Loading...
395 5TH ST - ROOF PERMIT INSPECTIONS REQUIRED FOR PERMITS To verify compliance with building codes,inspection of the work authorized at various points of the construction are required.The following inspections are typically for residential projects. Date: Initial: Date: Initial: Power Pole Swimming Pool Steel Swimming Pool Safety Piers Electrical Grounding&Bonding Underground Plumbing .When the pool and deck steel is in place but before it is covered. Underground Electric . Swimming Pool Final Foundation/Footing Slab Additional Inspections may apply to your project,if your project Retaining Wall Footing contains these elements. Formed Columns/Beams Rough Electric When forms and reinforcing steel, anchor bolts, sleeves, and inserts, and all Rough Plumbing/Top Out electrical,plumbing,and mechanical work is in place,but before concrete is placed. Rough Mechanical When all rough electric,plumbing,mechanical are complete but before any work is Structural Steel • covered up. When all structural steel members are in place and all connections are complete,but before such work is covered or concealed. House Wrap Tie-down Framing Connections 1co P Wall Sheathing Permit Type Rough Framing Roof Sheathing , y.i'"�'�iJ.e), Roofing In Progress ,Zto3K- j r ik `;J ` � • r j � r .1. Window Installation-Door J - Insulation Ceiling '��Jsilc) Z6.787 Insulation Wall o R•• Permit No. Exterior Lath 3°► S Viet"Scratch Coat Si . Job Address Drywall/Tile Backer Board 1tt AN r Rc,c,pt3 *When all wallboard is in place but before joints are taped and finished. Contractor Early Power POST THIS CARD WITH PERMITS Gas Rough IN FRONT OF BUILDING Gas Final Inspection Line:904-247-5814 When all gas piping is complete and wallboard is installed but before gas is attached to Must Call By 4PM Previous Day any appliance.All outlets must be capped and pipe pressurized at a minimum of 15 lbs. Building Department Fire Department Phone:904-247-5826 Phone:904-630-4789 Final Plumbing Fax:904-247-5845 Fax:904-630-4203 Final Electrical . Public Works/Public Utilities Final HVAC Phone:904-247-5834 Final Building Fax:904-247-5843 CC Final l2 ��� Construction Hours per City Code When all construction work including electrical,plumbing,an mec nical,exterior finish 7 am-7 pm Weekdays grading,required paving,and landscaping are complete and the building is ready for 9 am-7 pm Weekends occupancy but before being occupied.