2A 16.87 1.049 2T 10.0 2.792 9.080 K Factor= 5.60 to 120.0 0.0 10.000 -0.325 2 16.87 0.0951 0.0 12.792 1.216 Vel= 6.26 0.0 16.87 _ 9.971 K Factor= 5.34 1 17.20 1.049 0.0 5.458 9.433 K Factor= 5.60 to 120.0 0.0 0.0 0.0 2 17.2 0.0986 0.0 5.458 0.538 Vel= 6.39 2 16.87 1.38 0.0 2.542 9.971 to 120.0 0.0 0.0 0.0 3 34.07 0.0917 0.0 2.542 0.233 Vel = 7.31 3 17.89 1.38 0.0 3.250 10.204 K Factor=5.60 to 120.0 0.0 0.0 0.0 3B 51.96 0.2000 0.0 3.250 0.650 Vel= 11.15 3B 18.45 1.38 0.0 8.000 10.854 K Factor= 5.60 to 120.0 0.0 0.0 0.0 4 70.41 0.3512 0.0 8.000 2.810 Vel = 15.10 4 20.70 1.38 0.0 4.750 13.664 K Factor= 5.60 to 120.0 0.0 0.0 0.0 5 91.11 0.5659 0.0 4.750 2.688 Vel= 19.54 5 22.65 1.38 0.0 8.000 16.352 K Factor=5.60 to 120.0 0.0 0.0 0.0 6 113.76 0.8531 0.0 8.000 6.825 Vel= 24.40 6 26.96 1.38 0.0 8.000 23.177 K Factor= 5.60 to 120.0 0.0 0.0 0.0 7 140.72 1.2644 0.0 8.000 10.115 Vel = 30.18 7 32.31 2.635 0.0 8.000 33.292 K Factor=5.60 to 120.0 0.0 0.0 0.0 8 173.03 0.0794 0.0 8.000 0.635 Vel= 10.18 8 0.0 2.635 0.0 6.083 33.927 to 120.0 0.0 0.0 0.0 9 173.03 0.0796 0.0 6.083 0.484 Vel= 10.18 9 -161.22 2.635 0.0 4.750 34.411 to 120.0 0.0 0.0 0.0 10 11.81 0.0004 0.0 4.750 0.002 Vel = 0.69 Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 Final Calculations - Hazen-Williams bender& modlin FIRE SPRINKLER Page 7 Fleet Landing -Skilled Nursing Phase#2 Attic Area#1 Date 4/27/2015 Hyd. Qa Dia. Fitting Pipe Pt Pt Ref. "C" or Ftng's Pe Pv ******* Notes ****** Point Qt Pf/Ft Eqv. Ln. Total Pf Pn 10 104.86 2.635 0.0 7.250 34.413 to 120.0 0.0 0.0 0.0 11 116.67 0.0383 0.0 7.250 0.278 Vel = 6.86 11 111.26 2.635 0.0 2.625 34.691 to 120.0 0.0 0.0 0.0 12 227.93 0.1322 0.0 2.625 0.347 Vel = 13.41 12 0.0 2.635 4F 16.474 311.208 35.038 to 120.0 4T 65.897 90.608 0.0 13 227.93 0.1322 E 8.237 4.01.816 53.139 Vel = 13.41 13 161.22 3.26 E 9.408 27.250 88.177 to 120.0 0.0 9.408 0.0 TOR 389.15 0.126.2 0.0 36.658 4.626 Vel = 14.96 TOR 0.0 3.26 A 28.895 8.000 92.803 to 120.0 B 13.44 42.335 6.465 ** Fixed Loss= 3 BOR 389.15 0.1262 Fsp 0.0 50.335 6.351 Vel = 14.96 BOR 0.0 4.26 T 26.334 4.000 105.619 to 120.0 E 13.167 39.501 1.299 UG1 389.15 0.0343 0.0 43.501 1.492 Vel = 8.76 UG1 100.00 8.27 3E 85.404 800.000 108.410 Qa= 100 to 140.0 2F 28.468 113.872 0.0 PUMP 489.15 0.0016 0.0 913.872 1.422 Vel= 2.92 0.0 489.15 109.832 K Factor= 46.67 Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 bender,4' \mod1in �'',BFIRE SPRIT KLER, I�JC 1 /'I \`\`\ Fire Protection by Computer Design bender& modlin FIRE SPRINKLER 170-G College Drive Orange Park, FL 32065 (904)298-2637 Job Name : Fleet Landing -Skilled Nursing Phase#2 Attic Area#2 Building : Skilled Nursing Location : Fleet Landing System : Contract : Data File : Fleet Landing Skilled Nursing Phase#2 