Item 8A - Seminole Rd Drainage ImprovementsAGENDA ITEM: SUBMITIED BY: DATE: BACKGROUND: BUDGET: CITY OF ATLANTIC BEACH CITY COMMISSION MEETING STAFF REPORT Pg 1 of 2 Seminole Road Drainage Improvements Douglas E. Layton, P.E. Public Works Director January 5, 2016 AGENDA ITEM# SA JANUARY 25,2016 Seminole Road is budgeted to be reconstructed from Atlantic Blvd to 5 points. Features desired in the project were stormwater, water, sidewalk and streetscaping improvements. Genesis was selected as the design firm and the Commission awarded a design contract to Genesis early in 2014. On September 30, 2014, a neighborhood meeting was held to obtain public input on the 30% conceptual design. Approximately 30% of the neighborhood attended the 9/30 meeting. On October 13, 2014, the Commission discussed the design features contained in the conceptual design. Public Works was asked to hold the design at the conceptual stage and come back to the Commission with more illustrative graphics and further consideration of design options. On 1/26/15, the Commission gave specific guidance on many of the project's design features. The design guidance from that meeting is attached for easy reference. During discussion of the planned improvements with DOT on June 11, 2015, DOT suggested realignment of the intersection of Seminole Road with Atlantic Blvd. As this design option aligns with one of the Commission's strategic goals of improving the main entrances to the City we felt it necessary to bring this option to the Commission for consideration. The project is ready to bid in its current design. $1,600,000 was budget for this work in FY 14/15 and reaffirmed and included in the FY'15/16 budget. Seminole Road Improvements Pg 2 of 2 AGENDA ITEM# SA JANUARY 25, 2016 Our Design Consultant prepared the attached memo dated 6/24/15 explaining the additional cost for realigning the intersection could be as much as: Design: Construction: $ 53,500 $655,000 $708,500 These funds are not currently budgeted. RECOMMENDATION: Obtain a consensus of the Commission to move forward with bidding of the project utilizing the current design options without realigning the intersection. ATTACHMENTS: Design guidance of 1/26/15 Genesis letter of 6/24/15 Graphics for Intersection realignment option REVIEWED BY CITY MANAGER: -:?:f f/~ ;«_4{ Nelson Van Liere, City Manager City of Atl antic Be ach Seminole Road Improvem e nts Feature Opt ions Recomm e nded Pro Con PW Com ment Cu rre nt Des ign Project Build No Build Commission Level Replacement of aged Cost. Neighborhood Old water & storm piping replacement, nusiance Decision storm & water piping. concerns flooding, beautify major City street Beautification. Reduce BUILD nusiance flooding Stormwater Bioswales Build La rge Pond Bioswales Landscaping allowed in A pond would reduce park Stormwater treatment required by SJRWMD if Treatment bioswales. less "yards" space road reconstructed used. Curbing Standard Miami Standard Protects swales. Ext ends 5 Concern expressed about Standa rd curb important to reduce swale point look. appearance of standard maintenance. Curbs are required to direct *MIAMI CURB curb . Reduces ability to storm water to treatment. park on swales/grass Parking Minimize Eliminate Minimized Allows current use. Neighborhood concern. Reduced to 5 spaces per block to balance Beautifies and organizes Odinance currently current use and neighborhood concern. Pl us *ELI MINATE All parking. Replace s parking prohibits. Enforcement additional parking at Russell/Howell Park. Some PA RK I NG eliminated by ped path. issues. Concern about residents in favor. Parking width is 9-1/2'. Existing grass is damaged opening door into traffic. Midsize car is 6' wide by parking. Swale Plantings Grass Plantings Plantings improve Grass reduces maintenance Plantings will increase maintenance budget Landscaping beautfication and increases ability to park approx $8,500/yr if performed by City. Currently expect maintenance by residents. 