Loading...
Item 4A - Public Works, Recreation and Building Department ReportsCity of Atlantic Beach Major Public Works Projects FY15/16 -Status 1/1/16 Proj ect Na m e Budget Proj ect Activit y Notes Utilitie s Effluent Outfall Replacement $320,000 Design complete. DEP & ACOE permits received. This is replacement of the end of the beaches combined Received final Permit from Coast Guard effluent pipeline and is cost shared by the 3 beach Cities. Will bid in first quarter of 2016. Atlantic Blvd Waterline Upgrade $100,000 Design only Waiting on water model completion Update Water System Model $30,000 Initial model built. Calibration started. Hyd r ant field flow tests com p lete. Well Loggi ng -6 wells $130,000 This is a down hole check of the structural Not started integrity of our drinking water wells. Replace Water Main on Seminole Rd. $700,000 Design underway-part of Seminole Road Design 99% complete From Atlantic Blvd. to 5-Way Streetscape project WTP2 North Fence Replacement $10,000 Pricing Replace Seaspray water services $100,000 Forma l bids received 12/2 Work needed because of r ecurring line breaks and accompanying outages Sewer Line r ehab Sea Oats $200,000 Not started Potenti al grant may supplement Phosphorus Treatment Improvements $225,000 Preliminary engineering Report completed. Received grant to offset portion of cost. WWTP Engineering design underway. 2 repairs Gravity Outfall to ICW $30,000 Not started Combined Pl ant Renewal and S27s,ooo Packaging and bid d ing for potentia l economy. PO issued for engineering support. Replacement Soft Starts WTP 1,2,3 $10,000 Chlorine AutoContro l $31,00 0 Control Bubbler System $15,000 LS Control Panel $19,000 LS ABCD Softstarts $55,000 Replace Kruger Disks $6,000 2 new Infl uent Screens $20,000 Repl Eff Pump ##2 $50,000 Repl RAS Pump $50,000 Replace Influent Pump $22,000 Parks Projects Russell Park Renovation $160,000 New swing set installed. Other improvements being planned . $30K grant may supplement funding Bull Park lmprovemeots $35,000 Pricing new fence landscapi ng complete. Swin g replacement in procurement process . Twin Lake Parks Design $25,000 Design only Concept options design started. Concepts due January 2016. Marsh Multipurpose Path $540,000 ACOE permitting for wetland mitigation $50% FIND Grant fuhded. 95% design complete underway. Working MOU with COJ. Vet Park Playset Replacement $40,000 Pricing Public Works Proj ects Seminole Road Improvements $900,000 Design 95% complete Bidding in Spring Francis Avenue Drainage $650,000 $100% CDBG funding. Received CDBG Contract Anticipate start of construction January 2016. Flyer sent to Improvements 11/20. neighborhood 12/15. Beach Renourishment $0 Scheduled for summer of 2016 100% paid with Federal and County funds 2016 Resurfacing Program $330,000 Bori ngs complete. Contracting for construction Will include resurfacing of Seminole from Plaza to cui de sac . Construction 1st quarter of 2016 Ahern Bike Plaza $15,000 Installation by City forces in 1st quarter of 2016 Grading complete. Rack installation underway. near Lifeguard station. Atlantic Blvd Bike Plaza $50,000 Negotiating with property owner for location. Design not started . Sherry Safe Route to School Si dewalk $0 8' sidewalk along Sherry & Seminole from Ahern Design & survey recently started. Neighborhood meeting to 17th. Design and construction funded by DOT. scheduled for 1st quarter of 2016. Construction scheduled for second half of 2019. Police Building $2,892,700 Permitting Construction p r icing to start in January Featured Events In November One Time Facility Rentals Special Events/Permits - After School Programs City Sponsored Events .~ ""' City Contract Programs - Upcoming Ev ents & Prog ra m s in December --- Recreation Programs Special Events City Commission Report November Z015 #of registrations/ Events, Rentals, & Facilities applications MarshFest, Songwriters, Artshow and a Exhibit Adel e Grage 12 Bake r Ce nter 3 Jordan 1 Weddings on beach or parks 0 Pavilions & Parks 4 Ca mping Dutton 4 Beac h han dicap chair 0 Other -Vet Park, Sk, Natu re day, etc 5 Party -Bl ock Party, Party in the park 2 Fires on t he beac h 15 Donner After School Program 30 Jordan After Sc hool Program 65 Seniors @ the Bake r Center Songwriters' Conce rt Zum ba @ Jordan Park Marsh Fest Senior & City Lu ncheon Art Show/Reception Cooking Class @ Jord an Park Fla g Football 56 ABE T -Children's Perfo rmances AB ET Perform ances Tennis-Beaches Tenni s ABAA -Baseball Holid ay Celebration & Tree Lightin g Fl ag Football Playoffs Art isa ns' Falre I Toy Drive & Angel Tree -! Toy Party #of occurrences 12 3 1 0 4 4 0 5 2 15 18 18 7 1 4 1 1 1 1 3 2 6 I I AGENDA ITEM # 4A JANUAR Y II, 20 16 #of It of staff/ vol, participants/ comm ittee attendees attended 30 per day 4 tuto rs/1 staff 65 per d ay 6 tutors/lstaff 8 ea t ime 1 65 0 8 ea time 1 486 4 65 2 50 1 10 1 56 ea time 1 60/68 0 36/42/57/ 39/28/54 0 46 t o tal 0 300 total 0 I -- I BUILDING DEPARTMENT MONTHLY ACTIVITY REPORT PERMITS ISSUED FOR THE MONTH OF November 2015 INSPECTIONS PERFORMED No. PERMITS PERMIT COST CONSTRUCTION VALUE BUILDING: 203 SINGLE FAMILY/ SF ATTACHED 15 $15,118.76 $2,459,724.00 ELECTICAL: 45 NEW DUPLEX/ MULTI-FAMILY 0 $0.00 $0.00 PLUMBING: 77 RESIDENTIAL ADDITIONS 6 $5,793.00 $1,273,000.00 MECHANICAL: 48 RESIDENTIAL ALTERATIONS 15 $2,428.76 $183,203.00 COMMERCIAL NEW 0 $0.00 $0.00 TOTAL: 373 COMMERCIAL ADDITIONS 0 $0.00 $0.00 COMMERCIAL ALTERATIONS 2 $1,045.50 $149,000.00 POOL 3 $788.01 $31,882.00 TREE REMOVALS ELECTRICAL 31 $3,012.20 N/A INCHES REMOVED: 0 MECHANICAL GAS 5 $387.00 N/A INCHES PRESERVED: 0 MECHANICAL HVAC 27 $2,821.00 N/A INCHES RELOCATED: 0 PLUMBING 32 $3,327.00 N/A INCHES PLANTED: 0 ROOFING 17 $1,674.20 N/A INCHES PAID INTO WINDOW/DOOR 9 $923.12 N/A TREE FUND: 0 DEMOLITION 3 $400.00 N/A TOTAL: 0 SIGNS 0 $0.00 N/A FENCES 8 $280.00 N/A DRIVEWAY /ROW 10 $245.00 N/A REINSPECTION FEES: $595.00 SIDING 5 $488.00 N/A TOTAL 188 $38,731.55 $4,096,809.00 SURCHARGE COLLECTED: $523.88