Attic Area#2.WX2 Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 bender& modlin FIRE SPRINKLER Page 1 Fleet Landing-Skilled Nursing Phase#2 Attic Area#2 Date 4/27/2015 Hydraulic Design Information Sheet Name - Skilled Nursing BLDG Phase #2 Attic Area #2 Date - 4/27/2015 Location - Fleet Landing Building - Skilled Nursing System No. - Contractor - bender & modlin FIRE SPRINKLER INC Contract No. - Calculated By - Marcel Ardelean Drawing No. - Construction: (X) Combustible ( ) Non-Combustible Ceiling Height - Occupancy - Attic S (X) NFPA 13 (X) Lt. Haz. Ord.Haz.Gp. ( ) 1 ( ) 2 ( ) 3 ( ) Ex.Haz. Y ( ) NFPA 231 ( ) NFPA 231C ( ) Figure Curve S Other T Specific Ruling Made By Date E M Area of Sprinkler Operation - 1170 System Type Sprinkler/Nozzle Density - .10 (X) Wet Make D Area Per Sprinkler - 120max ( ) Dry Model E Elevation at Highest Outlet - ( ) Deluge Size 1/2" S Hose Allowance - Inside - ( ) Preaction K-Factor 5.6 I Rack Sprinkler Allowance - ( ) Other Temp.Rat.200 G Hose Allowance - Outside - N Note Calculation Flow Required - 370.5 Press Required - 63.9 at PUMP Summary C-Factor Used: 120 Overhead 140 Underground W Water Flow Test: Pump Data: Tank or Reservoir: A Date of Test - 6/11/14 Cap. - T Time of Test - Rated Cap.- 750 Elev.- E Static Press - @ Press - 155 R Residual Press - Elev. - Well Flow - Proof Flow S Elevation - U P Location - Pump Test P L Source of Information - L. Daniel Technician Y C Commodity Class Location O Storage Ht. Area Aisle W. M Storage Method: Solid Piled Palletized g Rack M ( ) Single Row ( ) Conven. Pallet ( ) Auto. Storage ( ) Encap. S R ( ) Double Row ( ) Slave Pallet ( ) Solid Shelf ( ) Non T A ( ) Mult. Row ( ) Open Shelf O C R K Flue Spacing Clearance:Storage to Ceiling A Longitudinal Transverse G E Horizontal Barriers Provided: Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 - 0 N C` .N-tNup NN- N N V 0) .O D OO O N C)) a) Q) CO CO a. ❑ a) D u) CO 'i)--E 02Da) cLL.a_ c c o o E E E E ED o co >Th.in❑w� W CO(1) W.� o . . ∎ N ■ w CrNN 0 C CO CO❑❑❑SO(1) E a) o co 0 co O O Q O co co D Z LU LI) E u) h In Co (OLn00N 0 Lf)Lf)LD0r c r r N-r-1- 0 0 O 0 ‘- LL v a) Q) a) CO 0 ct N p 3 c E 0 0 Co L- co 2 a) a) cr, x _ 0 CUU2U 0� I U�wa_� 0.0_0.0_0_ NZ c) EEEEE 0 c c O E ca a.a.a_a_a @ is I I I I J ❑r NNCOC`) X LL O a,a_a_a_a_a_ a N E 0 (6 0 a ) r o ::c_ U O •Q N C•1 O a) o C/) Cb W tY _c J 0_ Y Z c U a� N o a) co z co W -0 - _ N O Q E — �1 N (I) off$ c 0 OD C C0--� CO U) V N N 0 CO Cr N 0 CO CD V N r r r r c- C)) CO N. CO d' CO N -O ",-., r r r CZ C a. r W CO CO D CC W , LO N 0Gm 2 0 N N oaN ) m + co ■&o G i/ I = - 2 G CO o CO N- N CO n 0 0 < CO %°«N 0 CO 3 ✓ 0)s-10 N $ k s—�,—sr N o \ § 2 0 / oco n 2 2a) 022 E ƒ > @ .o \ ul co O ( >a o m m��m f -0 _c 7 w � � � _ � d § .g o = o £ ( ¥ ���n > o C ƒ 0 k ooia � 2 2 � � > o . ' > N CO004±0 ® � � ƒ 73— E C �/ E� k ° f o�� a� E/ k2 NI" § CO = co = � � ® 2 f on I § a) .Q -F, 2 �-o � � / $ & $ F � CL N e S % cE £ b / t # $ = •� � e \ � om km 2 = _ o. E 4 �k° @k k § $ �\ k 0 � J om,- k� CO kp EalE222 § 30E & � o3 � * o��)n / � / / � k / cEk a) It 2m - cue � q .