920 MAYPORT RD - RIGHT OF WAY REVIEW ,..../
• //r i J CITY OF ATLANTIC BEACH
,% DEPARTMENT OF PUBLIC WORKS
i ) 1200 Sandpiper Lane
(4/I Atlantic Beach,FL 32233-4318
MI 14 6 TELEPHONE:(904)247-5834
� ., . FAX:(904)247-5843
r, ,: www.coab.us
CONTRACTOR: DATE: 6-3-15
Flint Construction Services ,J E7 TH-990&15-GRDN-991
1817 3rd St. P t ADDRESS: 920 Mayport Road.St.
Jacksonville Beach, FL 32250 I
•
EMAIL: flintr()comcast.net 2ND REVIEW& DENIAL 6-2-15
Permit applications(referenced above)have been y the Public Works Department for the
reasons listed below. Please submit this information at your earliest convenience in order that we may
approve your application. If you have any questions,please contact Doug Layton, Public Works Director
at 904-247-5834 or email dlayton @coab.us.
lt
PUBLIC WORKS CORRECTION ITEMS: i
0(Submit the following information to the Public Works Department)
**'rov':e ••nst do site g em- p :n,inc •din; loca •an of• mpster and portable totr et.
* Ri: t-o?W. , Pe 't': requ' ed' using ugh of-w y •r construction parking.
*.•ore t o• 0%i - • rvious •at allowed • City ' :de. 1
**It doe• of appear that adeq .to stormwater stora:- is being provided.
PUBLIC WORKS CONDITIONS OF APPROVAL:
(The following comments will be printed on your permit as Conditions 11 ov
**All concrete driveway aprons must bethick,4000 psi,with fibermesh from the edge oi } to the
property line. Reinforcing rods or mesh area not allowed in the right-of-way. ((�P
✓ **Full erosion control measures must be installed and approved prior to beginning any earth disturb' activities.
Contact Public Works(247-5834)for Erosion and Sediment Control Inspection prior to start of construction.
**All silt must remain on-site during construction.
✓ **If on-site storage is required,a post construction topographic survey documenting proper construction will be
required.
.-- **Roll off container company must be on City approved list and container cannot be placed on City Right-of-Way.
(Approved:Advanced Disposal,Realco,Republic Services,Shappel's and Waste Pro.)
j **Any utility cuts in the road must be repaired using COJ Standar tail Case X and must be overlaid 10 feet in
1 each direction from the center of then cut. Repair must be shown o a .
- /....a, Cs t.c e"- P
• Art k- yr %2((r" / pAc.o£fj
- D,..A1 rer3-- i ?o21.- A -J[.N..J z "v.r ,Att 4 -DO 0e-4o .
D
cc: Jennifer Walker,Bldg. Dept.
4lli" 4-SPNfrLi- •A-r c L /—eS .f4e .✓♦ i A-[ L• v-+E-) /i.J "14-44- •44-/'- e •''
�E a_v,c d U.S . (f5 L� Lli.• ,Gp PL 2' S To.J e ,
•
t � : (5 CITY OF ATLANTIC BEACH
"/ DEPARTMENT OF PUBLIC WORKS
V� 1200 Sandpiper lane
`I Atlantic Beach.FL 32233-4318
TELEPHONE:(904)247-5834
FAX:(904)247-5843
www.coah.us
CONTRACTOR: DATE: 5-5-15
Flint Construction Services PERMIT#s 15-COTH-990& 15-GRDN-991
1817 3rd St. ADDRESS: 920 Mayport Road. St.
Jacksonville Beach, FL 32250
EMAIL: flintr @comcast.net
Permit applications(referenced above)have been denied by the Public Works Department for the
reasons listed below. Please submit this information at your earliest convenience in order that we may
approve your application. If you have any questions, please contact Doug Layton,Public Works Director
at 904-247-5834 or email dlavtoni coab.us.
PUBLIC WORKS CORRECTION ITEMS:
(Submit the following information to the Public Works Department)
**Provide construction site management plan,including location of dumpster and portable toilet. Right-of-Way
01j ''Permit is required if using right-of-way for construction parking.
be,acct of pla tb.+nmllatiarrdetaits.
t q * t, •'•. -P-ermil-lFiK�sts ter..)
e (, ` c .
**t I +no f.mu. . n• .Ise I• tio hoii sto_rEtsin-runoff.
PUBLIC WORKS CONDITIONS OF APPROVAL:
(The following comments will be printed on your permit as Conditions of Approval)
**A11 concrete driveway aprons must be 5"thick,4000 psi,with fibermesh from the edge of pavement to the
property line. Reinforcing rods or mesh area not allowed in the right-of-way.
**Full erosion control measures must be installed and approved prior to beginning any earth disturbing activities.
Contact Public Works(247-5834)for Erosion and Sediment Control Inspection prior to start of construction.
**All silt must remain on-site during construction.
**lf on-site storage is required,a post construction topographic survey documenting proper construction will be
required.
