Loading...
1698 MARITIME OAK DR - NEW HOME LAM BEAMS . .. ®Boise Cascade Double 1-3/4" x 14" VERSA-LAM® 2.0 2800 DF Floor Beam1FB02 Dry 11 span I No cantilevers 1 0/12 slope Wednesday, May 13,2015 BC CALC®Design Report Build 3272 File Name: BM3 Job Name: Description: Designs\FB02 Address: Specifier: City, State,Zip: , Designer: Customer: ' Company: Code reports: ESR-1040 Misc: 7____________ _____.. ....__. _ ___2 - , , 1 17-10-08 BO B1 Total Horizontal Product Length=17-10-08 Reaction Summary(Down I Uplift) (lbs) Bearing Live Dead Snow Wind Roof Live BO,3-1/2" 3,361 /0 1,748/0 B1,3-1/2" 3,361 /0 1,748/0 Live Dead Snow Wind Roof Live Trib. Load Summary Tag Description Load Type Ref. Start End 100% 90% 115% 160% 125% 1 Standard Load Unf.Area(Ib/ft^2) L 00-00-00 17-10-08 40 10 00-06-00 2 TF20's Unf. Lin. (lb/ft) L 00-00-00 17-10-08 356 178 n/a Controls Summary Value %Allowable Duration Case Location Pos. Moment 21,673 ft-lbs 82.6% 100% 1 08-11-04 End Shear 4,275 lbs 45.9% 100% 1 01-05-08 Total Load Defl. U283(0.739") 84.9% n/a 1 08-11-04 Live Load Defl. U430(0.486") 83.8% n/a 2 08-11-04 Max Defl. 0.739" 73.9% n/a 1 08-11-04 Span/Depth 14.9 n/a n/a 0 00-00-00 %Allow %Allow Bearing Supports Dim.(L x W) Value Support Member Material BO Post 3-1/2"x 3-1/2" 5,109 lbs n/a 55.6% Unspecified B1 Post 3-1/2"x 3-1/2" 5,109 lbs n/a 55.6% Unspecified Notes Design meets Code minimum(U240)Total load deflection criteria. Design meets Code minimum(U360) Live load deflection criteria. Design meets arbitrary(1")Maximum total load deflection criteria. Calculations assume Member is Fully Braced. Design based on Dry Service Condition. Deflections less than 1/8"were ignored in the results. Page 1 of 2 Boise Cascade Double 1-3/4" x 14" VERSA-LAM® 2.0 2800 DF Floor BeamIFB02 Dry 11 span I No cantilevers 1 0/12 slope Wednesday, May 13,2015 BC CALC®Design Report Build 3272 File Name: BM3 Job Name: Description: Designs1FB02 Address: Specifier: City, State,Zip: , Designer: Customer: Company: Code reports: ESR-1040 Misc: Connection Diagram Disclosure 1_b_ _ d i— be Completeness and verified by anyone who accuracy would ould rely on a IS output as evidence of suitability for 1 • 1 • • particular application.Output here based on building code-accepted design properties and analysis methods. Installation of BOISE engineered wood • • products must be in accordance with current Installation Guide and applicable building codes.To obtain Installation Guide or ask questions,please call a minimum=2" c= 10" (800)232-0788 before installation.\n\nBC b minimum=3" d=24" CALC®,BC FRAMER®,AJSTM, ALLJOIST®,BC RIM BOARDTM,BCI®, Member has no side loads. BOISE GLULAMTM,SIMPLE FRAMING Connectors are: 16d Sinker Nails SYSTEM®,VERSA-LAM®,VERSA-RIM PLUS®,VERSA-RIM®, VERSA-STRAND®,VERSA-STUD®are trademarks of Boise Cascade Wood Products L.L.C. Page 2 of 2 0 Boise Cascade Triple 1-3/4" x 16" VERSA-LAM® 2.0 2800 DF Floor Beam1FB01 Dry I 1 span I No cantilevers 1 0/12 slope Friday, May 8,2015 BC CALL®Design Report Build 3272 File Name: BM15 Job Name: Description: Designs\FB01 Address: Specifier: City, State,Zip: , Designer: Customer: Company: Code reports: ESR-1040 Misc: a 1 - - - - _ _ _y 1111 : : 1 Ly_ 1 - - - - - - it - = - � BO B1 B1 Total Horizontal Product Length=22-11-08 Reaction Summary(Down/Uplift) (lbs) Bearing Live Dead Snow Wind Roof Live BO,3-1/2" 3,465/0 2,336/0 261 /0 B1,3-1/2" 4,119/0 2,426/0 111 /0 Live Dead Snow Wind Roof Live Trib. Load Summary Tag Description Load Type Ref. Start End 100% 90% 115% 