> 770E = -1i �a / 2 % § z_ E 2 e \ raj I- q 7 / aN � P m= $ $ m £ ) E Cl- k > > s b 2 4 k ƒ § E �« ■ a- 2 2 22 £ w = S >,coo3 a = m = ID / ƒ 2 ,-=0- a C C c@ \Ia»)a CI) _c _o k E <<< 0< E co E2 \ /CL Ee c0 §±±E]E E = 'Em = .E\ S �yo e k % gz <zzzLLz . � = rr ,Pc § _ a) « c a• l -J m « £ = 2 � 70 ± \ u_ _ « 66 $ EoRm a .§ q � _, U K a) :E � E £ @ 2 =- \� � .0 F . LL< <co 0LLIw = 6JLL Q 2 Ill » (/) co a Pressure / Flow Summary - STANDARD bender& modlin FIRE SPRINKLER Page 4 Fleet Landing-Skilled Nursing Phase#2 Attic Area#2 Date 4/27/2015 Node Elevation K-Fact Pt Pn Flow Density Area Press No. Actual Actual Req. S002 16.333 5.6 7.0 na 14.82 0.1 120 7.0 136 16.333 5.6 12.33 na 19.67 0.1 120 7.0 137 16.333 5.6 11.15 na 18.7 0.1 120 7.0 138 16.333 5.6 11.74 na 19.19 0.1 120 7.0 139 16.333 12.99 na 135A 15.833 K=K @ EQ02 15.63 na 15.49 135 15.25 16.89 na 133 21.5 5.6 7.53 na 15.37 0.1 120 7.0 134 21.5 5.6 8.17 na 16.01 0.1 120 7.0 127 21.5 5.6 7.0 na 14.82 0.1 120 7.0 128 21.5 5.6 7.6 na 15.44 0.1 120 7.0 129 21.5 8.41 na 130 11.625 19.0 na 131 11.625 19.09 na 132 11.625 19.14 na 123 16.333 5.6 12.49 na 19.79 0.1 120 7.0 124 16.333 5.6 10.91 na 18.5 0.1 120 7.0 125 16.333 5.6 11.78 na 19.22 0.1 120 7.0 126 16.333 13.0 na 122A 15.833 K=K @ EQ02 15.56 na 15.45 122 16.333 16.34 na 120 20.167 5.6 7.94 na 15.78 0.1 120 7.0 121 20.167 5.6 8.61 na 16.44 0.1 120 7.0 106 11.625 20.19 na 100 20.167 5.6 7.2 na 15.02 0.1 120 7.0 101 20.167 5.6 7.81 na 15.65 0.1 120 7.0 102 20.167 8.75 na 103 11.625 19.0 na 104 11.625 19.1 na 105 11.625 19.14 na 107 11.625 20.19 na 9 11.0 27.35 na 10 11.0 27.59 na 11 11.0 27.96 na 12 11.0 28.1 na 13 11.0 48.7 na TOR 11.0 51.07 na BOR 3.0 60.77 na UG1 0.0 63.11 na 100.0 PUMP 0.0 63.96 na The maximum velocity is 13.49 and it occurs in the pipe between nodes 102 and 103 Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 Final Calculations - Hazen-Williams bender& modlin FIRE SPRINKLER Page 5 Fleet Landing-Skilled Nursing Phase#2 Attic Area#2 Date 4/27/2015 Hyd. Qa Dia. Fitting Pipe Pt Pt Ref. "C" or Ftng's Pe Pv ******* Notes ****** Point Qt Pf/Ft Eqv. Ln. Total Pf Pn S002 14.82 1.049 E 2.0 1.000 7.000 K Factor= 5.60 to 120.0 0.0 2.000 7.074 EQ02 14.82 0.0747 0.0 3.000 0.224 Vel = 5.50 0.0 14.82 14.298 K Factor= 3.92 136 19.67 1.049 0.0 5.167 12.334 K Factor= 5.60 to 120.0 0.0 0.0 0.0 139 19.67 0.1262 0.0 5.167 0.652 Vel = 7.30 0.0 19.67 12.986 K Factor= 5.46 