**Roll off container company must be on City approved list and container cannot be placed on City Right-of-Way.
(Approved:Advanced Disposal,Realco,Republic Services,Shappel's and Waste Pro.)
**Any utility cuts in the road must be repaired using COJ Standard Detail Case X and must be overlaid 10 feet in
each direction from the center of the cut. Repair must be shown on the plans.
cc: Jennifer Walker, Bldg. Dept.
r
.
____cr-Lak___ ,__ ,j, f i
------9-r-i<
__2_r____„____Jw________________________________
__ _____________________ ______ _____ __
___
____ ______ _ __________________ ___ _
__ ___________ 7____ ___ ______ ___ ___ ____________
,_&_-__y__6_______ _ __ _
____
_ _ ________ ___
_________________ _ _ _
______ ___________ _____
. _________ ___________ _
_____ ____________ ________
______________ _ _ _ _
_______________
_____9_4„____ ____________________
._,, ,_______ I
lr
______________ _ ___
_ _________________ ___ ____ _______________
__________ ______ ________ _ _
__________________ _ ___________
z _.4_,,,,_,_ ___ _
____ _ ___________________
____________ _______
___________
______________ _____________ ___________
4,
_z_._ _!,,_ 17 _
k_4_7_
________________--
Mien_ ______
54_4K 4 _______e_rjk >f_g_i________ -_____ ----- ----------
Basins......_. _= ===.,.�____�..__°_________ _ =n ...........
.___
Name: Pond 1 Node: Pond 1 Status: Onsite
Group: BASE Type: SCS Unit Hydrograph CN
Unit Hydrograph: Uh484 Peaking Factor: 484.0
Rainfall File: Flmod Storm Duration(hrs): 0.00
Rainfall Amount(in): 0.000 Time of Conc(min): 10.00
Area(ac): 0.122 Time Shift(hrs): 0.00
Curve Number: 85.00 Max Allowable Q(cfs): 999999.000
DCIA(%): 0.00
Name: Pond 2 Node: Pond 2 Status: Onsite
Group: BASE Type: SCS Unit Hydrograph CN
Unit Hydrograph: Uh484 Peaking Factor: 484.0
Rainfall File: Flmod Storm Duration(hrs): 0.00
Rainfall Amount(in): 0.000 Time of Conc(min): 10.00
Area(ac): 0.098 Time Shift(hrs): 0.00
Curve Number: 89.00 Max Allowable Q(cfs): 999999.000
DCIA(%): 0.00
Name: Underground Node: Underground Status: Onsite
Group: BASE Type: SCS Unit Hydrograph CN
Unit Hydrograph: Uh484 Peaking Factor: 484.0
Rainfall File: Flmod Storm Duration(hrs): 0.00
Rainfall Amount(in): 0.000 Time of Conc(min): 10.00
Area(ac): 0.260 Time Shift(hrs): 0.00
Curve Number: 97.00 Max Allowable Q(cfs): 999999.000
DCIA(41: 0.00
==== Nodes
Name: 9th Base Flow(cfs): 0.000 Init Stage(ft): 10.350
Group: BASE Warn Stage(ft): 10.350
Type: Time/Stage
Time(hrs) Stage(ft)
0.00 10.350
36.00 10.350
Name: Pond 1 Base Flow(cfs): 0.000 Init Stage(ft): 9.000
Group: BASE Warn Stage(ft): 11.000
Type: Stage/Area
Stage(ft) Area(ac)
9.000 0.0076
10.500 0.0301
11.000 0.0384
Name: Pond 2 Base Flow(cfsl: 0.000 Init Stage(ft): 10.000
Group: BASE Warn Stage(ft): 11.000
Type: Stage/Area
Stage(ftl Area(ac)
10.000 0.0014
10.500 0.0059
11.000 0.0108
Name: Underground Base Flow(cfs): 0.000 Init Stage(ft): 8.170
Group: BASE Warn Stage(ft): 10.500
Interconnected Channel and Pond Routing Model(ICPR) 02002 Streamline Technologies,Inc. Page 1 of 3
Type: Stage/Area
Stage(ft) Area(ac)
8.170 0.0218
10.500 0.0218
.... Pipes -...===..................... ... .. .....
