Loading...
Item 4A Public Works Project Status ReportPro ject Name Proj ec t No. Reclai med W ater Facili t y PUOSOS l nline Valve Inst a llation PU1404 PU1408 & Efflu ent Outfall Replacement PU1504 Con n ect Water Main across AlA t o Mallard Cove PU14 10 Up da t e Water M ode ls PU1502 We ll Logging PU1501 Replace Water Main on Se m in ole Rd. Fr om A tlantic Blvd. t o S-Way PU1503 Li ning of wet well at Mim osa Cove lift st ation PU1505 Li ning of wetwell a t Fairway Vi llas lift station PU1506 Clea n & Te levise Gra vi ty Outfa ll to ICW PU1507 Fe nce/Wall at WWTP PU1508 Re place Irrigat ion system with re use syst em at WWTP PU1 509 Russell Ten nis Court s 1&2 PM1401 Russell Park Renovation PM1501 Bull Pa rk Playse t PM 1504 Dutton Island Roa d Improvements PMlSOS Marsh M u ltipur pose Path PW1408 M ars h Ove rl ook & Kayak l aunch PW1409 Roberts Street Di t ch PW1404 PW1406& Sa ltair d ralnage/Stru dlvant sidewalk PW1411 PW1407 Sem i nole Streetscape PW 1412 Bike Racks & Show e r @ Beach accesses PW1501 Fran cis Avenue Drainage Improvements PW1502 Bego nia Street W6th t o W9 t h PW1503 Cit y Hall Pa rking Light Im provement PW1504 City of Atlantic Beach Major Public Works Projects F¥14/15 -Status 8/28/15 FVlS Budget Project Activit y Utilities $1 35,399 Proj ect comple t e $36,515 Complete Design com plet e. DEP & ACOE permit s receive d . Awaiting perm it from Coast Gua rd $331,62 5 -Wor k )oint f or 3 Beach Cities $126,662 Proj ect complete $30,000 Cons ultan t p utting system In t o model Proj ect de layed. Wi ll complet e modeling $30,000 project first Design und erway-pa rt o f Seminole Road $700,000 Str ee tscape pr oject $19,505 Complete $20,341 Complete $15,218 75% Compl ete $80,000 Bids r eceived on 7/15 were over bu dget. $20,000 Perfo rm i ng with Ci t y forces. Parks Projects $98,136 Complete Swale savings allowed t he f ollowing In this yea r b udget. 1. Fencing awarded 7/13. Wooden fen ce n ea r compl et ion . Backstops after Baseba ll se as on. 2. Multipur pose t rail bids awarded 7/27 3. Concession stand concrete replacement $250,000 aw arded 7/27. Concrete removed . $75,000 Complet e $25,000 Will not need. $97,220 80% complete -permitting underway Const r uction st arted 7/6. Completion $300,000 sc h ed ul ed 9/18. Public Works Projects $14,213 Construction compl et ed by DOT Cons t ruction st arted 4/20. Co m ple tion scheduled 10/16. 8-24 -Com miss ion $382,700 de let ed work o n David & Sylvan $966,660 Des ign 95% complete $20,000 Complet e $9 1,386 Complete· Fi na l inspection 7/22 $30,000 Design comp let e. $1 0,000 PO Iss ued. Co nst ruclon pend ing Notes AG ENDA ITEM fi 4A S EPTEMB E R 14,2 01 5 PU1408-Design/Permltting, PU1504-Construction Final inspection 6/1 7 In FY 1 5/16 Budget Design 95% complete Resea rch ing 75% complete Drainage swa l es comp let e by Ci t y f o rces savi n g approx $2SOK. Com bined With F115/16 project Design only FY 14/15 SO% FINO Fu nding Fun ded f or design o nly Stur divant sidewalk, M agnolia & Po insettia swa les substantially compl ete Bid d ing this fall CDBG funding Design onl y FY 14/15