Item 4A Public Works Project Status ReportPro ject Name Proj ec t No.
Reclai med W ater Facili t y PUOSOS
l nline Valve Inst a llation PU1404
PU1408 &
Efflu ent Outfall Replacement PU1504
Con n ect Water Main across AlA t o
Mallard Cove PU14 10
Up da t e Water M ode ls PU1502
We ll Logging PU1501
Replace Water Main on Se m in ole Rd.
Fr om A tlantic Blvd. t o S-Way PU1503
Li ning of wet well at Mim osa Cove lift
st ation PU1505
Li ning of wetwell a t Fairway Vi llas lift
station PU1506
Clea n & Te levise Gra vi ty Outfa ll to ICW PU1507
Fe nce/Wall at WWTP PU1508
Re place Irrigat ion system with re use
syst em at WWTP PU1 509
Russell Ten nis Court s 1&2 PM1401
Russell Park Renovation PM1501
Bull Pa rk Playse t PM 1504
Dutton Island Roa d Improvements PMlSOS
Marsh M u ltipur pose Path PW1408
M ars h Ove rl ook & Kayak l aunch PW1409
Roberts Street Di t ch PW1404
PW1406&
Sa ltair d ralnage/Stru dlvant sidewalk PW1411
PW1407
Sem i nole Streetscape PW 1412
Bike Racks & Show e r @ Beach accesses PW1501
Fran cis Avenue Drainage
Improvements PW1502
Bego nia Street W6th t o W9 t h PW1503
Cit y Hall Pa rking Light Im provement PW1504
City of Atlantic Beach
Major Public Works Projects
F¥14/15 -Status 8/28/15
FVlS Budget Project Activit y
Utilities
$1 35,399 Proj ect comple t e
$36,515 Complete
Design com plet e. DEP & ACOE permit s
receive d . Awaiting perm it from Coast Gua rd
$331,62 5 -Wor k )oint f or 3 Beach Cities
$126,662 Proj ect complete
$30,000 Cons ultan t p utting system In t o model
Proj ect de layed. Wi ll complet e modeling
$30,000 project first
Design und erway-pa rt o f Seminole Road
$700,000 Str ee tscape pr oject
$19,505 Complete
$20,341 Complete
$15,218 75% Compl ete
$80,000 Bids r eceived on 7/15 were over bu dget.
$20,000 Perfo rm i ng with Ci t y forces.
Parks Projects
$98,136 Complete
Swale savings allowed t he f ollowing In this
yea r b udget.
1. Fencing awarded 7/13. Wooden fen ce
n ea r compl et ion . Backstops after Baseba ll
se as on.
2. Multipur pose t rail bids awarded 7/27 3.
Concession stand concrete replacement
$250,000 aw arded 7/27. Concrete removed .
$75,000 Complet e
$25,000 Will not need.
$97,220 80% complete -permitting underway
Const r uction st arted 7/6. Completion
$300,000 sc h ed ul ed 9/18.
Public Works Projects
$14,213 Construction compl et ed by DOT
Cons t ruction st arted 4/20. Co m ple tion
scheduled 10/16. 8-24 -Com miss ion
$382,700 de let ed work o n David & Sylvan
$966,660 Des ign 95% complete
$20,000 Complet e
$9 1,386 Complete· Fi na l inspection 7/22
$30,000 Design comp let e.
$1 0,000 PO Iss ued. Co nst ruclon pend ing
Notes
AG ENDA ITEM fi 4A
S EPTEMB E R 14,2 01 5
PU1408-Design/Permltting,
PU1504-Construction
Final inspection 6/1 7
In FY 1 5/16 Budget
Design 95% complete
Resea rch ing
75% complete
Drainage swa l es comp let e by Ci t y
f o rces savi n g approx $2SOK.
Com bined With F115/16 project
Design only FY 14/15
SO% FINO Fu nding
Fun ded f or design o nly
Stur divant sidewalk, M agnolia &
Po insettia swa les substantially
compl ete
Bid d ing this fall
CDBG funding
Design onl y FY 14/15