Name: P1 to P2 From Node: Pond 2 Length(ft): 115.00
Group: BASE To Node: Pond I Count: 1
Friction Equation: Automatic
UPSTREAM DOWNSTREAM Solution Algorithm: Most Restrictive
Geometry: Circular Circular Flow: Both
Span(in): 12.00 12.00 Entrance Loss Coef: 0.00
Rise(in): 12.00 12.00 Exit Loss Coef: 1.00
lnvert(ft): 10.000 9.000 Send Loss Coef: 0.00
Manning's N: 0.011000 0.011000 Outlet Ctrl Spec: Use dc or tw
Top Clip(in): 0.000 0.000 Inlet Ctrl Spec: Use dc
Bot Clip(in): 0.000 0.000 Stabilizer Option: None
Upstream FHWA Inlet Edge Description:
Circular Concrete: Square edge w/ headwall
Downstream FHWA Inlet Edge Description:
Circular Concrete: Square edge w/ headwall
Name: P1 to UG From Node: Pond 1 Lengthlft): 37.00
Group: BASE To Node: Underground Count: 1
Friction Equation: Automatic
UPSTREAM DOWNSTREAM Solution Algorithm: Most Restrictive
Geometry: Circular Circular Flow: Both
Span(in): 12.00 12.00 Entrance Loss Coef: 0.00
Rise(in): 12.00 12.00 Exit Loss Coef: 1.00
Invert(ft): 9.000 8.500 Bend Loss Coef: 0.00
Manning's N: 0.011000 0.011000 Outlet Ctrl Spec: Use dc or tw
Top Clip(in): 0.000 0.000 Inlet Ctrl Spec: Use dc
Bot Clip(in): 0.000 0.000 Stabilizer Option: None
Upstream FHWA Inlet Edge Description:
Circular Concrete: Square edge w/ headwall
Downstream FHWA Inlet Edge Description:
Circular Concrete: Square edge w/ headwall
==s= Drop Structures _____________ ____.____.
Name: Control From Node: Underground Length(ft): 41.00
Group: BASE To Node: 9th Count: 1
UPSTREAM DOWNSTREAM Friction Equation: Automatic
Geometry: Circular Circular Solution Algorithm: Most Restrictive
Span(in): 12.00 12.00 Flow: Both
Rise(in): 12.00 12.00 Entrance Loss Coef: 0.000
Invert(ft): 8.600 8.500 Exit Loss Coef: 1.000
Manning's N: 0.011000 0.011000 Outlet Ctrl Spec: Use dc or tw
Top Clip(in): 0.000 0.000 Inlet Ctrl Spec: Use dc
Rot Clip(in): 0.000 0.000 Solution Ines: 10
Upstream FHWA Inlet Edge Description:
Circular Concrete: Square edge w/ headwall
Downstream FHWA Inlet Edge Description:
Circular Concrete: Square edge w/ headwall
••' Weir 1 of 1 for Drop Structure Control •••
TABLE
Count: 1 Bottom Clip(in): 0.000
Type: Horizontal Top Clip(in): 0.000
Flow: Both Weir Disc Coef: 3.200
Interconnected Channel and Pond Routing Model(ICPR) 02002 Streamline Technologies,Inc. Page 2 of 3
Geometry: Rectangular Orifice Disc Coef: 0.600
Span(in): 24.00 Invert(ft): 10.500
Rise(in): 36.00 Control Elev(ft): 10.500
--_- Hydrology Simulations _-_--- --_
-
Name: post025
Filename: C:\Users\Doug\Documents\enVision\projects\Moto Electric + Atlantic Beach\Calculations\Stormwater\ICPR\post02
(
Override Defaults: Yes
Storm Duration(hrs): 24.00
Rainfall File: Flmod
Rainfall Amount(in): 9.80
Time(hrs) Print Inc(min)
30.000 5.00
Name: postmean
Filename: C:\Users\Doug\Documents\enVision\Projects\Moto Electric + Atlantic Beach\Calculations\Stormwater\ICPR\postme
Override Defaults: Yes
Storm Duration(hrs): 24.00
Rainfall File: Flmod
Rainfall Amount(in): 5.10
Time(hrs) Print Inc(min)
30.000 5.00
-- Routing Simulations
Name: post025 Hydrology Sim: post025
Filename: C:\Users\Doug\Documents\enVision\Projects\Moto Electric • Atlantic Beach\Calculations\Stormwater\ICPR\post02
Execute: Yes Restart: No Patch: No
Alternative: No
Max Delta 2(ft): 1.00 Delta Z Factor: 0.00500
Time Step Optimizer: 10.000
Start Time(hrs): 0.000 End Time(hrs): 24.00
Min Calc Time(sec): 0.5000 Max Calc Time(sec): 60.0000
Boundary Stages: Boundary Flows:
Time(hrs) Print Inc(min)
999.000 15.000
Group Run
BASE Yes
Name: postmean Hydrology Sim: postmean
Filename: C:\Users\Doug\Documents\enVision\Projects\Moto Electric + Atlantic Beach\Calculations\Stormwater\ICPR\postme
Execute: Yes Restart: No Patch: No
Alternative: No
Max Delta 2(ft): 1.00 Delta 2 Factor: 0.00500
Time Step Optimizer: 10.000
Start Time(hrs): 0.000 End Time(hrs): 24.00
Min Calc Time(sec): 0.5000 Max Calc Time(sec): 60.0000
Boundary Stages: Boundary Flows:
Time(hrs) Print Inc(min)
999.000 15.000
Group Run
BASE Yes
Interconnected Channel and Pond Routing Model°CPR) 02002 Streamline Technologies,Inc. Page 3 of 3
w
O
4)
oD
0.
