395 5TH ST - ROOF PERMIT INSPECTIONS REQUIRED FOR PERMITS
To verify compliance with building codes,inspection of the work authorized at various points of the construction are required.The following
inspections are typically for residential projects.
Date: Initial: Date: Initial:
Power Pole Swimming Pool Steel
Swimming Pool Safety
Piers Electrical Grounding&Bonding
Underground Plumbing .When the pool and deck steel is in place but before it is covered.
Underground Electric
. Swimming Pool Final
Foundation/Footing
Slab Additional Inspections may apply to your project,if your project
Retaining Wall Footing contains these elements.
Formed Columns/Beams
Rough Electric
When forms and reinforcing steel, anchor bolts, sleeves, and inserts, and all
Rough Plumbing/Top Out electrical,plumbing,and mechanical work is in place,but before concrete is placed.
Rough Mechanical
When all rough electric,plumbing,mechanical are complete but before any work is Structural Steel
•
covered up. When all structural steel members are in place and all connections are complete,but
before such work is covered or concealed.
House Wrap
Tie-down Framing Connections 1co P
Wall Sheathing Permit Type
Rough Framing
Roof Sheathing , y.i'"�'�iJ.e),
Roofing In Progress ,Zto3K- j r ik `;J ` �
•
r j
�
r .1.
Window Installation-Door J -
Insulation Ceiling '��Jsilc) Z6.787 Insulation Wall o R••
Permit No.
Exterior Lath
3°► S Viet"Scratch Coat Si .
Job Address
Drywall/Tile Backer Board 1tt AN r Rc,c,pt3
*When all wallboard is in place but before joints are taped and finished.
Contractor
Early Power
POST THIS CARD WITH PERMITS
Gas Rough IN FRONT OF BUILDING
Gas Final Inspection Line:904-247-5814
When all gas piping is complete and wallboard is installed but before gas is attached to Must Call By 4PM Previous Day
any appliance.All outlets must be capped and pipe pressurized at a minimum of 15 lbs.
Building Department Fire Department
Phone:904-247-5826 Phone:904-630-4789
Final Plumbing Fax:904-247-5845 Fax:904-630-4203
Final Electrical .
Public Works/Public Utilities
Final HVAC Phone:904-247-5834
Final Building Fax:904-247-5843
CC Final
l2
��� Construction Hours per City Code
When all construction work including electrical,plumbing,an mec nical,exterior finish 7 am-7 pm Weekdays
grading,required paving,and landscaping are complete and the building is ready for 9 am-7 pm Weekends
occupancy but before being occupied.