137 18.70 1.049 0.0 5.167 11.146 K Factor= 5.60 to 120.0 0.0 0.0 0.0 138 18.7 0.1150 0.0 5.167 0.594 Vel = 6.94 138 19.18 1.38 T 6.0 5.167 11.740 K Factor= 5.60 to 120.0 0.0 6.000 0.0 139 37.88 0.1116 0.0 11.167 1.246 Vel = 8.13 139 19.67 1.38 E 3.0 8.000 12.986 to 120.0 T 6.0 9.000 2.039 132 57.55 0.2418 0.0 17.000 4.111 Vel = 12.34 0.0 57.55 19.136 K Factor= 13.16 135A 15.49 1.049 E 2.0 5.417 15.635 K Factor @ node EQ02 to 120.0 T 5.0 7.000 0.252 135 15.49 0.0812 0.0 12.417 1.008 Vel = 5.75 135 0.0 1.38 2E 6.0 17.417 16.895 to 120.0 T 6.0 12.000 1.570 131 15.49 0.0213 0.0 29.417 0.627 Vel = 3.32 0.0 15.49 19.092 K Factor= 3.55 133 15.37 1.049 0.0 8.000 7.531 K Factor= 5.60 to 120.0 0.0 0.0 0.0 134 15.37 0.0800 0.0 8.000 0.640 Vel = 5.71 134 16.01 1.38 0.0 3.000 8.171 K Factor= 5.60 to 120.0 0.0 0.0 0.0 129 31.38 0.0787 0.0 3.000 0.236 Vel = 6.73 0.0 31.38 8.407 K Factor= 10.82 127 14.82 1.049 0.0 8.000 7.000 K Factor= 5.60 to 120.0 0.0 0.0 0.0 128 14.82 0.0748 0.0 8.000 0.598 Vel = 5.50 128 15.43 1.38 T 6.0 5.000 7.598 K Factor= 5.60 to 120.0 0.0 6.000 0.0 129 30.25 0.0735 0.0 11.000 0.809 Vel = 6.49 129 31.38 1.38 E 3.0 14.000 8.407 to 120.0 T 6.0 9.000 4.277 130 61.63 0.2745 0.0 23.000 6.313 Vel = 13.22 Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 Final Calculations - Hazen-Williams bender&modlin FIRE SPRINKLER Page 6 Fleet Landing -Skilled Nursing Phase#2 Attic Area#2 Date 4/27/2015 Hyd. Qa Dia. Fitting Pipe Pt Pt Ref. "C" or Ftng's Pe Pv ******* Notes ****** Point Qt Pf/Ft Eqv. Ln. Total Pf Pn 130 0.0 2.635 0.0 8.083 18.997 to 120.0 0.0 0.0 0.0 131 61.63 0.0118 0.0 8.083 0.095 Vel = 3.63 131 15.49 2.635 0.0 2.458 19.092 to 120.0 0.0 0.0 0.0 132 77.12 0.0179 0.0 2.458 0.044 Vel = 4.54 132 57.55 2.635 T 16.474 4.667 19.136 to 120.0 0.0 16.474 0.0 107 134.67 0.0500 0.0 21.141 1.056 Vel = 7.92 0.0 134.67 20.192 K Factor= 29.97 123 19.79 1.049 0.0 4.000 12.488 K Factor= 5.60 to 120.0 0.0 0.0 0.0 126 19.79 0.1278 0.0 4.000 0.511 Vel = 7.35 0.0 19.79 12.999 K Factor= 5.49 124 18.50 1.049 0.0 7.708 10.913 K Factor= 5.60 to 120.0 0.0 0.0 0.0 125 18.5 0.1126 0.0 7.708 0.868 Vel = 6.87 125 19.22 1.38 T 6.0 5.000 11.781 K Factor= 5.60 to 120.0 0.0 6.000 0.0 126 37.72 0.1107 0.0 11.000 1.218 Vel = 8.09 126 19.79 1.38 E 3.0 8.000 12.999 to 120.0 T 6.0 9.000 2.039 105 57.51 0.2415 0.0 17.000 4.106 Vel= 12.34 0.0 57.51 19.144 K Factor= 13.14 122A 15.45 1.049 E 2.0 5.417 15.556 K Factor @ node EQ02 to 120.0 T 5.0 7.000 -0.217 122 15.45 0.0809 0.0 12.417 1.004 Vel = 5.74 122 0.0 1.38 2E 6.0 15.750 16.343 to 120.0 2T 12.0 18.000 2.039 104 15.45 0.0212 0.0 33.750 0.717 Vel = 3.31 0.0 15.45 19.099 K Factor= 3.54 120 15.78 1.049 0.0 8.000 7.943 K Factor= 5.60 to 120.0 0.0 0.0 0.0 121 15.78 0.0840 0.0 8.000 0.672 