0
IV
441 N o a M N N
24.1 y
o m N M
O MMm.-ley a 0
O
0
U
MC 0+N ID IOMO N
v v N N v
rnvv vm r F"
-I 4)h m T M M v
5
CO N!- N1D Y
$O mlomm M •
00.+000
.0y
O
N
N NNONNN
L 000000
_
N N N N N N (�
0
H U
a wwwwww N b
� 0
0000 0
0
by
G
O
OG
C .-IN O.-IN O ro
I C G
0 0 0 0 0 0
0 0 0 0 0
0 N O O
0 0 14 b
m m aw a o
0l y
d d
g g �
c
os
C 6 Y J0 6 0 0
O N*40400I0
i
000000 Q a a W
y G
0
2
N
C
c..
0
0
au
R
33 3 W 0 M r N O O.O.O.
b 0.- ,OMm mOMNm
i V O H O N 0 0 0 0
0
0 3 0 OrNmOMWO
E.01 t O.- O O O N O)N
F•H O N N N ON.+N
H H H H H H
o
•' 3 h Nor 0O),N0
0O.I U 0M0 .m.OMO.•
N H O N O O O O
C
H
030 00000)00U)
E O U 000004010H
F W N N N N N H N N
CHHHHH.-.H H
W R)N O HO)HOOM H
H m u
0U) 0... n
NQ W ..fitVO) .-.
U
S G
.D NL
0001-0000
UMW 0.00,0.0,0
•-.b 00000000 •00
D N 00000000
0
00000000
0
PJ
b•AI+�
./1000.n000
U
c O•W MOO.nM OO.f)
ti N
4N O.y.-)OOHHO 0
'• WN .04D0)0.0000) 71
M N W Mmm)^M.D.Dm s..
+� 00000000 fI)
m
O
O
0 0 w 00 O.00000
D .. 0.')000NN N
F L O N N N O N CO N 0.1
m H H H H H Q
2
c 0.nm.nc ccc —y
O N N N N q .0 0 .0
00000000
V OVvVEEEE ��0�•.
H 00000)0001 G
a a d a aaaa
Oa a
4 O F
0
0. W W W W W W W W C
a
R
V
u.+N'O.c H N 0
Cu
0
Z C C O m C c O TJ
0..W 0 o.o ..4 U
m y 0
0 V G
O
1
N
0
0
.. wu 000l.n001
M m
£ qP 4+ r M b 0
.' 000000
N
0
O N S7 00 m000
.1 qP la O NOON N
F L O N N O N N
410
SO
:. 0 4.) m m 0 m 0 0
4 q W r m m N b b
000000
m
m
coo mo000
] C
LP 1. 0 0 O N N N a)
e C
F L N N N N N N •0
N N.-1,. 0
T D C
.0
04 bm M U)m M
o
q Y1 M r m N b.-1 L,
M O O O.4 1n O.1 N C"
O
r1
000000
C 1
E
co
% 3 H N P M m m m Y
4 0 V m1nM WNM
4. N0.-1000
0 U mN r a om 2
—S
F W NNNN.-.N 1.r..
E U
u q 0.1 Np 0Voo)01p n 8oc
c 0
OOO 00
O ua1uR N a0 AWa/ i
Q.
co
la 7
.b 4W =00m0)0 m 0 ggdgQQ
is
V
C
co
co
E 1.
U
0 0..D
0 a�0 f.)
V CU DM d W d
0
C)
O
0
eo
a
d
MM .DN
E 0 co I-
N N 0
rI vW
O
0
U
G
E o r y
EN Q N E
LO
N
0 t0 rf
Rf
z0/ N u/
•-•
0
0
0
� N
01 NN
E= O O _✓/
N N W
E N y C.
0
CDE U
H v
a m�
04
0
C4
O 01
w u
A
co) C.
C
cd
d
[O
o N o U
dE
to
a II!
0. cUi
- e
0
0
U
1-�
•
0
01
CL.
•: 3 n 0 0
• sou o0
w 00
u
0
D 3 of 0 0
M OI. 0
N W 0 0
N
.60
£
3 W v a
X I u N /1
W r .-.
0
N
E O 1°fi 0o°
•.i.-1.0
F[ N-..N.
N
£
w .ON 00
N M L
0 N w
6.0 Q
V
u 0141 000
1 10 0 0
0 H O O
0 0
0
P d L .11
ow en el
b O O C
G
l0
£(w ri • �+
a 0 0 0
m .-1 N
O
yy d N 00 C9
6 PL 00
F N L 0 0
a
CJ
C N C
O N W d
dE 0
1 Q.4
8
m 0—
0
oC
0. corn C
0
(0 W) a..