160% 125% 1 Standard Load Unf.Area (Ib/ft^2) L 00-00-00 22-11-08 40 10 00-06-00 2 FG04 Conc. Pt. (lbs) L 06-03-04 06-03-04 2,018 1,009 n/a 3 FT01's Unf. Lin. (lb/ft) L 07-00-00 22-11-08 320 160 n/a 4 WALL ABOVE Unf. Lin. (lb/ft) L 06-01-00 07-10-00 0 124 n/a 5 T03 ABOVE Unf. Lin. (lb/ft) L 06-01-00 07-10-00 212 212 n/a Controls Summary Value %Allowable Duration Case Location Pos. Moment 39,186 ft-lbs 77.4% 100% 1 10-06-15 End Shear 5,725 lbs 35.9% 100% 1 01-07-08 Total Load Defl. U271 (0.995") 88.4% n/a 1 11-02-08 Live Load Defl. U443(0.61") 81.3% n/a 4 11-02-08 Max Defl. 0.995" 99.5% n/a 1 11-02-08 Span/Depth 16.9 n/a n/a 0 00-00-00 %Allow %Allow Bearing Supports Dim.(L x W) Value Support Member Material BO Post 3-1/2"x 3-1/2" 5,800 lbs n/a 63.1% Unspecified B1 Post 3-1/2"x 3-1/2" 6,545 lbs n/a 71.2% Unspecified Cautions Member is not fully supported at post BO. A connector is required at this bearing. Member is not fully supported at post B1. A connector is required at this bearing. Notes Design meets Code minimum(U240)Total load deflection criteria. Design meets Code minimum(L1360) Live load deflection criteria. Design meets arbitrary(1")Maximum total load deflection criteria. Calculations assume Member is Fully Braced. Design based on Dry Service Condition. Deflections less than 1/8"were ignored in the results. Page 1 of 2 I Boise Cascade Triple 1-3/4" x 16" VERSA-LAM® 2.0 2800 DF Floor BeamIFB01 Dry I 1 span I No cantilevers 1 0/12 slope Friday, May 8,2015 BC CALL®Design Report Build 3272 File Name: BM15 Job Name: Description: Designs\FB01 Address: Specifier: City, State,Zip: , Designer: Customer: Company: Code reports: ESR-1040 Misc: Connection Diagram Disclosure b d be Completeness and verified by anyone who accuracy must would rely on a R\��i output as evidence of suitability for 1 1 � particular application.Output here based c /\� on building code-accepted design properties and analysis methods. 1 • I • /\/ Installation of BOISE engineered wood e ° products must be in accordance with 1 current Installation Guide and applicable building codes.To obtain Installation Guide or ask questions,please call a minimum=2" c= 11" (800)232-0788 before installation.\n\nBC b minimum=3" d =24" CALC®,BC FRAMER®,AJSTM, e minimum=3" ALLJOIST®,BC RIM BOARDTM BCI®, BOISE GLULAMTM,SIMPLE FRAMING Connection design assumes point load is top-loaded. For connection design of side-loaded SYSTEM®,VERSA-LAM®,VERSA-RIM PLUS® - , P oint loads, please consult a technical representative or professional of Record. VERSA-STRAN D®,VERSA-STUD®are Nailing schedule applies to both sides of the member. trademarks of Boise Cascade Wood Member has no side loads. Products L.L.C. Connectors are: 16d Sinker Nails Page 2 of 2 ®Bolse Cascade Double 1-3/4" x 16" VERSA-LAM® 2.0 2800 DF Floor Beam1FB01 Ill Dry I 1 span I No cantilevers 1 0/12 slope Tuesday, May 12, 2015 BC CALC®Design Report Build 3272 File Name: BM16 Job Name: Description: Designs\FB01 Address: Specifier: City,State, Zip: , Designer: Customer: Company: Code reports: ESR-1040 Misc: I 6 �I I I 1 II ..7 T T 7 • • T IMAHMIWIIP - 5 I 1 I u T T....7 T T T 7 T T 5 ' ' 1 i , ' I I III I 06-07-00 B1 BO Total Horizontal Product Length=06-07-00 Reaction Summary(Down/Uplift) (lbs) Bearing Live Dead Snow Wind Roof Live BO,3-1/2" 66/0 1,880/0 1,409/0 B1, 3-1/2" 66/0 1,997/0 1,526/0 Live Dead Snow Wind Roof Live Trib. Load Summary Tag Description Load Type Ref. Start End 100% 90% 115% 160% 125% 1 Standard Load Unf.Area(Ib/ft^2) L 00-00-00 06-07-00 40 10 00-06-00 2 T51 Conc. Pt. (Ibs) L 01-08-00 01-08-00 320 320 n/a 3 T52 Conc. Pt. (Ibs) L 03-08-00 03-08-00 320 320 n/a 4 T53 Conc. Pt. (Ibs) L 05-08-00 05-08-00 320 320 n/a 5 WALL ABOVE Unf. Lin.