Vel = 5.86 121 16.44 1.38 0.0 1.583 8.615 K Factor= 5.60 to 120.0 0.0 0.0 0.0 102 32.22 0.08.28 0.0 1.583 0.131 Vel = 6.91 0.0 32.22 8.746 K Factor= 10.89 106 133.93 2.635 5F 20.593 459.917 20.192 to 120.0 3E 24.711 111.201 0.271 13 133.93 0.0495 4T 65.897 571.118 28.242 Vel = 7.88 Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 Final Calculations - Hazen-Williams bender&modlin FIRE SPRINKLER Page 7 Fleet Landing-Skilled Nursing Phase#2 Attic Area#2 Date 4/27/2015 Hyd. Qa Dia. Fitting Pipe Pt Pt Ref. "C" or Ftng's Pe Pv ******* Notes ****** Point Qt Pf/Ft Eqv. Ln. Total Pf Pn 0.0 133.93 48.705 K Factor= 19.19 100 15.02 1.049 0.0 8.000 7.195 K Factor= 5.60 to 120.0 0.0 0.0 0.0 101 15.02 0.0766 0.0 8.000 0.613 Vel = 5.58 101 15.65 1.38 T 6.0 6.417 7.808 K Factor= 5.60 to 120.0 0.0 6.000 0.0 102 30.67 0.0755 0.0 12.417 0.938 Vel = 6.58 102 32.22 1.38 E 3.0 14.000 8.746 to 120.0 T 6.0 9.000 3.700 103 62.89 0.2850 0.0 23.000 6.554 Vel= 13.49 103 0.0 2.635 0.0 8.083 19.000 to 120.0 0.0 0.0 0.0 104 62.89 0.0122 0.0 8.083 0.099 Vel = 3.70 104 15.45 2.635 0.0 2.458 19.099 to 120.0 0.0 0.0 0.0 105 78.34 0.0183 0.0 2.458 0.045 Vel = 4.61 105 57.51 2.635 T 16.474 4.167 19.144 to 120.0 0.0 16.474 0.0 106 135.85 0.0508 0.0 20.641 1.048 Vel = 7.99 106 -133.93 2.635 E 8.237 29.083 20.192 to 120.0 0.0 8.237 0.0 107 1.92 0.0 0.0 37.320 0.0 Vel = 0.11 107 134.68 2.635 2E 16.474 109.500 20.192 to 120.0 2F 8.237 24.711 0.271 9 136.6 0.0513 0.0 134.211 6.883 Vel = 8.04 9 0.0 2.635 0.0 4.750 27.346 to 120.0 0.0 0.0 0.0 10 136.6 0.0514 0.0 4.750 0.244 Vel = 8.04 10 0.0 2.635 0.0 7.250 27.590 to 120.0 0.0 0.0 0.0 11 136.6 0.0513 0.0 7.250 0.372 Vel = 8.04 11 0.0 2.635 0.0 2.625 27.962 to 120.0 0.0 0.0 0.0 12 136.6 0.0510 0.0 2.625 0.134 Vel = 8.04 12 0.0 2.635 4F 16.474 311.208 28.096 to 120.0 4T 65.897 90.608 0.0 13 136.6 0.0513 E 8.237 401.816 20.609 Vel = 8.04 13 133.93 3.26 E 9.408 27.250 48.705 to 120.0 0.0 9.408 0.0 TOR 270.53 0.0644 0.0 36.658 2.360 Vel = 10.40 TOR 0.0 3.26 A 28.895 8.000 51.065 to 120.0 B 13.44 42.335 6.465 ** Fixed Loss= 3 BOR 270.53 0.0644 Fsp 0.0 50.335 3.242 Vel= 10.40 BOR 0.0 4.26 T 26.334 20.000 60.772 to 120.0 E 13.167 39.501 1.299 UG1 270.53 0.0175 0.0 59.501 1.041 Vel = 6.09 Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 Final Calculations - Hazen-Williams bender& modlin FIRE SPRINKLER Page 8 Fleet Landing -Skilled Nursing Phase#2 Attic Area#2 Date 4/27/2015 Hyd. Qa Dia. Fitting Pipe Pt Pt Ref. "C" or Ftng's Pe Pv ******* Notes ****** Point Qt Pf/Ft Eqv. Ln. Total Pf Pn UG1 100.00 8.27 3E 85.404 800.000 63.112 Qa = 100 to 140.0 2F 28.468 113.872 0.0 PUMP 370.53 0.0009 0.0 913.872 0.851 Vel= 2.21 0.0 370.53 63.963 K Factor= 46.33 Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087