-a
m
C
as
E �5 U
Z 0 0 —
U
C
C
0
F
d
POST— PEVELOPrwl6tv I
yt�
� C
a
_-_ W
S
fV
0
U
X
M
a°
d r
o a a• t U
'! .., u� F:0 r
a , C
0O ••
NA R ti 4U1� °� Q O,.lu
Iu.?vi pQNNyN 4.xi )OWCWG.W(a7
tl
,S? •'E (P P:^g)•• N .I O.3C U A 1C1 0:S W C..x
Comp. By: DLS
Date: 5/15/2015
Public Works Department
City of Atlantic Beach
Permit No: 15-GRDN-991
Address: 54 W. 10th St
Required Storage Volume
Criteria:
Section 24-66 of the City of Atlantic Beach's Zoning, Subdivsion, and Land Development Regulations
requires that the difference between the pre-and postdevelopment volume of stormwawter runoff be
stored on site. Volume of Runoff is defined as follows:
V=CAR/12
Where: V=Volume of Runoff
C=Coefficient of Runoff
A=Area of lot in square feet
R=25-yr/24-hr rainfall depth(9.3-inches for Atlantic Beach)
Predevelopment Runoff Volume:
Lot Area(A) = 20,912 ft2
Runoff Coefficient
Area Lot Area
Description (ft) (ft) "C" Wtd"C"
Impervious 15,930 20,912 1.00 0.76
Pervious 4,982 20,912 0.50 0.12
Runoff Coefficient(C)= 0.88
Runoff Volume
V= 0.88 x 20,912 x 9.3 / 12
V= 14,276 ft3
Postdevelopment Runoff Volume:
Lot Area(A) = 20,912 ft2
Runoff Coefficient
Area Lot Area
Description ft2) (ft2) "C" Wtd"C"
Impervious 16,077 20,912 1.00 0.77 %ISA= 76.9%
Pervious 4,835 20,912 0.50 0.12
Runoff Coefficient(C)= 0.88
Runoff Volume
V= 0.88 x 20,912 x 9.3 / 12
V= 14,333 ft3
Required Storage Volume
DV= Postdevelopment Runoff Volume-Predevelopment Runoff Volume
DV= 14,333 - 14,276
DV= 57 ft3
Retention COAt3 Calculation 9th Street 5/15/2015
10" Comp. By: DLS
iti Date: 5/15/2015
Public Works Department
City of Atlantic Beach
Permit No: 15-GRDN-991
Address: 54 W. 10th St
Provided Storage:
Elevation Area Storage
(ft) (ft2) (ft)
9.0 331 0 BOTTOM
10.5 1,312 1,232 TOB
Elevation Area Storage
(ft) (ft) (ft3)
10.0 62 0 BOTTOM
10.5 258 80 TOB
Elevation Area Storage
(ft) (ft2) (ft3)
8.2 948 0 BOTTOM
10.5 948 2,209 TOB
Inground storage=A*d*pf
A=Area= 2518.0
d=depth to ESHWT= 2.0
pf=pore factor= 0.3
Inground Storage= 1510.8 ft3
Required Treatment Volume= 57 ft3
Supplied Treatment Volume= 5,032 ft3
Retention COAB Calculation 9th Street 5/15/2015
Williams, Scott
From: Layton, Douglas
Sent: Friday, May 15, 2015 4:23 PM
To: Williams, Scott
Subject: FW: Fwd: Plan Review Comments 920 Mayport Rd.
Attachments: Plan Review Comments 920 Mayport.pdf; COAB Calculation, 9th Street.xlsx; Drainage
Calculations, 9th Street, 5-7-15.pdf; C-4.1.pdf; C-4.2.pdf; C-5.7.pdf
Scott,
Goes with what you are reviewing.
Doug
From: Doug Skiles [mailto:doug(@envisionplusjax.com]
Sent: Thursday, May 07, 2015 3:49 PM
To: Layton, Douglas
Cc: tjackre108(4ahoo.com; 'Jason Canning'
Subject: FW: Fwd: Plan Review Comments 920 Mayport Rd.
Doug,
The comments regarding the drainage design were forwarded to me by Ted Jackrel. Please see the attached
spreadsheet for the City's calculation method. I also have the calculations for water quality and quantity attached that I
will use for the FDEP Self-Certification (in place of SJRWMD permit).
I would like to discuss the outfall with you before I send these to FDOT for a permit determination. While there is a curb
inlet on Mayport Road that we could make a direct connection to, it will likely encounter a conflict with the water main
that runs along that side. Therefore, I have it designed as an overflow at the catch basin in the right-of-way that will
match the pre-development drainage location. Of course,we are providing enough storage volume on site to reduce
the amount of runoff that will occur into the right-of-way.
Please call me at 881-6145 to discuss this at your convenience.
Thanks,
Doug Skiles, PE
EMIDN
O4siG. • rNGIWFFAIM`
2002 San Marco Boulevard, Suite 203
Jacksonville, FL 32207
904-881-6145
From:Ted Jackrel [mailto:tjackrel08 @yahoo.com]
Sent:Tuesday, May 5,2015 9:42 AM
To:Doug Skiles;Jason Canning
Subject: Fw: Fwd: Plan Review Comments 920 Mayport Rd.
gra: .
