Loading...
1698 MARITIME OAK DR - NEW HOME SURVEY cq m =3 d d d C14 cn w U) -,DO C,4 00 a 004 A -H g 0WO j.- W 00 a 0 a H K--v OBie C> ci iq (CD < -H if) 00 col, (50 Y) rz .1 OR 0) ID 10 ZD I— P iq 0) m r� U). N LU C-) u N N 0: 0 11 WO, ;j- SOW Ui Ito v g rE p- I '0. ilia 1: :2� Q4 Q� q,P -::4 a 2 WE Ot, -0 D 13. s 1- 04 Ot -00 8 Volt 0 Q) L, �w < 1014 CD VX W� ed al iwro W V)ZO Ex Fz INA,� k I R z CP FA f2 zi C; Li w 4 04, It WE V) wka I 24r 4n LLJ 14 Ld C, Li V) z its, #at gal L) 0 ?f .0 Ell Will b2 ji 0 PC RIP BCS r" BUILDING COMPONENT SUPPLY, INC. 4627 JP HALL BLVD. SUITE 208 CM> GREEN COVE 5PRINS5, rL 32045 0: 904.297.9390 F: 904.529. 1 406 BEARINs HEIGHTS 10 1- 1 1 /E3'1 12-'- 1 1 /13 20, - 7 18 1 1 CEILING TWO STORY THIS IS A TRUSS PLACEMENT FOYER DIAGRAM ONLY. These trusses am designed as individual building components to be incorporated into the building design at the specification of the building G, designer.See individual design sheets for each truss design identified on the placement drawing.The building Wf f designer is responsible for temporary and permanent bracing of the roof and —T— I- floor system and for the overall ru . a a gn a as suppo structure including headers, beams,walls,and columns is the Li responsibility of the building designer. For general guidance regarding bracing,consult"Bracing of Wood Trusses"available from the Truss Plate + Institute,583 D'Oniftio Drive; Madison, WI 53179. ATTENTION. I, sm �om Refer to truss layout and engineering AT �10 documents that arrive with delivered field trusses. Unless noted otherwise,all beams are Pld2 P� �P�21 N110 4x W 2 2 by thers. USP THD26� 4 LVL ......... 2 LISP THDG�"F I LISP �011� ; �: TOLL RE USP THUH2�2 CLIENT BROTHE L.P THDN' 1 USP T�.� is ATLANTIC BEACH SUBDIVISION AMBA56ADOR MODEL CATALINA ELEVATION SHINGLE LOT # DRAWN BY RAS DATE SECOND FLOOR LAYOUT FIRST FLOOR LAYOUT 05/1 3/21:11 51 SCALE: NTS SCALE: NTS 119 REF# BCS r" BUILDING COMPONENT SUPPLY, INC. 4627 JP HALL BLVD. SUITE 208 CM> GREEN COVE 5PRINS5, rL 32045 C> 0: 904.297.9390 F: 904.529. 1 406 BEARINs HEIGHTS 10 1- 1 1 /E3'1 11 2'- 1 1 /E3 20, - 7 11 18 1 1 CEILING 25' - 7 11 CEILING TWO STORY THIS IS A TRUSS PLACEMENT FOYER 4- DIAGRAM ONLY. These trusses am designed as individual building components to be r7 the specification of the building T-1 incorporated into the building design at designer.See individual design sheets for each truss design identified on the + + placement drawing.The building designer is responsible for temporary and permanent bracing of the roof and floor system an r a overa 4 4 4 structure.The design of the truss support structure including headem, beams,walls,and columns is the Lil —1 responsibility of the building designer. For general guidance regarding bracing,consult"Bracing of Wood Trusses"available from the Truss Plate IF + Institute,583 D'Oniftio Drive; Madison, WI 53179. 44- ATTENTION. SIM �T M Refer to truss layout and engineering AT 0 documents that arrive with delivered _FWr field trusses. TmssCor-d.ILI1t Unless noted otherwise,all beams are �du M.�� ��dud QIY �USPS24 10 by thers. Tz. 14 USP THD2'� 4 LISP THM�-21F USP �DHG�2 I CLIENT TOLL USP THHH2�3 BROTHERS L.P THI USP T�.� is ATLANTIC BEACH SUBDIVISION AMSA5SADOR MODEL CATALINA ELEVATION SHINGLE LOT # DRAWN BY RAS DATE SECOND FLOOR LAYOUT FIRST FLOOR LAYOUT 05/13/2015 SCALE: NTS SCALE: NTS 119 REF# 703 S