Loading...
1630 ATLANTIC BEACH DR EARLY POWER L EARLY POWER AGREEMENT & RELEASE CITY OF ATLANTIC BEACH Electric power is requested now under the conditions and terms of this fully executed Agreement& Release Job Address l Permit No. 5 SEg .a Service Type(Circle One): Overhead 6crgroundD We,the undersigned Creneral Contractor and Electrician,understand and agree: I, "Early Power" isurely for our construction convenience, it is t required by Codes and docs not substitute for Final inspections or the C/O(Certificate of Occupat _T-Mat must be issued before occupancy, and as such is at the discretion of the Building Official, 2. The City of Atlantic Beach will make a special inspection prior to the early power energizing. All rough inspections must have prior Approval, including meter base connections. 3. Occupancy or use of the new construction before a formal C/O constitutes Fraudulent use of the earl electric service. Such action is expressly prohibited. and penalized by The City of Atlantic Beach Ordinances. A violation of this Agreement shall result ►n a request for prompt removal of electric service after a twenty-four hour notice. 4. "Early Power"release authority is the Electrician and/or the Contractor and must not occur before: a. Equipment,devices and fixtures are installed(or blanked off)safely, b, Panel is complete with breakers and cover,and(labeling required at final inspection). c. Service connection and grounding is complete. d. The electric system has safely passed through electrical check. e. Meter can is permanently marked with address. f Temporary address numbers displayed(Permanent numbers arc required for C/O). 5. This fully completed form is to be submitted to the Building Department by band, mail or fax. b. Future such Agreements will not be accepted from those who violate any one of the above items. CONTRACTOR DATE Cg ZS I PRINTNAME ELECTRICIAN ATE oll PRINT NAME :�;;Z�'a�,V..�K 800 Seminole Road,Atlantic Reach FL 32233 Phonc:(904)247-5826 fait:(904)247-5845 httpa/www.ceab.us revised 01 30 09