(Ib/ft) L 00-00-00 06-07-00 0 124 n/a 6 T24,T25,T25,T24 Unf. Lin.(Ib/ft) L 00-00-00 06-07-00 300 300 n/a Controls Summary Value %Allowable Duration Case Location Pos. Moment 5,052 ft-lbs 12% 125% 2 03-06-08 End Shear 2,081 lbs 15.6% 125% 2 01-07-08 Total Load Defl. U999(0.014") n/a n/a 2 03-03-08 Live Load Defl. U999(0.006") n/a n/a 5 03-03-08 Max Defl. 0.014" n/a n/a 2 03-03-08 Span/Depth 4.6 n/a n/a 0 00-00-00 %Allow %Allow Bearing Supports Dim.(L x W) Value Support Member Material BO Post 3-1/2"x 3-1/2" 3,289 lbs n/a 35.8% Unspecified B1 Post 3-1/2"x 3-1/2" 3,524 lbs n/a 38.4% Unspecified Notes Design meets Code minimum(L/240)Total load deflection criteria. Design meets Code minimum(U360)Live load deflection criteria. Design meets arbitrary(1")Maximum total load deflection criteria. Calculations assume Member is Fully Braced. Design based on Dry Service Condition. Deflections less than 1/8"were ignored in the results. Page 1 of 2 ®BoIse Cascade Double 1-3/4" x 16" VERSA-LAM® 2.0 2800 DF Floor Beam1FBO1 Dry 11 span I No cantilevers 1 0/12 slope Tuesday, May 12,2015 BC CALC®Design Report Build 3272 File Name: BM16 Job Name: Description: Designs\FB01 Address: Specifier: City, State,Zip: , Designer: Customer: Company: Code reports: ESR-1040 Misc: Connection Diagram Disclosure Completeness and accuracy of input must �i b{� r d "� be verified by anyone who would rely on a I I I EB. output as evidence of suitability for %` • particular application.Output here based C T on building code-accepted design properties and analysis methods. ; Installation of BOISE engineered wood /1 products must be in accordance with • �� current Installation Guide and applicable building codes.To obtain Installation Guide or ask questions,please call a minimum=2" c= 12" (800)232-0788 before installation.\n\nBC b minimum=3" d=24" CALC®,BC FRAMER®,AJSTM, ALLJOIST®,BC RIM BOARD ,BCI®, Connection design assumes point load is top-loaded. For connection design of side-loaded BOISE GLULAMTM SIMPLE FRAMING point loads,please consult a technical representative or professional of Record. SYSTEM®,VERSA-LAMS,VERSA-RIM PLUS®,VERSA-RIM®, Member has no side loads. VERSA-STRAND®,VERSA-STUD®are Connectors are: 16d Sinker Nails trademarks of Boise Cascade Wood Products L.L.C. ill II Page 2 of 2 4 , , BCS BUILDING COMPONENT SUPPLY, INC. 4627 JP HALL BLVD. SUITE 208 GREEN COVE SPRINGS, FL 32043 0: 904.297.9390 F: 904.529. 1406 BEARING HEIGHTS s°'°° 8 1 01— 1 1 /8 rift. 1$414e +.,,. c.0 .$0,0 1 L //// 1 2'- 1 1 /a" 111111111111111111111PU:.. .. l retrial 2 0' 7.. � ro ■3--II rie� 41 I` 1 / 1 8' - 1 1■In1 � ■mii iii. I%///f/% 25' 7" //_/ �• III ___ im § ai°Iu1Er W`I*I Two STORY _ THIS IS A TRUSS PLACEMENT 1 I11E. ■i=_ D FOYER ��� ��� • DIAGRAM ONLY. d�11i1�Ivo II�. These trusses are designed as w���� "■■ individual budding components as be ��> rim: — ,�_>_>'_�"'�_ incorporated into the building design at _m Iamw ! ■E a the specification of the building *'_���IA �i �I i designer. See individual design sheets �� F _ ._:��I iii Ili •�i 'i for each truss design identified on the �� placement drawing.The building =yid\I ,;�I designer is responsible for temporary and permanent bracing of the roof and Mil=1 "!I II=I floor system and for the overall I ■!I structure.The design of the truss �_I I support structure