Loading...
1705 MARITIME OAK LN - TRUSS LAYOUT REV BCS1 BUILDING CM 4627 JP HALL BLVD. SUITE 208 GREEN COVE SPRINGS, FL 32043 F: 9 0 4.S 2 9. 1 40 6 BEARING HE113HTS IT 9 1- 1 I /B" 19, - 7 bd -1— 12 1- 1 1 /B'I SECOND FLOOR LAYOUT THIS IS A TRUSS PLACEMENT DIAGRAM ONLY. SCALE: NTS These trusses are designed as individual building components to be Incorporated Into the building design at the specification of the building designer.See Individual design sheets for each truss design identified on the placement drawing.The building designer is responsible for temporary and permanent bracing of the roof and floor system and for the overall .. .... ... ... structure.The design of the truss support structure including headers, beams,walls,and columns is the responsibility of the building designer. -45B For general guidance regarding bracing,consult"Bracing of Wood Trusses"available from the Truss Plate K6F Institute,583 D'Onifrio Drive; Madison, WI 53179. ATTENTION. F Ir Refer to truss layout and engineering documents that arrive with delivered R.�f I I;.R,.�t. field trusses. Unless noted otherwise,all beams are PQLIY, by others. CLIENT TOLL BROTHERS EUP zij Truss Conn W L�t To SUBDIVISION ATLANTIC BEACH HERITAGE -T r7 1 USP MSH422 9 USP THDH26-3 1 MODEL ANASTASIA ELEVATION COASTAL j r r r T- — -r T -T CIRAwN a LOT # RAS CAT FIRST FLOOR LAYOUT L ID Length Pmdud Plies N SCALE: NTS r�uj �uu-uu I jjq x 16 LVL 2 07/1 4/20 1 5 093 —:R 730 rn B-C C> BUILDING QDMPONENT SUPPLY, INC. 4627 JP HALL BLVD. SUITE ZOS GREEN COVE SPRINGS, FL 32043 0: 904.297.9390 F: 904.529. 1 406 BEARIN13 HEIGHTS p p p �p �4 Tp Up p TJ� 4 Ll- f 4-4-4-4- R��L 9 1- 1 1 /B" M 21 1 0'- 1 1 /B S 11 I C), 7 CO) M 1 2'- 1 1 /B'I SECOND FLOOR LAYOUT THIS IS A TRUSS PLACEMENT DIAGRAM ONLY. SCALE: NTS These trusses are designed as individual building components to be Incorporated Into the building design at the specification of the building designer.See individual design sheets for each truss design Identified on the placement drawing.The building designer is responsible for temporary and permanent bracing of the roof and floor system and for the overall Fi 71 structure.The design of the truss support structure including headers, beams,walls,and columns Is the p p p p p 41- p pip 4 4 i 4 pl 4 p 4 4 l� 4 s 4 4 responsibility,of the building designer. For general guidance regarding 4- bracing,consult'Bracing of Wood Trusses"available from the Truss Plate Institute,583 D'Onifrio Drive;Madison, WI 53179. ATTENTION. 2 r Refer to truss layout and engineering documents that anive with delivered field trusses. Unless noted otherwise,all beams are USP JUS24 8 by others. USE THD26 6 CLIENT TOI-L BROTHERS El� F SUBDIVISION ATLANTic BEACH HERITAGE DH2�3 USE TZ... 1 MODEL ANASTASIA ELEVATION COASTAI- q lip p p 7[, , , =11 '5 p p skkkipp 9 RAWN By L LOT # RAS z FIRST FLOOR LAYOUT Beams DATE Net a SCALE: NTS AD-01 �J�314�SX'16 LVE-- 2 2 07/14/20IS 093 B-C C> BUILDING QOMPONENT SUPPLY, INC. 4627 JP HALL BLVD. SUITE ZOS GREEN COVE SPRINGS, FL 32043 0: 904.297.9390 F: 904.529. 1 406 BEARIN13 HEIGHTS 4-4-4-4- 9 1 1 /B" M 21 10'- 1 I /B 11 I C), 7 ��A CO) M 9.4�=L 1 2'- 1 1 /B 11 SECOND FLOOR LAYOUT THIS IS A TRUSS PLACEMENT DIAGRAM ONLY. SCALE: NTS These trusses are designed as individual building components to be Incorporated Into the building design at the specification of the building designer.See individual design sheets for each truss design Identified on the placement drawing.The building designer is responsible for temporary and permanent bracing of the roof and floor system and for the overall 71 structure.The design of the truss responsibility,of the building designer. For general guidance regarding bracing,consult'Bracing of Wood Trusses"available from the Truss Plate 'a, Institute,583 D'Onifrio Drive;Madison, WI 53179. ATTENTION. Ell r If Refer to truss layout and engineering documents that arrive with delivered field trusses. 7 711 Mimut P.d.d Qty Unless noted otherwise,all beams are by others. I us 8 lisp THD26 6 L 7 E- CLIENT TOI-L BROTHERS ATLANTic BEACH SUBDIVISION HERITAGE UlsV MSH422 44+11 — i DH2�3 USE TZ... 1 MODEL ANASTASIA ELEVATION COASTAI- ip 0 4 5 p p ;' lip p p p p p 5 p 4 p p T. RAS LOT # DRAWN BY DATE FIRST FLOOR LAYOUT Beams .7 IU Em'm I.... Plies N I.El l-EEEE� I.1� s I. LEL nV1 07/14/201S SCALE: NTS 093 B-C C> BUILDING QOMPONENT SUPPLY, INC. 4627 JP HALL BLVD. SUITE ZOS GREEN COVE SPRINGS, FL 32043 0: 904.297.9390 F: 904.529. 1 406 BEARIN13 HEIGHTS 4-4-4-4- 9 1- 1 1 /B" 21 1 0'- 1 1 /B I C), 7 11 I,�A CO) EEL LLLI�' M 1 2'- 1 1 /B'I SECOND FLOOR LAYOUT THIS IS A TRUSS PLACEMENT DIAGRAM ONLY. SCALE: NTS These trusses are designed as individual building components to be Incorporated Into the building design at the specification of the building designer.See individual design sheets for each truss design Identified on the placement drawing.The building designer is responsible for temporary and permanent bracing of the roof and floor system and for the overall Fi structure.The design of the truss beams,walls,and columns Is the responsibility of the building designer. For general guidance regarding bracing,consult'Bracing of Wood Trusses"available from the Truss Plate Institute,583 D'Onifrio Drive;Madison, WI 53179. ATTENTION. r Refer to truss layout and engineering documents that arrive with delivered T�ss Connedor L field trusses. Qty 7 Menu Unless noted otherwise,all beams are USP JUSN 8 by others. USE THD26 6 CLIENT TOI-L BROTHERS El- Tsa ATLANTic BEACH SUBDIVISION HERITAGE USE THDZ2Z'3 1 MODEL ANASTASIA MEN ELEVATION COASTAL 55 a2 DRAWN BY LOT # RAS DATE FIRST FLOOR LAYOUT Beams ' .1 1 ". a'.V 07/14/201S L �12 SCALE: NTS 1 LV 093 RKF 6730