Loading...
616 TIMBER BRIDGE LN FORM BD ELEV & DENSITY 4 per MI � IS SF6�r-- / ,15 Y � FORM BOARD ELEVATION CERTIFICATE DATE: PERMIT NUMBER: Co IC.� ADDRESS: lw#� A.A.S. WORK ORDER NO. REQUIRED SLAB ELEVATION ON CITY APPROVED SITE PLAN: /. .00 ACTUAL ELEVATION OF FORM BOARD OR GRADE STAKE: � 's ,�. 1' ` 1 z °L` SURVEY COMPANY NAME: ALL AMERICAN SURVEYORS OF FLORIDA INC. 6820 SOUTHPOINT PARKWAY, SUITE 4 JAX, FL 32216 (904) 279-0088 SIGNATURE OF SURVEYOR: (Party Chief UUES ProjNIVERSAL WorkordereNo: o. 159407-00187.0000 ENGINEERING SCIENCES Report Date: 8/24/2015 Consultants In:Geotechnical Engineering•Environmental Sciences Geophysical Services•Construction Materials Testing•Threshold Inspection09 Building Inspection•Plan Review•Building Code Administration 5561 Florida Mining Blvd So.,Jacksonville, 32257 - P:904296-0757 • F:904296-0748 _15, -Y S7 In-Place Density Test Report IU mlDt,1'' B" (/ Client: UES Technician: Jody Swathwood �' 160 Cape May Avenue Ponte Vedra, FL 32081 Date Tested: 08/24/2015 Project: Atlantic Beach Country Club Area Tested: Atlantic Beach Country Club Lot#167 Type of Test: Material: Fill Field: ASTM D-6938 Nuclear Gauge Metho Reference Datum: 0 =Top of Fill Laboratory: ASTM D1557 Modified Proctor The tests below meet the minimum 95%relative soil compaction requirement of Laboratory Proctor maximum dry density. aximum Field D Fill ptimum Dry Field Soil Depth Pass Test Density Moisture Density Moisture Compaction (inch) or Fail No. Location of Test Range (Pd) (%) (per m (%) 1 South comer of pad 0-1 ft 105.3 14.0 100.1 16.9 95 N/A Pas: 2 North comer of pad 0-1 ft 105.3 14.0 102.4 18.7 97 N/A Pas: 3 East comer of pad 0-1 ft 105.3 14.0 101.7 17.9 97 N/A Pas: 4 West comer of pad 0-1 ft 105.3 14.0 100.8 19.5 96 N/A Pas: 5 Center of pad _ 105.3 14.0 101.2 19.4 96 N/A Pas: To establish a mutual protection to Universal's clients,the Public and ourselves,all reports are submitted as confidential property of our clients and authorization