Ted Jackrel
Sales Manager
Moto Electric Vehicles and More
58 west 9th Street
Atlantic Beach,FL 32233
904-247-1818
904-247-2229 fax
tjackrel(a,motoelectricvehicles.com
On Tuesday, May 5, 2015 9:34 AM, Russell Flint<flintracomcast.net>wrote:
See plan review comments. Can you forward to the architect and engineer.
We can hand draw the location of the dumpster and protable toilet on the plans. I don't think we will need the
right of way permit.
Engineer can provide the erosion control details.
If we need the DOT permit,the engineer typically handles.
If we need the SJRWMD permit,the engineer typically handles.
Run off comments can be addressed by engineer.
Sincerely,
Russell Flint
President
Flint Construction Services, Inc.
P:904 994 9626
F: 904 372 9011
www.flintconstruction.net
Begin forwarded message:
From: "Showman,Lisa" <lshowman a,coab.us>
Subject: Plan Review Comments 920 Mayport Rd.
Date: May 5, 2015 at 8:53:17 AM EDT
To: "'flintr a,comcast.net"' <flintr@comcast.net>
Cc: "Layton,Douglas" <dlayton a,coab.us>, "Walker,Jennifer" <jwalker a,coab.us>
Attn: Russell Flint
See attachment for plan review comments from Public Works related to your permit applications for
920 Mayport Road (15-COTH-990 New Metal Bldg.& 15-GRDN-991 Site Dev.).Submit this information at
your earliest convenience in order that we may approved your applications. Instruction for submittal are
on the attachment.
Thank you,
2
Lisa Showman
Contracts, Permits&Admin. Coordinator
Public Works Department
City of Atlantic Beach
1200 Sandpiper Lane
Atlantic Beach, FL 32233
Phone(904) 247-5834
Fax(904)247-5843
email: Ishowmanc coab.us
PLEASE ADVISE HOW WE CAN ADDRESS THESE ISSUES ASAP SO WE MAY GET STARTED. PLEASE CALL ME
WITH A PLAN SO I CAN ADVISE RUSSEL
TED
3
OSZ1.5 'Be21 1J L9S63 '0N uo!lezuo43ny;o a;eoylp90 D N I cJ 3NIDND
5t71.9-1.88-1706 NO1S
woo•xe(s n!du opywa•mmm
LOZZ£epuoiA 'a!!!nuosper
'ad 'sa!P!S •1 se!6n00 £OZ al!nS `ruena!no8 ooJeIN ueS ZOOZ
a
0
A
U.1
F
\\\
a \ \\\\\\ U \ \\\\
x wisisi eii _ •\K_ w \\
c7 ■ft711S =1 v-\\\— 1
U.1 r.�.Illira.. — U
or : 2
iiiii
w = u
ININNIIMNIM == <t
w .o.•..•.. _
mammas .3
F .riirf f,.. ¢ 4._•:w e' W co c•i
Dili.. l L
Q
111!��1I a
Z 1-111— cn
c4 w CO c4
o 1=111
O° II— Z z
z— _j I I 0
w w 1-111-
x_
co c4 W' �I 11, v
x z
E-, \\\ _
X o \\\\ � - F w \\\\`
o \\
�r w ®` 1 F c: .;d .e SAT V)
o CO 2
L.
1 =..- LL,F- _ 1 — V u
Xx \ a wA ::
\ .-.3 1.1.1 1.1
¢O U.1 Lo.10 X <
0 0. \\ 4 \
Li
;v ' ' 0
C 0 'TJ
Z I-' "rJ
/ C N) '"d 0
II d 0 z
Cr1 Z
°
om ��
'v� t._,
0 I!/ ■ °
illr ci) CD C)
O //
1
/
-----/-6(.: ,
7 - 53
9
c..0 O
tp
n - o W
laJ
v
s
n'
V)
n O cn \I I.- Z
r
IF
0 -P 3
0
2002 San Marco Boulevard, Suite 203 Douglas L. Skiles, P.E.
(SI I ON Jacksonville, Florida 32207
www.envisionplusjax.com
904-881-6145
E N G I N F E R I N G Certificate of Authorization No. 29561 FL Reg. 51250
a-
r
00
T- N
a) C
O)1.0
CO
0.
'O 'O "0 'O
CD a' a) a)
> > > >
CO CO CO CO
aaaa
- c
R 'E0000
- , a- a-
U
ca.L
v-
V) H
I I
e
a
cc
N C
.0 (1)
U J
t
m
Q
O
U ll..
L
O -
LL a)
N a)
U 0 C O
a) m C
Oo OF
o m a L
Q C
L
0) J
0N- tirnco 0co (0 �'
I-
H
0 o o 0 O
5 v 0 0 0 c
> M O O O
F. 0000 EOOOO cV
to 0-
° 'DNL) cMO •cf U000CNO
0 0 0 N c sc O N
U) N- (00000
V a. o af ))
NtA 0. 0.