8' Ped Path-Co ns truct Repl ace existing 4' 8' ped path Improved path use & Loss of 4' driveway parking Ped path in this location meets an unfunded Westside sidewalk w/4' or 6' safety. Reduced cos t on west side & greens pace portion of the safe path to school plan. 8" is minimum width for multipurpose path per DOT standards 4" Ra is ed Construct Eliminate Construct Increased safety. Speed "Bumpy" t raffic calming on Included for pedestrian safety and t raffic calming Crosswalks reduction through road Irrigation Construct Not Construct Not Construct Will help maintain Cost. Water usage Not in current project budget. Approx $30K landscaping appearance initial cost. and allow non-native species use 4' Bike Paths Construct Not Construct Not Construct Allows on-street bike Increases road width 8'. Ped path allows biking by casual bikers. Serious traffic Loss of "yard." & bikers currently use East Coast. Not in current greenspace. Increased cost budget. about $30K. Street Lights Construct Not Construct Design Neighborhood desired. Cost Street lights for ped path are currently being Safety enhancement designed. Plan is to minimize cost and bid as alternate for funding decision at award. $220K current estimate OakTree Islands-Construct Not Construct Not Construct Ability to include Oaks in Concern with safety and 3 potential locations identified. Not currently in 12' W X 62' *ONE TREE ISLAND project. Lighted tree driveway access. Loss of design. Adds desirable City entrance feature length per code NEAR ATLANTIC would beautify "yard." Cost. near Atlantic. 10' width crepe myrtle island would be 52' length. Wider Driveways Widen Replace existing Replace existing Minimize parking loss due Not in budget 10' x 22' is approximately $1,600 per widened to increased s/w width drive to r/w. Resident would have additional cost. 3'x 3' Driveway Construct Not Construct Construct Minimal cost Ususual This is an unusual, low cost feature to assist Cart Pads *NO CART PADS citizens access driveways on trash days * Enlarged note under "Recommended Current Design Column" Depicts Commission Guidance in the January 12th 2015 meeting different than Public Works Recommendation June 24, 2015 Doug Layton, P.E. Public Works Dire ctor City of Atlantic Beach MEMORANDUM RE: Seminole Road Re -alignment at Atlantic Blvd. Doug, AC€NOA fTEM H 8A JANUARY 25,2016 At the June 11, 2015 meeting with FOOT permit sta ff, it was recommended that the City eva luate re-aligning the intersection of Seminole Road to form aT-intersection at Atlantic Blvd . AT-intersection would provide for additional safety and improved operations while enhancing the intended gateway into the City of Atlantic Beach. Following is a breakdown of anticipated costs to complete the design and r eco nstruction of this intersect ion . Plea se note that th ese costs r epresent a preliminary opinion based on concept sketche s and may not reflect actua l costs. A sketch depicting the proposed intersection is attached. Additional Design Costs -$53,500 • Roadway/Sidewalk Design -$10,000 • Water/Sewer laterals and serv ice s De sign -$2500 • Signalization Design -$4500 • Stormwater De sign -$2000 • Land sca pe/Hardscape Design and Irrigation retrofits -$7000 • Lighting Design (pedestrian and l and scape lighting} -$2500 • FOOT Coordination -$5000 • Utility Coordination -$2500 • Additional permit coordination-$1500 • Additional graphics-$1000 • Gateway Architecture ele ments -$15 ,000 Additional Construction Costs-Seminole Road -$210,000 • Roadway, Curbing, Sidewa lk, Drain age. Striping, Sign age -$95 ,000 • Gateway Landscaping -$15 ,000 • Gateway Structures-$80,000 • Decorative Lighting -$10,000 • Utility Reloc ation (Wa ter/S ewe r services}-$10,000 Additiona l Construction Costs-Atlantic Bl vd -$145,000 • Atlantic Blvd. Construction (Median work, repaving, restriping)-$65,000 • Atlantic Blvd. M edia n Landscapin g-$5000 • Signal Reconfiguration -$75,000 NOT E: Cos ts for relocation of private utilities not inclu ded. If yo u have any co mments or questions, pl ease do not hes itat e to co ntact me. AGENDA ITEM #SA J ANUA RY 25,2016 AGENDA I TEM# 8A JANUARY 25,2016 ! ~ 1'NTERCHANGE MODIFICATION )>l DESIGN OPTION c ........ C... SEMINOLE ROAD & ATLANTIC BLVD. QkC: GATEWAY DESIGN FEATURE MODIFY TRAFFIC LIGHTS-TYP. j / RE-ALIGN PEDESTRIAN / STRIPING WITHIN ROW. c ATLANTIC BLVD. ·--! 5l-r-l!!§il•5i;;LJ;;;--.Jo\.....,'!!' ~~~ t .. (._, ........ GENESIS GROUP I a • Ill f I I I 0 .. I 0 • l ~ t I I 'f •• ,., fAr>r•r~Y P AfUl Coli! II':~· •uoiC HI, JACot•O .. YU l lll fl .. ,,. "*-• • .,. ''••~• '"•••• ~~ ''*• .... a.-....... ,..._ ..... _ __. ····-" ······-· ATLANTIC BEACH, FLORIDA AGENDA ITEM #SA JANUARY 25,2016 ! INTERCHANGE MODIFICATION -! DESIGN OPTION -·~--------------~ o~. ~ SEMINOLE ROAD & ATLANTIC BLVD. ·--! ~15l -!!!'iiii!-!liiiiw~....:~~, ~~r l *5-,._, ...... ,. ATLANTIC BEACH, FLORIDA AGENDA ITE M# 8A JANUARY 25,2016