including headers, IIII-I �IMMIII beams,walls, and columns is the �_I responsibility of the building designer. _I �'� I For general guidance regarding 5:� �1y1 bracing,consult"Bracing of Wood "1 I • i a27rit Trusses"available from the Truss Plate ^ '� ����� Institute, 583 D'Onifrio Drive; Madison, _I� WI 53179. xe. x"61 I11-i1k. ATTENTION. Refer to truss layout and engineering SI 44... I 054,,, .... I documents that arrive with delivered MGM field trusses. Preclude Wror iron Annecter°e1 Unless noted otherwise, all beams are PIOdD Length Product Pees Net City Menu( Product City 8143 1710-08 1 3/4"x 14"LVL 2 2 —MP .1US24 10 by others. 6)415 22-11-00 1 3/4"x 18"LVL 3 3 USP THD26.2 4 BM16 6.07-00 1314-x 16'LVL 2 2 USP TH028-21F 1 TOLL USP THDH28-2 1 CLIENT USP THDH28-3 1 BROTHERS USP TH0213 1 USP TH046 15 ATLANTIC BEACH SUBDIVISION AMBASSADOR MODEL CATALINA ELEVATION SHINGLE LOT # DRAWN BY RAS DATE FIRST FLOOR LAYOUT 119 05/1 3/201 5 SCALE: NTS REF 7035 .ma a� ii►.,i 1.1 411 .. Ill — ,.,,a. ..t.,, ..... i'MI_ IY ii MEN E ; ■�1���fii d ■M MIN I II LIEN All��ES∎INk limo_ Ests../....... i A Fri! iq...: ilnai EE EEE ,rim i�� NI S : :2 IIIIII1IIIGIUU . a � � inr• __ BM3 BOTTOM n 1 AT 9-7-10 wrom 'an „u- . • J . USP THD20 17 SECOND FLOOR LAYOUT SCALE: NTS 1 .WO PM i Sal 41 ir•Ali OW. kali ,.„. .,..> s„d .0601 AIL JI willototm i iiii it MIR-IMELBMirri; Alls �t"'VA�i l .,_-...-.....r.........rAw.______.nt iwo. -hi lw,m -iv.pggi dll AMU IIMMIIMPIWII i I 0 wrai, tK2 NNA!NAAA!!!IMINNINN = 'K2 � ION BM7 BOTTOM sr.. 1 AT 97.10 a. woo Rod Taws Connector list Manta Product ay USP JUS24 2B USP THO26 17 SECOND FLOOR LAYOUT SCALE: NTS ,„, 2,, ,,, B C S BUILDING COMPONENT SUPPLY, INC. 4627 JP HALL BLVD. SUITE 208 GREEN COVE SPRINGS, FL 32043 i, 0: 904.297.9390 F: 904.529. 1 406 BEARING HEIGHTS CO 8. 1 1 0 1- 1 1 /811 .. 1,1t MIIMIEVIIMUlill, --11111,11.1•11111•41•111114, 1 21- 1 1 /8' 3 2 01 - 7" II!1flhiii'IHUiIHhI!41lN1_:]I3 To lli�'�I eI ' s %////i 1 81 - 1 1 II ■ INHIS ■I�rAaoh i:" //�,. � IMF/% �� 1/ 251 - 711 AIM" lim 1 MIMIC i--�E T OYERRY HUY ' " �I THIS IS A TRUSS PLACEMENT , 'I�1ii'r1 '�—�' ��� DIAGRAM ONLY. `",._ *trip!1 r-I These trusses are designed as .iy' - I. �" individual building components to be (!� �5 ■771„17,1 i •—•—•—•—•�. ,__._ ._.! ,� incorporated into the building design at �N �I • P 1.1.M=' �I`i� 1 8 the specification of the building �� F'a i ®I �I ; designer. See individual design sheets !=11 1ril'l �1 for each truss design identified on the placement drawing. The building Il i �' designer is responsible for temporary• TiTiiiiO ! and permanent bracing of the roof and• _�'�����I��.R�j�� I For general guidance regarding SIM1_I ' bracing,consult"Bracing of Wood I t ��: Trusses"available from the Truss Plate trui 1111101111111.111EMIllt .��. Institute, 583 Onifrio Drive; Madison, I � I 11�I `�: ,��, t'�y WI 53179. e 5 D' ,_._,_._._._._,_._, I.'..05, ATTENTION. I 405411 �W Refer to truss layout and engineering "°°°° documents that arrive with delivered Produeb - IFloo,Truss Connector Lai field trusses. P 1313 Lanpth Product Pies Net�ly �FAanuo Product a,�. Unless noted otherwise, all beams are BM3 17d 13N'x14'LVL 2 2 USP JUS24 IS by others. -BLt-1D 22.11.00 1 3JP x 1T LVL 3 3 - USP TH026-2 4 y BM16 6-07-00 1 3q'x 10"LVL 2 2 USP THD28-21F 1 USP THOH28.2 1 TOLL LISP THDH28.3 1 CLIENT USP TM028 1 BROTHERS USP THD46 IS SUBDIVISION ATLANTIC BEACH AMBASSADOR MODEL CATALINA ELEVATION SHINGLE LOT # DRAWN BY RAS DATE FIRST FLOOR LAYOUT 119 05/1 3/201 5 SCALE: NTS REF# 7035