C O
M UO O -0 c1a- y )nN
`
° a) r O O O O a- c6
c C LL 0 0 0 0 0 cn ` a
a
O ..- -- 0 c U) 0)
2 V o O O O 2 C 0) n c
C a) c Q)
-c
_ a) CO J C 0 O
C as in 0 o 8 2 E
co fl.0 0 > N 'n L a- N 2) c0., u) ya- N En 2O f0 N V)sai C C L ca a) 'O -0 a) ca co 'O -0 a) U) Z N
a) 3 a) a) > 0 m c c a "- m c c 'O a) 2
co 0) - a`. 0- n a) as° tL° 0 - �
C9 m F= 0
Moto Electric Vehicles
Atlantic Beach, Florida
9th Street Site:
Required Treatment Volume(14.2 of 40C-42):
9th: Area (sf) Depth (in) Volume(cf)
Impervious 16053 1.25 1672
Total Site 20911 0.5 871
2543 (design condition)
Overall Pond 1 Size:
Elev(ft) Area(sf) Cum V(cf) Area (ac)
Top 11.00 1671 1978 0.0384
TV level 10.50 1312 1232 0.0301
Bottom 9.00 331 0.0076
Overall Pond 2 Size:
Elev (ft) Area(sf) Cum V(cf) Area (ac)
Top 11.00 470 262 0.0108
TV level 10.50 258 80 0.0059
Bottom 10.00 62 0.0014
Total Pond TV 1312 CF
Remaining Required TV 1231 CF
Additional Chambers Needed:
Volume Required = 1231 CF Volume per Chamber 31.0 CF
Plan Area per Chamber 23.71 SF
Reduction Factor 0.561
Elev(ft) Area (sf) Cum V(cf) Area(ac)
Top 10.50 948 1239 0.0218
TV level 10.50 948 1239 0.0218
Bottom 8.17 948 0.0218
Page 1 of 1
5/7/2015
I I /1
4 - CITY OF ATLANTIC BEACH
DEPARTMENT OF PUBLIC WORKS
1200 Sandpiper Lane
Atlantic Beach.FL 32233-4318
TELEPHONE:(904)247-5834
FAX:(904)247-5843
/ www.coab.us
CONTRACTOR: DATE: 5-5-15
Flint Construction Services PERMIT#s 15-COTH-990&15-GRDN-991
1817 3`d St. ADDRESS: 920 Mayport Road.St.
Jacksonville Beach, FL 32250
EMAIL: flintr @comcast.net
Permit applications(referenced above) have been denied by the Public Works Department for the
reasons listed below. Please submit this information at your earliest convenience in order that we may
approve your application. If you have any questions, please contact Doug Layton, Public Works Director
at 904-247-5834 or email dlayton @coab.us.
PUBLIC WORKS CORRECTION ITEMS:
(Submit the following information to the Public Works Department)
**Provide construction site management plan,including location of dumpster and portable toilet. Right-of-Way
Permit is required if using right-of-way for construction parking.
**Provide erosion and sediment control plans with installation details.
**Provide DOT Connection Permit for Stormwater.
**Provide SJRWMD Permit.
**All runoff must remain on-site. Cannot raise lot elevation without measures to retain runoff.
PUBLIC WORKS CONDITIONS OF APPROVAL:
(The following comments will be printed on your permit as Conditions of Approval)
**All concrete driveway aprons must be 5" thick,4000 psi,with fibermesh from the edge of pavement to the
property line. Reinforcing rods or mesh area not allowed in the right-of-way.
**Full erosion control measures must be installed and approved prior to beginning any earth disturbing activities.
Contact Public Works(247-5834)for Erosion and Sediment Control Inspection prior to start of construction.
**All silt must remain on-site during construction.
**If on-site storage is required,a post construction topographic survey documenting proper construction will be
required.
**Roll off container company must be on City approved list and container cannot be placed on City Right-of-Way.
(Approved:Advanced Disposal,Realco,Republic Services,Shappel's and Waste Pro.)
**Any utility cuts in the road must be repaired using COJ Standard Detail Case X and must be overlaid 10 feet in
each direction from the center of the cut. Repair must be shown on the plans.
cc: Jennifer Walker, Bldg. Dept.
r . '`�`h CITY OF ATLANTIC BEACH
800 Seminole Road 904-247-5800
1111111/117' Atlantic Beach,Florida 32233-5445 Fax 904-247-584!
SITE DEVELOPMENT PERMIT (for filling, grading or topographically altering land)
PLEASE SUBMIT(2)COMPLETE SETS OF PLANS WITH APPLICATION.
Date WA"
PERMIT#
Job Address L 4T3:i- - Z d e"y T r ISSUED BY THE CITY
Permitee: '� e� '9-70 D4_40,-1.•4 J 4-C/Crte L, Telephone# 90c'-83 S-61 /b-9
Permittee Address: /3 7 0 < <rrze Aver?.,z,a,z.
eL.acS. C..._
Email Address rnm 7t
o r) eVecrr Fax Fax Number. Qn'- 2-LI 7- 2.Z 2 9
Requesting Permission to commence site development involving the following activity: S -rE' wo¢• > -
V el 4 e 2 q r?� • cl w G re2.. i(Ze-r .rci- p a' A-71 d S C-LL 6 e2• p.
Location: (Reference to Cross-Street) 9 ST n-r,d m A-1 Ici O
The following permits have been submitted Tree Removal Demolition
THIS APPLICATION INCLUDES ALL INFORMATION REQUIRED BY THE CITY'S SITE DEVELOPMENT PERMIT
CHIECKLIST7 (Must be signed by Applicant)
1. Applicant de res that prior to filing this application he has ascertained the location of all existing
utilities, both aerial and underground and the accurate locations are shown on the sketches.
2. Any work proposed in City rights of way or easements shall be subject of a separate Right of Way and
Easement Permit Application.
3. All work shall meet City of Atlantic Beach, City of Jacksonville or Florida Department of Transportation
Standards and be performed under the supe ision of /2c,sstc_ r . (Contractor's
Project Superintendent) located at IIf7 lrI V. dr. Tyr �� 6 fL ? )ro Telephone#: Qoy- 5W-gG lC.
4. Calculations showing any increase in impervious area on owner's lot and / or in the city Right of Way are to
be included with this application.
5. All city property shall be restored to its original condition as far as practical, in keeping with city
specifications and the manner satisfactory to the city.
6. This permittee shall commence actual construction in good faith within P-1 days. If the beginning
date is more than 60 days from date of permit approval, then permittee must review the permit with the
Director of Public Works to make sure no changes have occurred in the area that would affect the permitted
construction.
7. The Director of Public Works shall be notified twenty-four (24) hours prior to starting work and again
immediately upon completion.
OWNER
LIZA CATRON
Signed: Date: yl urn " • Carmrsion#EE 126018
Before met is 47 day of 2.015 in the County of Duval, ▪ ExpwasNowaer30,2015
State Of Florida,has personally appeared and. ▪ M Babeanrutighhlwn� y�prp
P Y Pp �'1 Q�u-fed h '//�� �_��
Notary Public at Large,State of Florida,County of buval. / �`-
My commission expires: O1 301 2.015 Personally Known: C
LpL a-esQ�.�zd Produced Identification:
n a 3 3 n i r+d • n v s o ££ZZ£ "1d%peas 3puePF/7aaalS 416 to'
UM ,.
NfflSJ) ] tun t w ` t" U
say[ a �t.z ago�0 6 gf 1
E g a
z+'N o V
+ r.�!
:;\
$op
�.a t Io
a A
O
IoM -
i/ I
1 1 i 0 ./440 I.... . , .... .
,,,S,' LT, ,
1n...ZF�O ,bf??i' 'mgr s{�,� •..
W
4077,........Z....4 . E-.4 Ent gill gr..- . 1 - . .. SC'
a v ..
F m M O
1 0
44.*:::4111:
�� o;. ,�®p ,... . / ?gym
10 W d d 6
i 5 • ?� / C.M..
Z :w
RE t.'14 �' z W. f:/
L„,,,a yL�
1 8 g�` - O i-'-'=° O • �SOO r
{a
F
tVO Opn•WG Z . Yet
V.°
• 335 a u z
•N p 44.-pE V 11.NV 9.F,
4I O W 6••i••1
X z4 p
/ o
F F. N N
N /
City of Atlantic Beach - r APPLICATION NUMBER
i ;+l Building Department (To be assigned by th Building Department.)
A 800 Seminole Road
Atlantic Beach, Florida 32233-5445 APR 2 9 2n15
Phone(904)247-5826 • Fax(904)247-5845 /
E-mail: building-dept @coab.us IL _ _ Date routed:
City web-site: http://www.coab.us
APPLICATION REVIEW AND TRACKING FORM
Property Address: 92 6 �/9y I�T �d Department review required Yes No
/ Building
Applicant: / 7) r /7S1 'i.c/iO Planning&Zoning
Tre- a•uI•nistrator
Project: „6-7• . •ublic Works
Public Utilities
Public Safety
Fire Services
d y'I'S,i t.�•�.�t..-}..:� .-.._.§..-�.'3„_ -,.`�L.-C�, z 1f,: I:�t" 3l PS��.-., _
Other Agency Review or Permit Required Review or Receipt Date
of Permit Verified By
Florida Dept.of Environmental Protection
Florida Dept. of Transportation
St.Johns River Water Management District
Army Corps of Engineers
Division of Hotels and Restaurants
Division of Alcoholic Beverages and Tobacco
Other:
APPLICATION STATUS
Reviewing Department First Review: pproved. FVDenied.
(Circle one.) Comments:
BUILDING - c l ii v
PLANNING&ZONING P
Reviewed by: . �( c /v� Date:
TREE ADMIN.
Second Review: ['Approved as revised. Fe. enied.
PUBLIC WORKS Comments: c ecrEA aw
e /4 PUBLIC UTILITIES
PUBLIC SAFETY Reviewed by: Date:
tr-
FIRE SERVICES Third Review: 1121Approved as revised.e Denied. .
Comments:
4.
Reviewed by: / Date:
Revised 07/27/10